Johnson Ogundipe

Johnson Ogundipe

Mechanical Project Lead

Followers of Johnson Ogundipe209 followers
location of Johnson OgundipeNigeria

Connect with Johnson Ogundipe to Send Message

Connect

Connect with Johnson Ogundipe to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Pioneer Procurement Synergy Limited

  • Education

    • Lagos State Model College, Kankon

      1994 - 2001
      WAEC Sciences Distinctions

      Activities and Societies: Agricultural Prefect, Social Well fare and Cultural group team

    • University of Maiduguri

      2005 - 2010
      Bachelor of Engineering - BE Mechanical Engineering Second class upper
  • Experience

    • Forlyon Technologies and Integrated Services

      Feb 2012 - Sept 2014
      Mechanical Project Lead

      Project Title: Design, Installation and Commissioning of Detection and Alarm, Firefighting system and a supply pump (DED, Installation and Procurement) 2013- 2014 Client: Federal University of Technology, Minna Location: Information Technology Department, Federal University of Technology, Minna Role: Project EngineerScope of Work: Detail Engineering design and commissioning of a Detection and alarm fire system (extra low voltage) using fire retardant cables and installation Firefighting System with a 3-way Fire Pump of 1000g/l with a jockey boaster pump to combat any incidence of fire. Project Title: Design and Installation of a Fire Detection and Alarm System (DED, Installation and Procurement) 2013 Client: Total Nigeria Location: Jabi Service Apartment, Abuja Role: Project EngineerScope of Work: Detail Engineering design, and Installation and commissioning of a smoke detection fire alarm system with MCP, break glass, strobe light, and siren for prompt responses and recovery.Project Title: Design and Installation of a Firefighting System (DED, Installation and Procurement) 2013 Client: House on the Rock Location: Apo, Abuja Role: Project EngineerScope of Work: Detail Engineering design, and Installation and commissioning Wet Riser firefighting System actuated by fire sprinkler heads with a discharge pressure of 7psi as per NFPA. Project Title: Design, Installation and Commissioning of Fire Hydrant System (DED, Installation and Procurement) 2012 - 2013 Client: Petroleum Trust Fund Location: School of Petro-chemical studies, Kaduna State Nigeria Role: Project EngineerScope of Work: Complete: Detail Engineering design, Installation and commissioning of Fire Hydrant System using HDPE pipes, supplied by a 3-way Fire Pump of 25,000g/l with a jockey boaster pump Show less

    • TOMSEY ENGINEERING AND SERVICES INTERNATIONAL LIMITED

      Oct 2014 - Nov 2017
      Deputy Project Manager

      Project Title Installation of Fiber Reinforced Calcium Sulphate Raise floor Fire Retardant Panels for Fuel Plant I Computer Room and Fuel Plant II control room entrance (Installation and Procurement) 2017 - onging Client: Port Harcourt Refining Company Limited Location: Alesa-Eleme, River State Nigeria Role: Senior Project EngineerScope of Work: Installation of Fiber Reinforced Calcium Sulphate Raise floor Fire Retardant Panels for Fuel Plant I Computer Room and Fuel Plant II control room entrance, Replacement of the defecting metal standing legs, Housekeeping, Commissioning and Handover (Installation and Procurement)Project Title: Complete Rehabilitation of RMS Floating Roof Tank 52TK57J storage tank (Engineering, DED, Fabrication, Procurement, Commissioning) 2015 -2016 Client: Port Harcourt Refining Company Limited Location: Alesa-Eleme, River State Nigeria Role: Senior Project EngineerScope of Work: Rehabilitation of collapse floating roof PMS storage Tank 52TK57J with a storage capacity of 25,000 Hecto liters Hydro-test roof drain line to a minimum pressure of 10barg Replace defective 2” and 3 ½” sleeve landing legs to a grade BS 4360 2” and 3 ½”respectively. Replacement the kink neoprene seal to a liquid seal PSS20-SS/VS100 Sandblasting of the external shell to Swedish Standard SA 2.5mm minimum  Primer painting all associated areas blasted with high build berger paint to a thickness film of 220microns (50+50+120)Project Title: Area 3 Process Platform Upgrade process platform 16-AM-03 A/C/E/G/I/K/M/O (Engineering, Fabrication and Procurement) 2015 - 2016 Client: Port Harcourt Refining Company Limited Location: Alesa-Eleme, River State Nigeria Role: Senior Project EngineerScope of Work: Complete replacement and upgrade of process platform from checker plate to carbon steel grating on the entire Unit 3 process platform 16-AM-03 A/C/E/G/I/K/M/O Main Platform Show less

    • ACTEON PROJECT SERVICES

      Nov 2017 - now
      Project Specialist

      Planning and Defining ScopeActivity Planning and SequencingResource PlanningDeveloping SchedulesTime EstimatingCost EstimatingDeveloping a BudgetDocumentationCreating Charts and SchedulesRisk AnalysisManaging Risks and IssuesMonitoring and Reporting ProgressTeam LeadershipStrategic InfluencingBusiness PartneringWorking with VendorsScalability, Interoperability and Portability AnalysisControlling QualityBenefits RealisationPlanning Project ResourcesAssembling and Leading Project TeamTime management Budgeting Quality and SatisfactionManage Issues and RiskMonitoring ProgressReporting and Documentation Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Dec 2024
      View certificate certificate