
Dan Laing
Mill Operator

Connect with Dan Laing to Send Message
Connect
Connect with Dan Laing to Send Message
ConnectTimeline
About me
Experienced Project and Technical Manager for the underground hardrock mining industry. Life long learner and educator.
Education

Haileybury School of Mines
1984 - 1987Mining Technologist Mining Engineering Technology
University of Fredericton
2020 - 2024Master of Business Administration - MBA Consulting Leadership
Ryerson University
2012 - 2018Project ManagementCompleted a certificate in Project Management

University of Toronto
2001 - 2006Certificate in Management Fundamentals
Queen's University
1991 - 1995BSCE Mining Engineering
Experience

Golden Shield Resources Limited
May 1987 - Mar 1988Mill OperatorOperator for multiple processess within a gold milling operation.

Armistice Resources Limited
Apr 1988 - Aug 1989Geological Technician/SurveyorCore sampling and surveying for shaft sinking and lateral development.

Renabie Gold Mines Limited
Feb 1990 - Jan 1991SurveyorSurveyor in a sublevel cave operation.

Alex MacIntyre and Associates Limited
Jan 1991 - Aug 1991SurveyorSurveyor for underground tram project at Inco's Birchtree Mine.

Williams Operating Corporation
May 1992 - Aug 1992SurveyorPerformed the tasks of an underground surveyor including line ups for drifts and follow up surveys.

Teck Corona Operating Corporation
May 1993 - Aug 1993Longhole TechnicianLayout of drill holes for long hole drilling and layouts of raises and drainholes.

Teck-Corona Operating Corporation
May 1994 - Aug 1994DeckmanResponsibilities included transferral of materials from surface storage to headframe for shipment underground; monitoring of headframe ore and waste bins; operation of heavy equipment.

Battle Mountain
May 1995 - Jul 1996Junior Mining EngineerResponsibilities included: ventilation monitoring; blasthole and cablebolt layouts; special projects and assisting with other engineering departments (surveying, etc.)

Falconbridge
Aug 1996 - Aug 2005Front Line Supervisor (Production & Oreflow) - responsible for development and production activities in the lower mine as well as underground & surface crushing and conveying activites.Mine Operations Team Member - year long placement in underground operations including longhole blasting, materials handling and development activities.Lower Mine Planning Engineer - responsible for planning of 1 MT/year longhole operation. Assisted implementation of the Amine (ACAD planning software) system and initial simulation studies for Mine D. Show less
Project Engineer
Oct 2004 - Aug 2005Control Room Operator & Dispatcher
Oct 2003 - Oct 2004Mine Supervisor
Aug 2002 - Oct 2003Front Line Supervisor/Operations Team Member/Planning Engineer
Aug 1996 - Jul 2002

Xstrata Nickel
Aug 2005 - Sept 2006Mine Planning EngineerResponsible for mine planning for cut & fill and blasthole stoping

Vale Inco
Sept 2006 - Jun 2011Senior Project EngineerResponsible for surface construction activities at a mine rehabilitation project. Works included construction of waste water treatment plant; production hoist house & headframe, raisebore program for main fresh air and return air system; installation of fresh air fans and heater house; installation of return air raise fans; administration/dry complex; drilling of slick line and grouting program for surface raises.

DMC Mining Services
Jun 2011 - Nov 2012Senior Project EngineerVictoria Mine Project

First Nickel Inc.
Nov 2012 - Aug 2014Chief Mine EngineerResponsible for coordinating and providing engineering services to the operating department in order to meet the mine plan.

DMC Mining Services
Aug 2014 - Jul 2015Senior Project EngineerCoordinated shaft works input for Basic Engineering Study conducted for KGHM's Victoria Project.

KGHM International
Jul 2015 - Jul 2018Coordination of engineering for Sudbury Operation projects. Providing leadership to the Morrison Mine in order to promote a workplace committed to Zero Harm while delivering predictable, reliable production while continuously improving. Responsibilities include: overseeing the development and maintenance of long and short term mine plans and designs; development of mine budget; recommending ways to improve mine operating performance; identifying ways to reduce capital and operating costs and delays and review of production methods, mine design, material handling and manpower.
Engineering Lead - Strategic Projects
Nov 2017 - Jul 2018Mine Manager
Mar 2017 - Oct 2017Chief Mine Engineer
Jul 2015 - Mar 2017

Stantec
Jul 2018 - Mar 2022Project Manager
Robert M. Buchan Department of Engineering, Queen's University
Jan 2019 - nowAdjunct Lecturer
Vale
Apr 2022 - Dec 2023Thompson Mines Technical Services Manager
Alamos Gold Inc.
Mar 2024 - nowProject Manager - Plants - Island Gold - Phase 3
Aug 2024 - nowConstruction Manager - Plants - Island Gold - Phase 3
Mar 2024 - Aug 2024
Licenses & Certifications
- View certificate

Inspiring Leadership Through Emotional Intelligence
CourseraJan 2015 - View certificate

Business Innovation Foundations
Lynda.comNov 2017 - View certificate

The Age of Sustainable Development
CourseraApr 2014 - View certificate

Operations Management Foundations
Lynda.comNov 2017 - View certificate

Excel Data Analysis: Forecasting
Lynda.comNov 2017 - View certificate

Financial Markets
CourseraApr 2014 
Indigenous Canada
University of AlbertaJan 2021
Recommendations

Francisco angel lasso
Unlimited Chief EngineerPanama
Kristen george
Professional Development ManagerScottsdale, Arizona, United States
Olga timokhova
"Руководитель отделения квалификации и качества – Научно-производственный центр ""НовАТранс"""Sverdlovsk, Russia
Matt potvin, mba
SaaS for Investment Managers| Staff ConsultantBoise Metropolitan Area
Bharat s
Senior DevOps Engineer at Aircom Solutions private limited | AWS | GCP | Kubernetes | DevOps | Terra...Vishakhapatnam, Andhra Pradesh, India.webp)
Zeeshan aly (shan)
Consulting | Advisory | Audit, Finance, Tax, Corporate, Islamic Investment & Banking, HR, e-commerce...Karāchi, Sindh, Pakistan
Mina naguib
Art Director / Senior Graphic Designer at Kite Design StudioCairo, Egypt
Aayush sharma
Full-Stack MERN Developer | Knight@LeetCode | 6-Star@HackerRankDelhi, India
Ryan smoyer
Sr. Manager - Monitoring, SRE and Disaster Recovery at Comerica BankDetroit Metropolitan Area
Jhon ramírez
Controller Zonal en Jerónimo MartinsBogota, D.C., Capital District, Colombia
Laurel parker
Case Manager, WAGECSydney, New South Wales, Australia
Mathijs brunnekreef
Owner of Northwest FilmsGroningen, Groningen, Netherlands
Luba lomholt
ArkitektArkin Design
José alejandro ramírez parada
Chemical EngineerErlangen, Bayern, Deutschland
Prashant shinde
Additive Manufacturing /CAD-CAM-CAE / Quality Assurance / Electric mobilityPune, Maharashtra, India
Deepak tayal
SMTS mentor graphics(siemens EDA)Delhi, India
Ivan spagnol
Funcionário administrativo na Prefeitura municipal de itapeviСан-Паулу, Сан-Паулу, Бразилия
Barry mcevoy
Business Development Representative at IntegriLeadsIreland
Deepak jagtap
Executive Director,India
Dominique cornitcher
Assistant Development Officer, Planned GivingPhiladelphia, Pennsylvania, United States
...