Abhijit Dey

Abhijit Dey

DESIGN ENGINEER

Followers of Abhijit Dey156 followers
location of Abhijit DeyGurgaon, Haryana, India

Connect with Abhijit Dey to Send Message

Connect

Connect with Abhijit Dey to Send Message

Connect
  • Timeline

  • Skills

    Commissioning
    Engineering design
    Petrochemical
    Design engineering
    Petroleum
    Calculations
    P&id
    Project control
    Autocad
    Piping
    Project engineering
    Asme
    Engineering
    Epc
    Certified lead auditor
    Safety management systems
  • About me

    I see myself as the learning group member who can understand the importance of hard work towards the growth of the company.I believe that my addition to the company and dedication towards work will bring an aura towards the growth of the company..........

  • Education

    • BENGALI SCHOOL, DIBRUGARH,ASSAM

      1989 - 2002
      10th & 12th Physics, Chemistry, Maths, English First div.
    • Maharshi Dayanand University

      2003 - 2007
      B.E MECHANICAL ENGINEERING
  • Experience

    • SVL,Faridabad

      Dec 2007 - Apr 2009
      DESIGN ENGINEER
    • Global Economic Advantage

      Jul 2009 - Aug 2010
      Piping Engineer

      - Plant Piping Drafting & Detailing of IBR, Non IBR and Utility piping as per the Process flow- Plant piping and other instrument detailing as per P & ID diagram- Orientation of equipment's as per the design & safety as well as operational approach- Material take off (MTO) list

    • MECON Limited, India

      Jan 2011 - Jul 2013
      Project Engineer as PMC

      Projects Description: 1 Dadri–Bawana–Nangal is an 867km-long onshore pipeline project operated by GAIL (India). This gas pipeline, with a maximum diameter of 36 inches, starts at Uttar Pradesh (India) and ends in Punjab (India). The Dadri–Bawana–Nangal project started operations in 2013 and is owned by GAIL (India) 2. 24" dia Steel pipeline of capacity 16 MMSCMD from Kochi, Kerala to Bangalore via Palakkad. The major segments include the 450 km pipeline stretch between Kochi and Mangalore via Kerala & Karnataka and a 439 km pipeline segment between Koottanad and Bangalore. The total lengh ofthe pipeline 1060 KMJob Description- Factory/ Workshop/Plant inspection & expediting for fabrication & manufacturing of Line pipe at Pipe Mill across India for LSAW & HSAW pipes- Line pipe coating inspection & expediting at Pipe Mills across India- Coordination for Preparation/Review and approval of SOPs, welding procedure as per design specification/applicable codes by the design consultant, process owners. - Witness, approve/rejection of onsite testing's eg. PQR, EQT & WQT as per the Specification/method statement- Stakeholders Management and coordination for availability of applicable permissions- Inspection of necessary requirements of Equipment's safety clearance, tools and machines periodic safety- Ensuring the work to be carried out as per the obtained permission & methodology directed by concerned authority.- Witness of various destructive & non destructive and other testing's applicable as per the design and safety codes Show less

    • Worley

      Sept 2013 - Jul 2014
      Mechanical Engineer-QUALITY

      Project Description: Laying of 18" Dia Petroleum Product Pipeline with 7.98 MMTPA design capacity with associated facilities from Rewari, Haryana to Kanpur, UP. Total laying length of the pipeline approx.. 900KM with Dispatch Station at Rewari. 11 Nos. SV & IP Station along with Receiving station at Kanpur. Storage & Marketing Terminal at Kanpur & Pumping station at Bahadurgarh. Also Tankage facilities at Bharatpur (RJ), Mathura (UP) Job Description- Establishment of method statement, project quality plans, inspection test plan, and quality management system in coordination with Process Owner & Engineering consultant- Preparing welding procedure as per design specification/applicable code - Coordinating with various stakeholders.- Ensuring safety requirements of Equipment's, tools and machines.- Necessary permissions required from authority.- Site witness of PQR, EQT & WQT as per the Specification/method statement- Ensuring the completion of fulfilment all necessary destructive, non destructive & other testing's- Coordinating and follow up for work completion to ensure that all the requirement of safety regulations of OISD & PNGRB have been complied. Show less

    • Reliance Gas Transportation and Infrastructure Ltd.

