Glenn Shealey

Glenn Shealey

Petty Officer 2nd Class, Electronics Technician

Followers of Glenn Shealey129 followers
location of Glenn ShealeySavannah, Georgia, United States

Connect with Glenn Shealey to Send Message

Connect

Connect with Glenn Shealey to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Hargrove Engineers + Constructors

  • Education

    • College of Business, Saint Leo University

      2003 - 2005
      Bachelor Business Administration
    • Capitol Radio Engineering Institute

      1974 - 1981
      Associate Degree Electronics Engineering
  • Experience

    • U. S. Navy

      Jan 1974 - Jan 1979
      Petty Officer 2nd Class, Electronics Technician
    • UNION CAMP CORPORATION

      Jan 1981 - Jan 1990
      MAINTENANCE SUPERVISOR

      Worked with a team of internal management and external engineers to construct a new manufacturing facility and process equipment consisting of 14 blown-film extrusion lines and 12 retail packaging bag lines with 4-color flexo-graphic printing presses, embossing and side-gusseting units, and one eight-color central impression flexo-graphic roll-to-roll printing press.Developed custom inventory control system using HP Condor Dbase and later migrated the program to Dbase III and IV.

    • GNB, INC

      Jan 1990 - Jan 1991
      MAINTENANCE SUPERINTENDENT

      Supervised and trained 20 maintenance technicians and 4 waste-water treatment operators located in two manufacturing plants and the regional distribution center.Removed two production lines and built a new line due to company reorganization.Evaluated plant conversion equipment for ease of maintenance, durability, vendor support level, and maintenance and operation manual accuracy. Maintained the facility's environmental and safety systems and procedures.Used Mainsaver CMMS to track inventory and equipment maintenance work plans. Show less

    • INTERFACE FLOORING SYSTEMS, INC

      Jan 1991 - Jan 1996
      CORPORATE PLANT ENGINEER

      Supervised 26 maintenance technicians in five buildings located in two cities. Developed a reporting system that resulted in major utility cost reductions in all utility systems for two Georgia locations. This system was expanded to all company plants worldwide.Implemented a water conservation program that reduced water consumption by 83%. Reduced natural gas cost by 40% by installing a propane standby system.Established relocation schedule for the Atlanta plant move to Cartersville. U.S. project manager for start-up of Thailand manufacturing plant. Managed purchase and shipment of new equipment and rebuilding of existing equipment transferred from other locations around the world. Worked with the Director of Health and Safety to reduce accidents and improve working conditions in the plants by establishing safety programs and procedures. Show less

    • Alcan Packaging

      May 1996 - Jan 2008
      Facility Engineer / Project Manager

      Development and implementation of NA Tobacco Packaging projects. Projects included safety, environmental, quality, process improvement, building expansions and new facility construction.Company Purchased by AMCOR 2010

    • Jedson Engineering

      Jan 2008 - May 2010
      Construction Manager / Cost Estimator Industrial Projects

      Provided construction management and cost estimates for industrial clients in the Pulp & Paper, food flavoring and roofing product industries. Participated in paper mill maintenance shut downs providing project tracking and safety management functions.

    • Project Resources of Georgia, LLC

      Aug 2010 - Feb 2013
      President

      Provider of project management and cost estimating services for small to mid size industrial and manufacturing companies.July 2012 - Interface Inc. West Point, GA - Development of various project scope alternatives for the expansion of the West Point RCA carpet tufting plant to meet 4 year goal of doubling its capacity. Work included generating AutoCad layouts for process flow alternatives in the existing facility, new plant layouts for future expansions, relocation of existing processes to other locations and conceptual cost estimating to determine future capital budget requirements.Oct 2011 - June 2012 OLIN Niagra Falls, NY - Onsite Construction Manager for the construction of a new bleach chemical plant consisting of a tank farm, chiller building, a seven story structural steel process tower and electrical control room. Project included the installation of approximately 11,000 linear feet of carbon steel, stainless, titanium, fiberglass and HDPE piping. Building structures included drilled caissons supporting poured concrete foundations for the buildings and pipe support racks. Conducted scope review of bid packages, developed project schedule, maintained and tracked progress of work in place against schedule and contractual dates. Managed the coordination of all sub-contractors on site. Show less

    • Hargrove Engineers + Constructors

      Feb 2013 - now
      Project Manager
  • Licenses & Certifications

    • OSHA 10 Hour General Industry Safety & Health

      US Department of Labor
    • OSHA 30 Hour for Construction & Health

      US Department of Labor
    • PMP

      PMI
      Jul 2011