Mohamed Ibrahim Mousa

Mohamed Ibrahim Mousa

Innovation planning Participant

Followers of Mohamed Ibrahim Mousa5000 followers
location of Mohamed Ibrahim MousaRabigh, Makkah, Saudi Arabia

Connect with Mohamed Ibrahim Mousa to Send Message

Connect

Connect with Mohamed Ibrahim Mousa to Send Message

Connect
  • Timeline

  • About me

    Senior Cost Control Engineer at ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS

  • Education

    • Abbass El Akkad Language School

      2004 - 2014
      High School

      Science , Algebra , Mechanics , Geometry , Calculus , Chemistry , Physics , English , Arabic

    • Ain Shams University

      2013 - 2018
      Bachelor’s Degree Electrical and Electronics Engineering 73.9%

      Activities and Societies: APEC,MECA,IEEE Engineering studiesElectric EngineeringPower Engineeringpower system.control.Generation economics.Electrical machines.

  • Experience

    • INJAZ Egypt

      Oct 2013 - Mar 2014
      Innovation planning Participant

      participated in your innovation camp- Worked in team to innovate and exchange experience.- brainstorm ideas on how to approach a specific project.- Design Thinking to solve complex problems, and find desirable solutions for real life problems.- Experiment with idea generation, critical thinking, ways of knowing, problem-solving and rapid-prototyping

    • North Cairo Company for electrical distribution

      Jul 2014 - Jan 2014
      Trainee

      -Visited Transformers factory and observed step by step building a transformer.-Shown the tests done on the transformer to measure efficiency.-Learned about secondary distribution and the concept of ring main unit.-visited and learned on a distribution transformer in kiosk .-visited distribution station.

    • APEC

      Oct 2014 - Jan 2015
      Trainee

      Learned about The emergency distribution ,UPS system.Had an introduction about lighting systems and schemes.Discussed the future of electric generation.

    • IEEE ASU branch

      Oct 2016 - Jun 2017
      Media member

      -innovate and brainstorming idea to make the most success of the events.-Design the flyer and the roll ups.-collaborate with the logistics team to design and make t-shirts for the members.

    • RTC consultant

      Oct 2018 - Mar 2019
      Electrical Site Engineer
    • ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

      Mar 2019 - now

      • Created Project Cost Budget for Megaprojects along with the cost baseline at the beginning of the project. • Supported the PMT decisions of assets purchase, self-execution, value engineering, ... etc. by simulating the decision cost impact and comparing it versus the other alternatives• On a daily basis, made budget/payment terms verification for each (PO, SC, Fixed Asset, Manpower...etc.) and reported the deviation and impact if any.• Using Power PI Issued Monthly Cost reports with the area of concern, recommended corrective actions, and mitigation plan.• Monitor and control all indirect costs and (running cost, indirect manpower, … etc.) versus budget & project progress and apply indirect cost optimization• Provide accurate cost Impact estimation for Claims & Variation orders.• Used Manpower planning application to ensure Adhering to Indirect Manpower Budget. • Prepare the updated financial plan on a monthly base.• Prepared project invoicing plan and updated it on a bi-weekly basis based on actual progress and reported the deviation of actual invoicing versus plan/update.Project No 01: Reinforcement of Rabigh Combined Cycle Power PlantLocation: KSA.Client Entity: Saudi Electricity Company (SEC).Main Contractor: JV El-Sewedy Electric PSP & SiemensContract Type: Lump Sum.Project Duration: 24 Months.Contract Value: 1.02 billion USD.Project No 02: Installation of 132 kV UGC develop power supply for Royal Commission of Al-Ula project.Location: KSA.Client Entity: Saudi Electricity Company (SEC).Main Contractor: Al-Sharif Group Holding.Contract Type: Lump Sum.Project Duration: 24 Months.Contract Value: 420,000,000 SAR.Project No 03: Construction of Abu Zahra wastewater treatment plant (30,000 to 60,000 m3/day).Client Entity: The Construction Authority for Potable Water and Waste Water.Main Contractor: El-Sewedy Environmental Solutions.Contract Type: Price Committee.Project Duration: 18 Months.Contract Value: 950,000,00 EGP Show less * Worked in Gas Insulated Substation (GIS) testing.* Worked in Medium Voltage Switchgear and outdoor equipment testing.* Made Substation Commissioning tests in front of witnesses.* Created an Execution plan for the commissioning department.* Worked on Tanzania Air Insulated Substation Manpower and Equipment Plan.Projects:- SHAT El-Arab Substation (400/132KV), IRAQ, Jan. 2020 - Apr. 2020- SHATRA Substation (400/132KV), IRAQ, Oct. 2019 - Jan. 2020- MOTHANA Substation (400/132KV), IRAQ, Jun. 2019 - Oct. 2019- Manshiat Nasser Substation (220/66/11KV), Egypt, Mar. 2019 - June 2019 Show less

      • Senior Cost Control Engineer

        Apr 2020 - now
      • Commissioning Engineer

        Mar 2019 - Apr 2020
  • Licenses & Certifications

  • Volunteer Experience

    • organizer

      Issued by Resala Charity Organization | جمعية رسالة للأعمال الخيرية on Sept 2009
      Resala Charity Organization | جمعية رسالة للأعمال الخيريةAssociated with Mohamed Ibrahim Mousa