Maanan Seduk, PMP®

Maanan Seduk, PMP®

Logistics Project Engineer (Internship)

Followers of Maanan Seduk, PMP®456 followers
location of Maanan Seduk, PMP®Greater Paris Metropolitan Region

Connect with Maanan Seduk, PMP® to Send Message

Connect

Connect with Maanan Seduk, PMP® to Send Message

Connect
  • Timeline

  • About me

    Project Director - Wind Industry

  • Education

    • Institut national des Langues et Civilisations orientales

      2009 - 2013
      Licence (Bachelor) Japanese Language and Literature Succeed

      Japanese Bachelor's degree, Paris

    • IMT Nord Europe

      2002 - 2006
      Ingénieur des Mines de Douai Production avec filière commerciale
  • Experience

    • L'Oréal

      Mar 2006 - Sept 2006
      Logistics Project Engineer (Internship)

      Set a production continuity plan (disaster recovery plan)Set a new shipping label in the scope of traceability projectStudy of the feasibility of a pull-flow system (Kanban)

    • Subsea 7

      Jan 2007 - Jan 2016

      Co-ordinate inputs from support functions on all commercial/technical aspects of the tenderEnsure the tender meets the client requirements and follows Subsea 7’s guidelines and processesCoordination with partnersChallenge internally manhours and time estimateReview costing and contractual qualificationsIssue the Authorisation To Tender document to the top managementIssue the technical & commercial proposal to client (Shell, ENI, PEMEX…)Negotiation with client during clarification meetingTenders:ETAN (Pipelines & Structures, ENI , Nigeria)Sonaref (Pipelines & Buoy System, KBR, Angola)Lakach (Pipelines & Onshore Works, PEMEX, Mexico)Gazelle (Pipeline & Jacket Installation, Vioco, Ivory Coast)Bonga (SPM Offloading Buoy, SHELL, Nigeria)Coral (T&I, ENI, Mozambique)Others:Participant of Subsea 7 High Potential Programme Show less Missions: Estimating of complex offshore oil & gas projects (10.000.000 USD to 2.500.000.000 USD)Tenders:Kaombo (SURF, TOTAL, Angola)Kizomba Satellites Phase 2 (SURF, EXXON, Angola)Congo River Crossing (Pipeline Installation, CHEVRON, Angola)South N’Dola Greenfield (Deck Fabrication & Hook-Up, CHEVRON, Angola)Lianzi Topsides (Module Installation & Hook-Up, CHEVRON, Angola)Vega Pleaide (Jacket & Pipeline Installation, TOTAL, Argentina)Girri FPSO #2 (Module Installation & Hook-Up, TOTAL, Angola)Dalia Piles (Pile Installation & Refurbishment, TOTAL, Angola)Leviathan – Export, Flowline & Ancillary (SURF, NOBLE ENERGY, Israel)Kaombo FPSO Mooring (FPSO Mooring Line Installation, MODEC, Angola) Show less Support the project for the offshore operations on Polar Queen and Polaris vessel (Frade, Perdido, Gjoa, Norne, Angola LNG, Block 15, Pazflor; CLIENT: Total, Chevron, Statoil, Exxon, Shell)Clarification then endorsement of the barge scope of work in term of operational feasibility (including safety aspects)Ensuring that the logistics organized "around the ship" is adequate and planned with the most efficient wayEnsuring that equipment/assets to be used by the ship are fit for purpose with the adequate level of preparationDevelop & prepare the Standard Operations ProcedurePreparation of the mobilization plan, following on site to ensure that the equipments (internal & subcontractor equipments), the installation aids & the project consumables are onboard.Issuance of Operation reports complying with the Operations standardsOrganization of debriefing meetings on specific topics (lesson learnt) Show less

      • Commercial Lead / Proposal Lead - Tendering

        Feb 2014 - Jan 2016
      • Senior Estimating Engineer

        Feb 2011 - Feb 2014
      • Offshore Field Engineer

        Apr 2008 - Feb 2011
      • Planning Engineer

        Jan 2007 - Apr 2008
    • Nordex France & Mediterranean region

      Jan 2016 - now

      • Work closely with the local Sales organisation as well as relevant functions within the Project Management and other departments throughout the stages of offering and contract negotiation with a focus on project execution topics such as scheduling, logistic studies, cost calculation, contractual interfaces etc• Risk review and active transfer of risk mitigation measures to the customer contract negotiations • Cost calculation for project execution related topics such as WTG installation, crane works, logistics and coordination of costs calculation for windpark infrastructure such as roads, foundations and electrical infrastructure• Conducting site surveys to check conditions of accessibility• Planning and preparation of projects • Tendering and contract negotiation of infrastructure services for Turnkey Projects• Representing the Nordex organization to our clients• Participation in customer contract negotiation• Liaise with other Nordex departments like Engineering, Purchasing, Service and Legal during tendering phase.When acting as Project Manager, responsible up to the start of commercial operations Show less

      • Project Director

        Jan 2024 - now
      • Lead Tender MED

        Jul 2018 - Dec 2023
      • Tender Manager / Project Manager

        Jan 2016 - Jul 2018
  • Licenses & Certifications

    • LILATE Certification C1 / Japanese Certification

      LILATE
      Jan 2022
    • Japanese Language Proficiency Test (JLPT N2)

      Japan Foundation and Japan Educational Exchanges and Services
      Jan 2019
    • Project Management Professional (PMP)®

      Project Management Institute
      View certificate certificate