Dimas Antonio Bueno Medina

Dimas Antonio Bueno Medina

Production Line Supervisor

Followers of Dimas Antonio Bueno Medina786 followers
location of Dimas Antonio Bueno MedinaFalcon State, Venezuela

Connect with Dimas Antonio Bueno Medina to Send Message

Connect

Connect with Dimas Antonio Bueno Medina to Send Message

Connect
  • Timeline

  • About me

    Project & Construction

  • Education

    • Universidad Santa María

      1997 - 1999
      Specialist Engineering and Maintenance
    • Universidad Nacional Experimental "Francisco de Miranda"

      1987 - 1992
      Engineer Industrial
    • Instituto Universitario de Tecnología "Alonso Gamero"

      1980 - 1983
      Technician Instrumentation
  • Experience

    • Montecatini C.A.

      Feb 1985 - Sept 1986
      Production Line Supervisor
    • Fanacassette C.A.

      Sept 1986 - Jul 1989
      Chief Supervisor

      Responsible for developing master production plan of audio and videotape assembly for domestic and international markets, control and monitoring of raw material reception and finished product. Control and monitoring of labour and materials, develop and update operating procedures and repair equipment for audio and videotape assembly

    • PDVSA - Centro de Refinación Paraguaná

      Jan 1989 - Jan 2003
      Mechanical Supervisor

      Responsible for planning, scheduling and controlling engineering, procurement and construction phases in minor maintenance projects (non-recurring preventive maintenance), Preparation of technical specifications for bidding packages (Electrical, instrumentation civil and mechanical). Preparation of master maintenance projects Schedule for the Refining Complex, established between Operations and Maintenance groups depending on budget allocated for the different production units, supervision of maintenance projects contracts.Responsible for controlling and monitoring routine maintenance activities of preventive / corrective, static and rotating equipment, preparation of work schedule in conjunction with Planning and Operations, according the priorities, costs and time to optimize the available resources and ensuring the continuous operation of the facilities. Controlling and monitoring activities for plant shutdowns at the complex. Ensure that all activities, materials and equipment to comply with all safety procedures and Environment Laws to prevent occurrence of accidents and / or damage to environment and facilities. Controlling administrative indicators (overtime, training, compensatory days), safety and maintenance KPI´s). Work assignments during term of employment include:- Maintenance Planner.- Routine Maintenance Coordinator – Mild Conversion Units, Amuay Refinery.- Turnaround Mechanical Supervisor.- Logistic Operations Supervisor.- Static Equipment Supervisor.- Maintenance Planner - Distillation Units, Amuay Refinery.- Instrumentation Technician. Show less

    • Foster Wheeler / Tecnoconsult / Sin Crudos de Oriente (SINCOR) - A TOTAL affiliate

      Sept 2004 - Nov 2004
      Senior Mechanical Supervisor - Catalyst Engineer

      Responsible for coordinating and supervising the activities of catalyst replacement in reactors R-1001 / R-1003, NDHT unit and reactors R-3001, R-3002 / R-4001, R-4002 MHC unit, as well as the maintenance activities for furnace F-1001 NHDT unit. Review of work packages (Job method statement) prepared for each of the equipment involved in the turnaround. Controlling and monitoring of maintenance activities performed by the contractor. Quality assurance of all work performed, according to turnaround standards required by client. Reported activities to Shutdown Superintendent. Show less

    • Operadora Cerro Negro (OCN) - An ExxonMobil affiliate / PROSOL ETT

      Jun 2005 - Mar 2006
      Turnaround Supervisor

      Responsible for coordinating and supervising the activities of major maintenance for heat exchangers in CGP / DRU Units, preparation of work packages and bill of materials and tools required for the maintenance of exchangers involved in plant turnaround, supporting OCN heat exchanger Planner in the estimation of activity resource and activity duration to develop heat exchanger schedule. Controlling and monitoring maintenance activities performed by the contractor. Quality assurance of all work performed, according to standards required by client, Reported activities to Shutdown Superintendent. Show less

    • Central Azucarero Carora (CA AZUCA) - A PMC Group affiliate

      Jan 2006 - Jan 2008
      Planning Coordinator

      Responsible for planning and coordinate maintenance and operational activities during the period of milling and production. Responsible for consolidating scope of works, procurement, planning, scheduling and cost controlling activities for instrumentation, electrical and mechanical disciplines for the major Shutdown, control and follow up for all maintenance and investment projects, according to guidelines of Agro industrial Management, Operations Management and Technical Services Coordination.