      Sept 2014 - May 2015
      Assistant Manager in Sanmarg Projects

      Project Description: SHPPL system is a 16” diameter x 304 km main pipeline, comprising of Compressor Station (CS) at Shahdol where gas is received from RIL operated Gas Gathering Station (GGS) of RIL, 12 mainline block valves (MLVs), one Intermediate Pigging Station (IPS) at Rewa, Metering and Regulating (M&R) station at Phulpur, provision of tap-off stations along the pipeline for supply to future customers, cathodic protection system, emergency shutdown system, flow measurement and control instrumentation, fire and gas detection system, fire protection system, control room, auxiliary buildings and associated facilitiesJob Description- End to end monitoring of work as per the master plan & micro planning,- Supply chain management & expediting of material as per the Procurement plan- Develop and Review of project related key documents in coordination with Process owner (Method statement, Testing plans, Risk register, Quality & Safety related documents, Inspection checklist etc.)- Inspection of Mechanical works, reconciliation of materials, raw material inspection- Management representative for regular coordination with site team and HO for monthly audit reporting of on site execution and quality-safety compliances and half yearly external audit compliance & close-out. Show less

    • Vexil Business Process Services Pvt. Ltd.

      May 2015 - Apr 2017
      Auditor

      - Auditing in Oil & Gas/Airports/Automobile sector as a team member for Certification and surveillance audit for Quality, Health & Environment safety & (ISO/IMS Standards)- Deliver Trainings on Safety & Emergency Response & Disaster Management Plan to Delhi Metro Construction site Teams as per the DMRC policy & guideline. - Customer Survey & Market Research for Business Development

    • VCS Quality Services Pvt. Ltd. - India

      Sept 2017 - Apr 2018
      Inspection Engineer

      Project Description: The Reliance DNEPL project comprises - 12” dia (NB) x 440 km mainline from Dhahej (GJ) to Nagothane (MH), 1 Pump Station (PS) at Dhahej, 33 Mainline Valve Stations (MLV), 2 Intermediate Pigging Stations (IPS) and 1 Metering and Regulating (M&R) station at Nagothane, Cathodic protection system, Supervisory Control and Data Acquisition (SCADA) system. The product of the project is to transmission of Ethane as well as the multiproduct in the bi-directional flowJob Description- Abhijit has hands on experience in onsite construction Planning, monitoring & supervision of works for oil gas transportation projects of Public and Private sector spanning from review of works carried out by the Contractor/vendor/ subcontractor, review of project timeline, inspection of works ensuring quality & safety compliance- Client & other stakeholder interface management Show less

    • PwC India

      Apr 2018 - now
      Assistant Manager

      Selected work experience/Relevant experience and responsibility undertaken- Process Review: The scope of the internal process review involves covering of the scope of the EPC project cycle and detailed assessment of Risk & subsequent control involves in the project management processes and construction management areas such as project planning & budgeting, project progress monitoring, procurement process review, inventory process, billing & invoicing, compliance & approvals, quality & safety for multiple projects across India. The total reviewed project value approx. INR 13500 Cr.- Steel Plant PMO: The scope of the project involves end to end support to the client in the Procurement & Contract management; material procurement schedules, Preparation of draft RFQ/Contract agreement/PO as and when required, planning & monitoring supply chain of procured material. Also, expediting for the supply items, coordination & communication to various level of stakeholders for pre & post ordering necessary clearance within site team, consultant, other stakeholders & management in their Procurement process.- Capex Review: The Client is a reputed Oil & Gas Exploration company where the scope of the assignment was the Capex review of the billing process to review all the supportive documents submitted by the vendor/contractor along with RA bills and to ensure the fulfillment of necessary compliances against the contractual requirements.- Development of Standard Operating Procedure (SOP) for Project Management Processes: The Scope involves the development of Standard Operating Procedure (SOP) for the construction end to end Project Management process, Design Process, Procurement Process and Execution Process- Risk Assessment Review: The scope of the engagement is to identify the inherent qualitative risk involved in the process in the Real-estate & Infrastructure projects including the assessment of the identified risks and impact analysis basis of Risk control matrix Show less

  • Licenses & Certifications

    • Internal Auditor in IMS

      SGS
      Mar 2016
    • Piping Design and drafting

      SmartBrains Engineers & Technology Pvt Ltd
      Apr 2009
    • ASNT Level-II in Radiography and Ultrasonic testings

      NDT CONSULTANCY SERVICES LTD
      Apr 2015