Munim Shaukat

Munim Shaukat

Shift Engineer

Followers of Munim Shaukat688 followers
location of Munim ShaukatLahore, Punjab, Pakistan

Connect with Munim Shaukat to Send Message

Connect

Connect with Munim Shaukat to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer|Project Engineer|Consulting Engineer

  • Education

    • P.A.E.C Higher Secondary School

      2006 - 2008
      High School Mechanical Engineering A
    • University of Engineering and Technology, Lahore

      2013 - 2016
      Master’s Degree Engineering/Industrial Management 3.263 CGPA
    • University of Engineering and Technology, Taxila

      2008 - 2012
      Bachelor's Degree Mechanical Engineering 3.34 CGPA
  • Experience

    • Orient Energy Systems (Distributors of GE Energy in Pakistan)

      Nov 2012 - Oct 2015
      Shift Engineer

      Operation and Maintenance of Jenbacher Gas Engine J GS 320.Key Responsibilities: 1. Operation and maintenance of Jenbacher Gas Engine J GS 320. 2. Startup and Shutdown of Gas Engine. 3. Preventive, Predictive and Break down maintenance of Gas engine based Power Plant.4. Troubleshooting of gas engine based Power Plant.5. Daily Generation Reports, Stoppage Reports and Monthly Generation Reports.

    • National Engineering Services Pakistan (Pvt) Limited (NESPAK)

      Oct 2015 - now
      Senior Engineer (Mechanical)

      • Involved in Design review of Francis Turbines, MIV, and the Balance of Plant Mechanical work of the Sustainable Hydropower Projects (RCT), Uzbekistan.• Participated in detailed design review of 800 MW Mohmand Dam Hydropower Project Electro-mechanical equipment, Turbines, Balance of plant Mechanical, Powerhouse Bridge Crane, HVAC System, MEP Works, and Water Supply system.• Participating in the design review and construction supervision of Mechanical system works of the Upgradation and Refurbishment of 1000MW Mangla Power Station Comprising Balance of plant Mechanical, Powerhouse Bridge Crane, HVAC System, MEP Works, and Water Supply system.• Participated in detailed design review of 21 MW Tangir Hydropower Project Electro-mechanical equipment, Pelton Turbines, Balance of plant Mechanical, Powerhouse Cranes, HVAC System, MEP Works and Water Supply system, and permanent facilities.• Involved in Design review, installation/erection supervision, and testing commissioning of the Mechanical Equipment & Systems of the 102 MW Gulpur Hydropower Project Comprising Turbine, Governor, Balance of plant Mechanical, Powerhouse Bridge Crane, HVAC System, MEP Works, and Water Supply system.• Supervised the Installation activities of Gantry Crane at Tunnel & Steel Liner Factory at 969 MW Neelum Jhelum Hydropower Project.• Carried out Detailed Design and Supervised the fabrication and installation of Fire Fighting Water Storage Tank at 84 MW New Bong Escape Hydropower Project, Pakistan.• Participated in Design review and Technical Bid Evaluation of the 20 MW Hanzel Hydropower Project.• Involved in the Design Review and Technical Bid Evaluation of the 16MW Nalter Hydropower Project.• Preparation of Proposals and feasibility studies of Small and Mini Hydropower Projects. Show less

  • Licenses & Certifications

    • Registered Engineer

      Pakistan Engineering Council
      Nov 2012