KARTIK JAJORIA

KARTIK JAJORIA

Student Trainee

Followers of KARTIK JAJORIA1000 followers
location of KARTIK JAJORIANew Delhi, Delhi, India

Connect with KARTIK JAJORIA to Send Message

Connect

Connect with KARTIK JAJORIA to Send Message

Connect
  • Timeline

  • About me

    Assistant Project Manager - (Project Controls) at Jacobs Engineering India Pvt.Ltd.

  • Education

    • Chowgule Public School

      -
    • Lovely Professional University

      2008 - 2012
      Bachelor of Technology (BTech) Civil Engineering
    • Symbiosis Centre for Distance Learning

      2021 - 2023
      Post Graduate Diploma in Project Management Project Management A+
  • Experience

    • Larsen & Toubro

      Jul 2011 - Nov 2011
      Student Trainee

      I was a Student Trainee in the firm. The project was Rehabilitation Works for DMRC Pocket (I & II).In this project the client is Parsvnath Estate Developers Pvt. Ltd. The project is to construct a multi-storey parking, offices and shops.

    • Civtech Consultants Pvt. Ltd. Delhi

      Jul 2012 - Sept 2012
      Structural Design Engineer Trainee

      I was appointed as Structural Design Engineer Trainee in the firm. I was involved in designing of slabs and beams. I also learnt the software STAAD.PRO. and started designing a structure.

    • Leighton India Contractors Pvt Ltd

      Sept 2012 - Nov 2016

      Title: The CamelliasClient: DLF Limited, PMC – HILL International Ltd.Period: Jan,15 – Till DateDescription: The Camellias will be one of the largest residential complex in India and occupies a site area of approximately 18 acres. The project having a built-up area of 406,000 sqm, includes construction of 431 apartments and 14 Penthouses.It includes 3 continuous basement levels and 9 tower blocks, ranging between 19 & 38 floors. Over a 49 month programme, involves a mixture of traditional RCC frames, post tensioned slabs & external GRC structures. The extensive landscaping also includes a one acre lake and a 6,000 sq. meters high class clubhouse facility with an auditorium, pool & gymnasium. It also includes 9 towers divided in 3 blocks (A-Block having buildings A1, A2, A3 & A4, B-Block having building B1 and C-Block having buildings C1, C2, C3 & C4).Key Result Areas:• Responsible for monitoring the activities for efficient utilization of resources• Involved in planning all construction activities and completing the same on time• Accountable for working on bar bending schedule of buildings• Formulated the daily progress reports and discussed the same with the management Show less Chenani Nashri Tunnel ProjectA major road tunnel project in Northern India. The project involves construction of approximately 9km of 2-lane (13.3m dia) main tunnel along with parallel escape tunnel (5m dia). Key Result Areas:• Involved in all the Quantification & Construction of Buildings related to Tunnel like Ventilation Building, Technology Building, Toll Plaza, etc. • Planned construction activities to complete them on time and supervised the civil activities for efficient utilization of resources• Responsible for quantity surveying, steel calculation & concrete estimation.• Liaised with the Planning Department and ensured preparation of daily progress reports. Show less Title: Power Generation & Distribution SystemClient: Cairn India Ltd. (CIL) in Barmer, RajasthanDescription: It is an extension of existing Oil & Gas plant and the PMC is Engineers India Ltd. (EIL).Key Result Areas:• Involved in construction of Sub-Station Buildings, STG (Steam Turbine Generator) and CTP (Condensate Treatment Plant)• Planned construction activities to complete them on time and supervised the civil activities for efficient utilization of resources• Served as Coordinator, wherein involved in coordination of punch points, work progress, etc. Show less Title: Angul Integrated Steel Plant ProjectClient: Jindal Steel and Power Ltd. (JSPL), Angul, OdishaKey Result Areas:• Responsible for quantity surveying, steel calculation & concrete estimation of Rolling Mill• Liaised with the Planning Department and ensured preparation of daily progress reports Highlights:• Undertook initiatives to execute projects on time and within budget• Took several measures to ensure that projects are in line with requirements specified by the clients• Recognized for sharing plans & resource management suggestion to enhance or improve the project performance• Bagged Safety (HSE) Certificate for performance Show less

      • Engineer Construction

        Jan 2015 - Nov 2016
      • Engineer Construction

        May 2014 - Dec 2014
      • Engineer Construction

        Mar 2013 - May 2014
      • Graduate Engineering Trainee

        Sept 2012 - Feb 2013
    • AECOM (incorporating Davis Langdon, An AECOM Company)

      Sept 2017 - Jun 2018
      Quantity Surveyor II

      Project Name :- Modernization of Chennai Airport Phase-II, Chennai, Tamil NaduKey Result Areas:• Involved in Cost Justification of the project. • Involved in Pre-Qualification scrutiny of the Bidders.• Responsible for Rate Analysis of all civil items as per AAI requirements.• Day to day liaison & Coordination with all concerned departments, management & client as well.Project Name :- Construction of a New Integrated Terminal Building at Guwahati AirportKey Result Areas:• Responsible for all Quantity Calculations of Civil Works• Involved in Cost Justification of the project. • Involved in preparation of BOQ (Civil).• Involved in preparation of priced BOQ.• Responsible for Rate Analysis of all civil items. • Involved in Technical Sanction submission & DNIT submission as well.• Involved in working of complete cost of project. • Responsible for justification of rates.• Day to day liaison & Coordination with all concerned departments, management & client as well. Show less

    • STUP Consultants P. Ltd

      Jul 2018 - Feb 2019
      Quantity Surveyor

      Project Name : Jhansi Smart CityPreparation of BOQ and Cost Estimation for Renovation of Schools, ICCC Building and Road Drains of 8.25 km & Civil Structure of Rain Water Harvesting for approx.100 buildings.Day to day liaison and coordination with all concerned departments.

    • Jacobs

      Feb 2019 - now

      Global Integrated Delivery Project Control Support to ANZ Region.• Leading the Team of GID Project Controllers for ANZ – D&S Eastern, Southern & New Zealand• Coordinate & work with the Project Managers to give Cost Control support on the projects. • Risk Analysis on Cost, Revenue & Gross Margin with respect to the budget. • Work on the in-house global software IPCS (Integrated Project Control System) & Work on Pricing Tools for costing and upload the same to IPCS.• Forecasting and preparing project cost reports monthly.• Complete record of change/variation notices to the project.• Assisting Project Managers in Project Financial Reporting. Show less

      • Assistant Project Manager - Project Controls

        Jan 2022 - now
      • Deputy Cost Controller (Project Controls)

        Feb 2019 - Dec 2021
  • Licenses & Certifications

    • Primavera from CADD CENTER

      CADD Centre Training Services Pvt Ltd.
    • Billing Engineer - Civil

      BHADANI Quantity Surveyors and Training Pvt. Ltd.
      May 2017
    • Tendering and Procurement Management

      BHADANI Quantity Surveyors and Training Pvt. Ltd.
      Feb 2017
    • Construction Contract Management

      BHADANI Quantity Surveyors and Training Pvt. Ltd.
      Mar 2017
    • Quantity Surveyor - Civil

      BHADANI Quantity Surveyors and Training Pvt. Ltd.
      Apr 2017