
Wayne Liu
Civil Structural Engineer

Connect with Wayne Liu to Send Message
Connect
Connect with Wayne Liu to Send Message
ConnectTimeline
About me
Snr Project Manager at Calibre
Education

Curtin University of Technology
2001 - 2005Bachelor’s Degree Civil and Construction Engineering
Australian Institute of Business
2016 - 2018Master’s Degree Business Administration
Melbourne Institute of Technology
2021 - 2022Graduate Certificate in Cyber Security and Networking Information Technology Course Average - Distinction or above
Experience

KBR, Inc.
Jan 2005 - Jul 2008Civil Structural EngineerRioTino 320MTPA Upgrade - Standardisation ProjectRioTinto Hope Downs 1 Iron Ore ProjectRioTinto Western Turner Syncline Iron Ore ProjectRioTinto Marandoo Mine Phase 2 Iron Ore ProjectWafi Mine Harmony Copper Gold Project - PNGAustralian Marine Complex Services Pits UpgradeCurtis Road Upgrade - Adelaide, South AustraliaMain Roads WA 110km Eyre Highway Upgrade

TBH
Feb 2005 - Jul 2005Junior ConsultantConstruction dispute resolution
.webp)
GRD Minproc (acquired by AMEC)
Jul 2007 - Jul 2008Structural and Civil Engineer- Chelopech Copper / Gold Expansion Project - BulgariaStructural analysis for addition of cyclones, agitators, launders, tanks, kilns, access platforms and stairs, cooling tower, conveyors, pipe racks, bridges, and filter building;Modification to existing structural supports.- BHP Olympic Dam Expansion ProjectStructural analysis for addition of adsorption plant, elution plant, agitators, and concentrate feed tanks;Modified existing support structures to cater for additional loading.- Portman Iron Ore - Koolyanobbing Mine Crane BridgeBridge design for crane access to improve access safety;Design of lifting frames for crusher main shafts.- FMG Heng Shan Iron Ore Expansion ProjectStructural design of transfer stations; Structural design of conveyors. Show less

Thiess
Jul 2008 - Jul 2010Project Engineer► Responsible to liaise closely with clients and contractors to ensure design plan, and scope of works were carried out in order.- RGP 6 - Jimblbar Access Road and Rail FormationConstruction of 11km of rail formation duplication;12.5km of sealed access road;5.5km of existing road upgrade (resurfacing and sealing).- Sino Iron Ore ProjectConstruction of 24km of heavy vehicle haul road;80m wide 4km long heavy vehicle causeway over estuarine mud;120m causeway bridge across river (concrete deck on steel piles);Environmental pond earthworks (Cut: 300,000m3, Fill: 50,000m3);Raw water pond earthworks (Cut: 200,000m3, Fill: 40,000m3);Concentrator earthworks (Cut: 120,000m3, Fill 140,000m3). Show less

Calibre Global
Jul 2010 - Apr 2012Senior Civil Engineer► Fast paced position where I provided technical skills on a range of activities including site selection for all infrastructure, design of earthworks and drainage, preparation of reports, coordination between disciplines, clients and external project members.- FMG Central Pilbara Project - Stage 1 & 2Stage 1 and Stage 2 iron ore facilities were designed to produce 80Mtpa and 40Mtpa respectively, both include Stockyard, Ore Processing Facility, Train Load Out, Heavy Vehicle Workshops, Explosives Compounds, Accommodation Villages, Power Station, Satellite Crushing Hubs, Go-lines, Overland Conveyors, High Voltage Transmission Lines, Mine Dewatering Pipeline Network, Heavy & Light Vehicle Road Networks, and Airstrip.- FMG Solomon ProjectA 60Mtpa iron ore facility that includes Stockyard, Ore Processing Facility, Train Load Out, Heavy Vehicle Workshops, Explosives Compounds, Accommodation Village, Overland Conveyors, Heavy & Light Vehicle Road Networks, and Airstrip.- FMG Christmas Creek Project - Stage 2The stage 2 project was designed to increase the overall mine output capacity to 55Mtpa; it includes expansion to the existing Stockyard, Train Load Out, Power Station and Permanent Village; together with New Ore Processing Facility, Satellite Crushing Hubs, Overland Conveyors, Light Vehicle Road Networks, and Airstrip. Show less

