Billy Leung

Billy Leung

Assistant Engineer

Followers of Billy Leung326 followers
location of Billy LeungToronto, Ontario, Canada

Connect with Billy Leung to Send Message

Connect

Connect with Billy Leung to Send Message

Connect
  • Timeline

  • About me

    Construction Manager at China Road and Bridge Corporation

  • Education

    • Chu Hai College of Higher Education

      2004 - 2008
      Bachelor of Engineering (BEng) Civil Engineering
  • Experience

    • AMEC-Hong Kong Construction CC202 Joint Venture

      Oct 1999 - Dec 2003
      Assistant Engineer

      KCRC CC202 - West Rail Yuen Long and Long Ping Stations (Contract Sum HK$1.2 billion) Responsibilities on the project included, construction of box culverts, retaining walls, pipe jackings, storm drains, sewerages, watermains, road pavement works with signalised junctions, landscaping works and traffic diversion

    • Acciona Infraestructuras, S.A

      Jan 2004 - Mar 2009
      Senior Engineer

      HyD HY/2003/01 - Route 8 – Lai Chi Kok Viaduct. Lai Chi Kok Viaduct (LCKV) (Contract Sum HK$1.1 billion)Responsibilities on the project included, coordination with other construction teams to plan the construction sequence and design / implementation of TTM. Coordinate with Government Departments and relevant stakeholders regarding utilities diversion and handling of public complaints

    • Penta-Ocean Construction Co. Ltd.

      Oct 2009 - Mar 2010
      Senior Engineer

      CEDD KL/2009/01 - Site Formation for Kai Tak Cruise Terminal Development (Contract Sum HK$1.34 billion)Lead a team of engineers and supervisors, removal of existing abandoned structures under the runway, removal of obstruction for piles driving works, setting up of silt curtain and removal of existing seawall

    • Leighton Asia

      Mar 2010 - Oct 2010
      Senior Engineer

      MTRC XRL Contract 822 - Tse Uk Tsuen to Shek Yam Tunnels (Contract Sum HK$3.2 billion)Lead a team of engineers and supervisors for the upgrading works at Shing Mun prior to the construction of ventilation shaft, tree monitoring, geotechnical instrumentation and temporary traffic management

    • Maeda Corporation

      Oct 2010 - May 2011
      Senior Engineer

      MTRC XRL 823B - Shek Kong Stabling Sidings & Emergency Rescue Sidings (Contract Sum HK$3.2 billion)Lead a team of engineers and supervisors for the Middle Zone construction works. Major construction works include site formation, diaphragm wall, socketted H-pile and box culvert constructionMTR Contract South Island Line (East) 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts and Aberdeen Channel Bridge – Stage 2 TenderResponsible for tender submission for the section of temporary traffic management and utilities diversion Show less

    • Leighton Contractors (Asia) Ltd

      Jun 2011 - Aug 2013
      Sub Agent

      MTRC SIL(East) 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts and Aberdeen Channel Bridge (Contract Sum HK$2.6 billion) Lead a team of engineers and supervisors for the construction twin DN450 rising mains, utilities diversion, pipe jacking, road and drainage works and planning & implementation of temporary traffic management schemes

    • Sembawang Hong Kong Limited

      Sept 2013 - Nov 2015
      Site Agent

      MTRC SCL1106 - Diamond Hill Station (Contract Sum HK$2.6 billion)Lead a team of engineers and supervisors for the excavation of the underground station, construction of the station, external works, advance works for shifting of Lung Cheung Road to facilitate the construction of adits connecting between the new and old stations

    • China Road and Bridge Corporation (CRBC)

      Dec 2015 - Jul 2022
      Senior Construction Manager

      CEDD YL/2020/02 – Development of Lok Ma Chau Loop: Main Works Package 1 – Contract 2, Western Connection Road Phase 2, Connection Roads to Fanling / San Tin Highway and Direct Road Link Phase 1.Senior Construction Manager, lead a team of Engineers and Supervisors for the construction works, prepare master programme. Assist commercial team on preparation of BQ and subcontract, claim issue. Ensured all works are carry out according to the programme and in safely manner and environmentally.HKAA AA3302 – Three Runway System Project Contract 3302 - Eastern Vehicular Tunnel Advance WorksConstruction Manager, lead a team of engineers and supervisors for the construction works from CH130-445. Major construction works include foundations and structures for the EVT Southern Portion and Road, Tunnel Plant Building C, modification of fuel chamber, reconstruction of Taxiway includes drainage system, Airfield Ground Lighting (AGL) system and airfield pavement.CEDD KL/2014/03 – Kai Tak Development – Stage 3 Infrastructure Works for Developments at the Southern Part of the Former Runway (Contract Sum HK$2.176 billion) Construction Manager for Road and Drainage Team. Major construction works include subways connecting the future hospitals, temporary diversion of Shing Cheong Road to facilitate the construction of D-wall and SUS, utilities diversion, temporary traffic management, permanent road widening works and demolition of radar tower, etc.CEDD CV/2013/08 – Lian Tang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 (Contract Sum HK$6.518 billion)Section Agent, lead a team of engineers and supervisors for the construction of two sections of at-grade road and Ping Yeung Interchange. Major construction works include site formation, cut/fill slope, retaining walls, noise barriers, watermain, road and drainage works, etc. Show less

  • Licenses & Certifications

    • Member

      Chartered Institution of Highways & Transportation (CIHT)
      Jan 2009
    • Member

      INSTITUTE OF HIGHWAY ENGINEERS
      Jan 2012