    • Tecnicas Reunidas

      Jun 2008 - Sept 2009
      Piping and Instrumentation Supervisor

      Responsible for planning and supervising the construction and precommissioning activities for different disciplines (Civil, electrical, instrumentation and mechanical) in order to optimize the resources according assigned schedule. Supervising activities to comply with the construction and safety standards required by client (Saudi Aramco). Responsible to obtain mechanical completion certificate (MCC) required for project acceptance in Thermal Oxidizer Unit, coordinate and execute the instrumentation activities in four plants, hydrostatic test coordination, preparation and execution activities according with plant priorities and complying with Saudi Aramco standards and safety regulations. Work assignments during term of employment include: Hydrotest Coordinator, TRG MCC Task Force Champion - Thermal Oxidizer Unit, Instrumentation Supervisor and Tie - Ins Supervisor. Show less

    • Central Azucarero Carora (CA AZUCA) - A PMC Group affiliate

      Jul 2010 - Mar 2012
      Planning & Maintenance Advisor

      Lead engineer for installation of a 400 psig and 350 ªC steam boiler, verifying detailed engineering for piping, instrumentation and electrical, developing the scope of work and preparing technical specifications for different bidding packages (Electrical, instrumentation, mechanical and civil), planning and coordination the execution activities for different disciplines Responsible for planning scheduling the 2.010 & 2.011 plant turnaround, based in reliability inspections in rotating and static equipment involved in refining process as well as activities for instrumentation, mechanical and electrical disciplines, lead workshop activities during the downtime maintenance coordinating the multidisciplinary activities in different workshops (Electrical, instrumentation and mechanical) according to priorities designed by turnaround Coordinator, follows up activities in external workshops, report status of work to turnaround Coordinator and Operations Manager. Advice cost estimates for budgets. Prepare bidding packages for plant turnaround contracts and projects. Responsible for training personnel in cost estimation and MS Project software (Basic level). Show less

    • VEPICA

      Mar 2012 - May 2013
      Progress Controller

      PROJECT: “BASIC ENGINEERING FOR PRODUCTION SURFACE FACILITIES, PETROJUNIN – JUNIN BLOCK 5 - Faja Petrolífera del Orinoco” Client: SNC Lavalin. Responsible for controlling and monitoring the physical progress - financial planning for engineering deliverables generated for Electrical, Instrumentation, Telecommunications, Piping, Mechanical, Process and Civil; responsible for consolidating information reflected in management reports requested by the client such as: Progress Report, Cost Summary Report, Man Hour Report, interaction with leaders of both disciplines as project coordinators and customer business unit; responsible of Document Control for this projectPROJECT: “CONSTRUCTION OF AGROINDUSTRIAL COMPLEXES FOR SUGAR DERIVATIVES – PHASESI & II” Client: PDVSA Agrícola. Responsible for the control and follow up of physical progress of project for Ethanol and Sugar refinery complexes in phases I and II, belonging to the project portfolio of PDVSA Agricola, consolidating information through interaction with the Management of Engineering, Procurement and implementation to reporting physical progress - each complex financial, corporate development of the report submitted to the Control and Management Division of PDVSA Agricola. Participation in meetings with Superintendents and Leaders for each complex to review work plans according to the development of each project phase. Show less

    • YPergas

      May 2013 - Dec 2013
      Project Planner

      PROJECT: “YUCAL PLACER - PHASE 300” - Responsible for monitoring Piping, Mechanical, Electrical & instrumentation in the phases of engineering, procurement and construction of four Wellpads and new CPF Unit, interacting with the respective managements to review activities of work programs for decision-making, and respective shares in order to minimize deviations that occurred during the development of planning, interacting with representative of Engineering and Procurement to establish delivery of materials, drawings and documents that allow normal development of construction activities; responsible for reporting/update physical progress in Project Master Plan. Interaction with contract Management for reviewing different items for project contracts (increase and / or decrease in work). Show less

    • Morelco S.A.

      Jan 2014 - Nov 2015
      Planning Coordinator

      PROJECT: “ESMERALDA REFINERY REHABILITATION - PHASE II, Esmeraldas, Ecuador” Preparation and review the plan of the different disciplines for the creation of the master plan for the CDU-1 Units; CDU-2; Boiler YB-7005; YB-7004; Cooling Water and Fuel Oil, preparing manpower and equipment mobilization for all disciplines for Pre Shutdown, Shutdown, control and follow up for the activities of pre-shutdown executed for the different disciplines (Piping, Mechanical, Electrical and Instrumentation using the “Last Planner” Methodology. Responsible to update the main KPI’s of the company, quantity take-off and project progress reports (Physical and financial). Show less

    • Technical Diagnostic Services

      Aug 2017 - Jun 2019
      Planner

      PROJECT: “COBRE PANAMA, Donoso, Panamá”. Client: First Quantum Mineral.Working for Inspection, Reparation and Preservation Department, in charge of generating Work Orders for IR&P activities in Mine Site according to the frequency of preservation established; creator and administrator of the preservation information system to facilitate the generation of different reports for IRP Department in Mine Site, responsible for master plan updating for IR&P, responsible to submit the Daily and Weekly Reports to the IR&P Superintendent and Technical Services Manager. Show less