Ali Temoor

Ali Temoor

Instrument Technician

Followers of Ali Temoor869 followers
location of Ali TemoorSargodha District, Punjab, Pakistan

Connect with Ali Temoor to Send Message

Connect

Connect with Ali Temoor to Send Message

Connect
  • Timeline

  • About me

    An Instrument and Automation specialist. Having 12 experience in field instrumentation, PLC, DCS and SCADA systems.

  • Education

    • Government college of technology sargodha

      2009 - 2012
      Associate's degree Instrumentation Technology B

      Activities and Societies: Football, cricket, bedminton Diploma of associate engineering in instrumentation technology from well reputed Government college in pakistan

    • Government high school Jalalpur Bhattian

      2007 - 2009
      Matriculation Science B

      Activities and Societies: Footbal, cricket, bedminton Matriculation equivalent to O-Levels

  • Experience

    • National engineering and trading compony

      Jan 2012 - Jan 2014
      Instrument Technician

      Project of Tariq Float Glass industry Sheikhupura 5MW.Project of Ghani gas Multan Road Lahore 2 MW.Operation & maintenance of Caterpillar engines (3512, 3516A&B).Involved in erection & commissioning of power house.

    • Orient Energy Systems Pvt. Ltd.

      Jan 2014 - Jun 2015
      Control Room Operator

      Different projects of power generation plants. Nestle pakistan 2 MWPepsi pakistan 8 MWInterloop pakistan 2 MWSundar industrial estate 10 MWWorked in operation and maintanance.

    • MOL Pakistan Oil & Gas Co. B.V.

      Jul 2015 - Aug 2015
      E&I Technician

      Installation and termination of Field Instrumentation and Control System and field Equipment’s in field and Lab Performing planned predictive maintenance activities during erection.

    • Attock Refinery Limited

      Aug 2015 - Jun 2016
      Instrument Technician

      Involved in Plant Shutdown and Start up.Familiar with Erection, Commissioning of 21 MW power plant.Boiler total75 ton/hour And refinery up gradation project.Calibration of flow, temp and pressure transmitters.Loop testing from field side to ensure proper functioning of field instruments & to assist Management in making of documentation. job plans related to plant modification and critical jobs.Handled Punch Lists and defects.Involved in leak test.

    • Ibrahim Fibres Ltd.

      Jun 2016 - Dec 2017
      Instrument Technician

      Operation & maintenance of polymer plants capacity of 1200ton/day, boilers 10&14 ton/hour, water treatment plants, chillers and compressor.Also involved in erection of coal fired power plant with capacity of 21 MW and boiler with capacity of 80 ton/hour. Involved in loop testing, installation and commissioning.

    • Sitara Chemical Industries Limited

      Jan 2018 - May 2019
      Sr Instrument specialist

      Operation & maintenance of coal fired power plant with capacity of 40 MW CFB boiler with capacity of 150t/hr and water treatment plant. Responsible for maintenance and Calibration of all transmitter and mov. Involved in erection, commissioning and maintenance of brick’s making plant with coal Ash.

    • Engro Powergen Thar Limited

      May 2019 - Jun 2022
      TEAM LEADER I&C

      Worked as Department leader to supervise all I&C Pakistani staff at power plant with capacity of 2x330MW CFB Boiler of GE with capacity of 2x1105 t/hour and turbine of DONGFANG with capacity of 2x330MW.To make PM and CM job plans. Responsible for all the DCS (GE Nexus Optimum C v2.6.2), (Siemens PCS7v9.1) & PLC modifications & Maintenance jobs.Maintaining accurate records, logs, and documentation of system changes and maintenance activities.Supervise regular and Emergency field jobs related to I&C. Responsible for Maintenance and calibration of all types of instruments (transmitter, control valves, MoV, switches, SWAS, CEMS & Coal online analyzers) of power plant. Also involved in commissioning of power plant. Show less

    • Nimir industrial chemicals ltd

      Jul 2022 - Sept 2022
      Sr. Site Engineer I&C

      Involved in Erection and commissioning 21MW Thermal power plant.

    • The Hub Power Company Limited (HUBCO)

      Oct 2022 - Feb 2023
      I&C supervisor

      Involved in commissioning of coal fired power plant with capacity of 330MW.Involved in commissioning of Coal handling system, CFB boiler, Turbine & Utility area.Supervise the DCS (GE Nexus Optimum C v2.6.3) & PLC (S7-200,400) testing.Involved in loop testing.Supervise the calibration of Transmitters, Control valves, MoV & Analyzers (Turbidity, SWAS, CEMS & Coal online analyzers).CFB boiler OF GE 1105t/hr & Turbine of GE.

    • Maple Leaf Cement Factory Limited

      Feb 2023 - now
      Asst Engineer Instrument & Automation

      Ensure that all work is executed to appropriate standards (Implementation, Test & Documentation)Lead a team during Up gradation of DCS from Siemens PCS7 V8.2 APL to CEMAT Library.Install a new SCADA system of Siemens s7-1200 and Wincc 8.0 for energy monitoring system. Implement PRDS project in DCS to utilize excess steam at WHRP.Implement ESP project in DCS so operator can use it in dual sequence mode. Provide direct in-plant engineering support operational requirements for the SIEMENS PCS7 DCS & Involved in day to day maintenance activities of running Power Plant and shutdown planning.Implementation of Modifications in DCS & Local PLC’s as per Operational requirement. Responsible for Maintenance of PLC (S7-200,300,400) & DCS(PCS7v8.2) System.Calibrating and maintaining sensors, instruments, and other hardware.Planning and executing system upgrades and modifications as needed.Maintaining accurate records, logs, and documentation of system changes and maintenance activities.Supervise regular and Emergency field jobs related to I&C. Show less

  • Licenses & Certifications

    • National Driving Permit

      National Highway Authority
      Feb 2025
  • Honors & Awards

    • Awarded to Ali Temoor
      Appreciation Letter China huadian power plant operations company May 2020 Appreciation for completion of Major shutdown with safety and proper work.