Imran Khan

Imran Khan

E&I Engineer

Followers of Imran Khan445 followers
location of Imran KhanLahore District, Punjab, Pakistan

Connect with Imran Khan to Send Message

Connect

Connect with Imran Khan to Send Message

Connect
  • Timeline

  • About me

    Masood Textile mills.

  • Education

    • University of Engineering and Technology Taxila, Pakistan

      2014 - 2016
      Master in science of electrical engineering and control system(conti.....) Power A

      Activities and Societies: IEEE

    • GC UNIVERSITY OF FAISALABAD

      2004 - 2006
      FSc (PRE-ENGINEERING) Pre-Engineering A
    • Govt United muslim high school 97 R B

      2002 - 2004
      Matric (Secondary School Certificate ) Science A
    • The University of Faisalabad

      2007 - 2011
      Bachelor of Engineering (B.E.) Electrical, Electronics and Communications Engineering A

      Activities and Societies: Captain of University Cricket Team Football Athletics Scholarship in four semesters from university Acheived 3rd position (Bronze Medal) in engineering.

  • Experience

    • FLOWTRONIX (FT)

      Jan 2012 - Dec 2012
      E&I Engineer
    • Descon Engineering Limited

      Feb 2013 - now
      E&I Engineer

      PROFESSIONAL SUMMARY (TOTAL EXPERINCE 06 YEAR) Job Responsibilities include:.• Main Switch Gear Room (MSGR), Installation & Termination of Panels (MV, LV), Transformer 4500 KVA Installation• Cable tray Installation.• Diesel Genset Installation.• Cable Termination LV, MV, HV and control cable.• Fire alarm system installation.• Building and Plant Lighting.• Overhauling of LV, MV motors.• Installation of Earthing & Lightning System..• Preparation of Inspection and Test Plan, Construction Quality Procedure and Method of Statement• Review and Inspection of all Electrical Material, prior to Installation.• Daily monitoring the Construction Activities.• Responsible for the over-all implementation of Quality Control related electrical works accordance with project specifications and Engineering Standards.• Verify the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.• Monitor the Underground installations; check the required burial depth and spacing requirements to adjacent installations, prior to backfilling• Testing of cable meggering and HI – POT test.• Inspection of Electrical Equipment function test and Illumination level testing of lighting system.• Inspection of electrical installation Panels Monitoring control panel wiring, Termination, cable routing & cable tray installation.• Witness for Pre-commissioning of motor Solo Run activities.PROJECTS1-PAPCO (10056) Port Qasim , Karachi2-FTMM Project (10053) Faisalabad3-PAKISTAN ALUMINIUM BEVARAGE CAN LTD.(1165)4-FPCL (FUJY POWER COAL LIMITED 118MW KARACHI.(1156)5-GHAMBAT SOUTH GAS PROCESSING PLANT (1160) 6-11 KV DG SETS AND 12MVA POWER SUPPLY KANUPPKARACHI.7-MOL (Makori Gas Processing Facilities) PROJECT KARAK 8-IFL (Ibrahim Fiber Ltd.)Polyester Plant. Show less

    • Masood Textile Mills Limited

      Feb 2020 - now
      Deputy Manager
  • Licenses & Certifications

    • Excel

      Descon Engineering Limited
  • Honors & Awards

    • Awarded to Imran Khan
      3rd Position - Mar 2013 Bronze MedallistDean's Honor List