Chevron
Apr 2012 - Apr 2016Lead Construction EngineerGorgon LNG ProjectThe $60 Billion Gorgon Project is situated in an A-Class nature reserve off the north-west coast of WA. The LNG facility comprises a three train LNG Plant capable of producing a total of 15 MTPA using APCI liquefaction technology and includes a 300TJ/d Domestic Gas processing and compression plant. The selected offshore supply configuration is to supply the feed gas for the facility from the Gorgon and Janz fields► Hands on role where I was responsible to lead, manage, coordinate and supervised teams of engineers, contractors and supervisors across site construction plans and defined project scopes in line with safety obligations and schedules.- Civil and Underground Package (>$3 Billion)Executed under the CUG work package, it includes installation of civil and concrete works, underground services, drainage and waste system, and miscellaneous paving works for three LNG Trains, three AGRU Trains, three CO2 Compression Trains, five GTG units, four Ground Flares, Gorgon and Janz Inlet Facilities, Utilities System and MOF Causeway.- Miscellaneous Civil & Buildings Package ($600 Million)The package includes a range of temporary and permanent works across the LNG plant site and Off-plot items. Main scopes were civil works to support ongoing site operations; temporary earthworks to support heavy lift operations, civil and underground related scope, installation of miscellaneous buildings, turnover facilities, and road sealing works.- General Services Package ($200 Million)This package was to execute unidentified scope of works which were not included in the pre-defined overall project scope. The contract comprises the provision of multi-skilled work force and equipment by the contractor to perform activities such as construction, commissioning, design and fabrication of materials, project support activities, and maintenance activities. Show less

Jacobs
Aug 2016 - Nov 2016Project EngineerOyu Tolgoi (Copper-gold) Underground Project - MongoliaThe Oyu Tolgoi Gold and Copper Mine (owned by Oyu Tolgoi LLC, a joint venture between Rio Tinto and the Mongolian government) is located in the South Gobi region of Mongolia,approximately 550 km south of the Mongolian capital, Ulaanbaatar (UB).Jacobs Engineering was contracted to provide EPCM services for the phase II facilities for OyuTolgoi’s Underground Project. The large copper-gold deposit is planned to be mined from underground utilising mechanised block cave methods. The underground portion is expected to produce 90,000 tonne per day of ore.► Fast paced position where I provided project management duties from early development phases for a number of packages, main scopes included:- Oyut Camp IIResponsible for the establishment of tender packages, tender evaluation and award, ongoingmanagement of procurement, fabrication, logistics and installation of all associated components. The 3-storey accommodation buildings are designed to house 5,500 people, it is made up of pile foundations, precast concrete structures, modular buildings, switchyard and substations. Services include electrical and data cables, piping services, tie-in of electrical infrastructure to existing main substation area, and furniture.- Freight ServicesEstablished freight delivery services from various suppliers in China, Switzerland and Poland to the Oyu Tolgoi site in Mongolia, determine trans-border transport routes and customs clearance requirements. Show less

Family
Nov 2016 - Mar 2017Family Commitment
Tengizchevroil
May 2017 - Jul 2020Facility Owner
Jul 2018 - Jul 2020Construction Engineer
May 2017 - Jul 2020

Calibre
Sept 2020 - nowSenior Project Manager
Dec 2022 - nowProject Manager
Sept 2021 - Dec 2022Senior Project Engineer
Sept 2020 - Sept 2021
Licenses & Certifications

Graduate diploma in management
Australian Institute of Business
Languages
- enEnglish
- chChinese
Recommendations

Abhishek vaid
Graphic Designer and Video EditorEdmonton, Alberta, Canada
Agnieszka kołodziejczyk
Power BI DeveloperWarsaw, Mazowieckie, Poland
Arnis antulis
Baltic Core Group manager at IF P&C INSURANCETukums, Tukums, Latvia
Ehsan behnampour
DevOps EngineerTehran Province, Iran
Jill francisco, acp
Litigation Paralegal / NALA Past PresidentWayne County, West Virginia, United States
Krishna kant shrivastava
Senior Director BFSI Group Brazil | Heartfulness Trainer - Transformation through transmissionNoida, Uttar Pradesh, India
Nomiki koutsoumpari
Teaching and Research Associate at University of PlymouthPlymouth, England, United Kingdom
Rich limone
Senior Systems EngineerWinthrop, Massachusetts, United States
Kat siddle
Sample Librarian at lululemonVancouver, British Columbia, Canada
Fahimeh atyabi
Computer software engineerTehran, Tehran Province, Iran
Burak doğusoy
Facility Management Professional | AI Enthusiast in Real Estate & Site OperationsIstanbul, Istanbul, Türkiye
Dominic harrison
Software Support Engineer at Union Street Technologies LTDRochester, England, United Kingdom
Peter janssen
PAKS-LSC (Life Sciences Consultancy)Ankeveen, North Holland, Netherlands
Adithya bhat
Record to Report Operations AnalystBengaluru, Karnataka, India
Md. mohibul alam
Marketplace||E-Commerce||Fintech||Customer Experience||Customer Care Center||Market Operation||WIC||...Bangladesh
Christina cusati
Senior Manager at EYGreater Stockholm Metropolitan Area
Santosh lokare
Marine Application Expert | ERP System Expert | Analyst | Power BI | PMS AnalystMumbai Metropolitan Region
Aswin subramaniyan
Senior Consultant at Protiviti | Microsoft Certified Professional (MCP) | Learner | Ex-EYChennai, Tamil Nadu, India
Ankit pandey
Ex Intern - @ Oasis Infobyte | Student at Dr. APJ Abdul Kalam Technical University| Web development ...Lucknow, Uttar Pradesh, India
Olanike salau
Infrastructure | Development Finance | Deal AdvisoryCity of Johannesburg, Gauteng, South Africa
...