Carlo Narcisi

Carlo Narcisi

System manager

Followers of Carlo Narcisi758 followers
location of Carlo NarcisiItalia

Connect with Carlo Narcisi to Send Message

Connect

Connect with Carlo Narcisi to Send Message

Connect
  • Timeline

  • About me

    Project Engineering Manager | System Integration Manager

  • Education

    • 2006 First faculty of Polytechnic Engineering in Bari

      1999 - 2006
      Master's degree Electronical Engineering; specialisation in telecommunication

      Attività e associazioni:· Member of the Association of Engineers of the province of Bari in the sectors: § Information technology § Industry § Civil engineering Thesis in Electrical Measurements titled: Design and Realisation of transducers for the study of the propagation of seismic waves in non-solid porous materials

    • Politecnico di Bari

      1999 - 2006
      Ingegnere Elettronico ingegneria

      Attività e associazioni:· Inscritto all’ordine degli ingegneri della provincia di Bari settori: § Informazione § Industriale § Civile ambientale

  • Experience

    • Alstom Transport

      Jan 2006 - Jan 2010
      System manager

      Esperienza di Work Package managementField support per test and Commitioning ed installation:§ Supporto tra ingegneria di progettazione e di installazione nella realizzazione della tratta ad alta velocità Bologna – Firenze, Bologna – Milano e Bivi Cintura Bologna. Hardware Configurator : § progettista di sistemi audio frequenza per le tratte ad alta velocità Bologna – Firenze e Bologna – Milano§ progettista di sistemi di segnalamento per la gestione di piazzali e linee ferroviariSoftware configurator : § configuratore di sw applicativo per la gestione della logica computerizzata di sistema;§ impegnato nello sviluppo software di tool proprietarioTest configurator : § gestione di test site per lo sviluppo Hw, messa in servizio e debugging, sviluppo di protocolli TCP, UDP, HDLC per reti proprietarioProgettista sistemi di canalizzazione e cavi per impianti ferroviari ad alta velocità sulla tratta Bologna - Firenze Meno dettagli

    • ECN project SRL

      Jan 2008 - Jan 2011
      Progettista

      § Progettazione impianti fotovoltaici in conferenza unica con potenze superiori a 1MWp§ Progettazione impianti fotovoltaici con potenze inferiori a 1MWp· Esperto in due diligence.· Esperto in presentazioni TICA, AU, SCIA, DIL· Direzione lavori§ Progettazione impianti antintrusione § Progettazione impianti tecnologici.

    • Gruppo Cavazza Engineering Bologna

      Jan 2008 - Jan 2008
      Rapporto di collaborazione

      § Progettazione impianto fotovoltaico 300kWp Monteveglio (Bo)§ Progettazione impianto illuminazione Mensa Bentivoglio (Bo)

    • Alstom

      Jan 2011 - now

      Project System Integrator Manager for The Delhi – Meerut RRTS in India.The Delhi – Meerut RRTS line is the first in India to adopt the European Train Control System (ETCS) Level 2 signalling system which is the core signalling and train control component of the European Rail Traffic Management System (ERTMS) of standards. Main Technologies involved:• Traffic Management System;• European Train Management System Trackside & Onboard; • Interlocking (IXL), which include Axle Counters and Track devices (Point Machines, Signals, APB, ESP)• Automatic Train Operation Trackside & Onboard. European Technical Specification for Interoperability of ATO is currently in preparation for official publication with the ERTMS Technical Specification for Interoperability;• LTE Long-Term Evolution.Analyse Customer requirements to define system performance and compliance, as well as assigning each requirement to a subsystem / technology;Verify project’s documents with internal stakeholder, supplier and subcontractor to guarantee a correct integration;Coordinator of project activities and disciplines managers to guarantee the correct design integration among subsystem;Coordinator of planning activities to optimize the baselines delivery and Coordinator of actions to support the resolution of possible technical problems. Management of design solution, customization and parameterization being responsible for the acceptance by the customer of the design solution and QCDP (Quality, Cost, Delivery and Performance). Meno dettagli Verification, Integration and Testing Manager for Interloking System for the Fjernbane East Project in Denmark.The Fjernbane East project has the scope of replacing all infrastructure signalling systems on the Eastern regions of Denmark (800 km of rail lines).The signalling systems comprise of all signalling equipment including train detection, point machines, line side signals, interlockings, train control and traffic management.The Fjernbane project is also responsible for all adaptations to existing Banedanmark systems caused by the new Fjernbane signalling system. The signalling system will be based on ERTMS level 2, baseline 3.Coordinator of team to verification located in Bangalore (India).Responsible of strategy for the integration HW-SW of the equipment of Interloking system and able to define test environments.Excellent writing skills of Functional Test Description, Functional Test Description, Functional Test Plan, Functional Test Report, Verification Report.Management of test site, clone, laboratories .Ability to be hands on and capable of performing the testing in addition to leading the team. Meno dettagli

      • Project Engineering Manager

        Jan 2021 - now
      • V&V Manager

        Jan 2014 - Jan 2022
      • V&V Manager

        Jan 2012 - Jan 2014
      • VI&T Engineer

        Jan 2011 - Jan 2012
  • Licenses & Certifications

    • Electrical Safety EN 50 110/ L-AUS

      EKU ApS E-Learning Kompetence Udvikling