Mohamed Esieed

Mohamed Esieed

Associate Partner, Project Manager and Sr. Structural Engineer

Followers of Mohamed Esieed68 followers
location of Mohamed EsieedAbu Dhabi Emirate, United Arab Emirates

Connect with Mohamed Esieed to Send Message

Connect

Connect with Mohamed Esieed to Send Message

Connect
  • Timeline

  • About me

    Managing Director at Contracting Company

  • Education

    • City College of the City University of New York

      1984 - 1985
      Master’s Degree Civil Engineering Major in Structural Design.
    • City College of the City University of New York. New York, USA

      1981 - 1984
      Bachelor’s Degree Civil Engineering
  • Experience

    • GEIGER ENGINEERS CONSULTANT. NEW YORK, USA

      Jul 1985 - Dec 1997
      Associate Partner, Project Manager and Sr. Structural Engineer

      •Worked with Geiger Group through their transition from Geiger Associates to Geiger/KKBNA and finally to Geiger Engineers P.C. New York, USA as a Structural Design Engineer / Project Manager & Associate Partner.•The Company is mainly specialized in the design and supervision and management of long span special structures such as closed stadiums and sports arenas, Shopping Malls, residential and commercial buildings.•Managed the Design and Construction Supervision works of Sports Arenas and facilities that required special long span roof structures design of different types. Show less

    • Dar Al Handasah Consultants (Shair & Partners) Dubai, UAE.

      Feb 1998 - Jan 1999
      Sr. Structural Engineer

      Department of Civil Aviation, Engineering Support Group – Dubai, UAE •Working as the Client Representative with a team of Professional Engineers of all disciplines to support the implementation of an established management program for Dubai Airport Phase I Expansion Projects, with a cost of over One Billion US Dollar.•Coordinated all Technical & Construction matters with a wide range of Consultants, Contractors, Suppliers and Service Providers.•Review of Consultants’ Design and Technical submissions.•Conducted “Value Engineering” based on comprehensive design audits, in addition to professional analysis of Scope of Works vs. End Users’ requirements to identify potential areas where cost saving can be achieved. Dubai Free Zone Facilities (within Dubai Airport land)•Reviewed all shop drawings and supervised the structural construction and modified design as required to suite the existing condition.Burjuman Expansion (Malls, Residential and Commercial Towers)•Complete review of the full Structural Concept Design, carried out by M/s Buro-Happold (UK) Consultants, and issued a Technical Report with Recommendations to Dar Al Handasah main Design Office in Cairo, Egypt. Show less

    • Copenhagen Group Consultant. Engineers, Architects, Planners. Dubai, UAE.

      Jan 1999 - Sept 1999
      Head Of Engineering Department

      Directing work of all Engineers, fully responsible for all design, tender and supervision works of Residential Complexes, design of multi-use high rise Buildings, Hotels and Convention Centers.At the same time, I was seconded to Dubai Civil Aviation as a Consultant Senior Structural Engineer / Construction Manager

    • Department of Civil Aviation, Engineering Projects Division - Dubai, UAE

      Oct 1999 - Mar 2006
      Sr. Technical Manager, Construction Manager, Sr. Structural Engineer

      March’04-March‘06 Senior Technical Manager – Head of the Technical UnitSep.’01 - Feb.’04 Technical Manager – Head of the Technical UnitEstablished and managed the Technical Unit of the Engineering Projects Division (which is the Project Management Division of Dubai Civil Aviation for the Expansion Projects of Dubai Airports) and lead a team of over 30 Engineers of all disciplines in providing efficient, effective and professional Project Management for Phase II expansion projects for Dubai International Airports. Oct.’99 – Aug. 2001 Construction Manager / Senior Structural Engineer• Lead Construction Manager for the Dubai Civil Aviation Phase-I expansion• Lead a team of Professional Supervision Engineers of all disciplines • Successfully managed and closed-out most main construction contracts. • Coordinated all stakeholders meetings Show less

    • Sama Dubai (formerly Dubai International Properties). Member of Dubai Holding

      Apr 2006 - Apr 2007
      Project Director / Sr. Projects Manager

      Projects Director: Dubai Health Care City Phase II and Harvard Medical School located in Sr. Project Manager existing DHCC Phase I. (Approx. 7 Billion AED).Directing a team of engineers to manage the above projects which Included 25 storey Hotel, Residential & Commercial Towers, Hospitals and Clinical Villas, Roads and services including all utilities (Substations and District Cooling).Projects Director: The Lagoons. 95 Mil. Sqft GFA multi-land use development. (AED 85 Bill.) Sr. Projects Manager Directed a project management team of over 42 staff of multi-disciplines including Sr. Project Managers. The Development consisted of over 350 plots for buildings ranging from Villas to mostly Towers up to 99 story high The Infrastructure included excavating the Lagoons of up to 200 meters wide, manmade water edge treatment 40 kilometers long with water lock, underground traffic tunnels and long span bridges. Show less

    • Dubai Health Care City (DHCC) (Member of TATWEER) Member of Dubai Holding

      Apr 2007 - Sept 2009
      Project Director

      Project Director: DHCC Phase-I Expansion Project. Joined DHCC as a Project Director and Special advisor to set up the Engineering Dept. of DHCC and direct and manage all the ongoing design and construction in Dubai Health Care City’s Phase-I Expansion Project which included a 34 storey 5 star Hotel Tower and a 24 story furnished apartment Tower building, in addition to Harvard Medical School (G+8) and also assisted in the management of the University Hospital (AED 2.5 million, G+12).Project Director: DHCC Phase-II Expansion Project. Continued through DHCC’s appointed Project Management Consultant (Modern Project Management) as the Project Director for DHCC Phase-II Expansion Project which included 25 Storey Hotel tower, Residential and Commercial Towers, in addition to Hospitals, Clinics, Residential and Commercial buildings and the entire associated infrastructure work for the development with an estimated cost of AED 7 Billion. Show less

    • Hill International Ltd. Project Management Consultant, USA

      Oct 2009 - Aug 2012
      Project Director

      Project Director: Marsa Zayed Phase I Development Project in Aqaba in Jordan. The development is a mixed use with a plot area of 3,200,000 Sq. meters and a built up floor area of 6,400,000 Sq. meters and an estimated construction cost of 10 Billion US Dollars.Project Director: Jabal Omar Development Project in Makkah, Saudi Arabia. 36 towers (26 “Five Star” Hotels & 10 Residential Towers) with built up floor area of approximately 2 million square meters. Project estimated value over 20 Billion Saudi Riyals. PMC Team expected to be over 70 staff.Project Director: Bahrain International Airport Expansion Project, Bahrain.Directed a team for the Major Expansion of the airport with an estimated value of UAE 20 Billion Dirhams. Show less

    • Proger S. p. A. Engineering and Management

      Apr 2013 - Nov 2015
      Program Director

      Program Director: Working for the consultant above as the Program Director for the Mega Project with multiple construction sites for KSA Ministry of Interior “Third Phase” Project, planning and developing all security headquarters across the kingdom and in charge of:1- 844 Managers, Engineers and admin. Staff. As per contract.2- Project and Program Management, design review and supervision of the project which consists of:a. 610 Construction Sites (Projects) all over the Kingdom of Saudi Arabia.b. Over 3400 buildingsc. A Built up area over 1,800,000 Sq. Meterd. Over 44 Prototypes of designe. Contract value of almost 12 Billion Saudi RiyalsProgram Director: At the same time for about 10 months (July 2013-March 2014 ) and until a Director was appointed for KAP4 Project I was assigned to direct Phase 4 of King Abdullah Project which is to develop the main Ministry of Interior Main Security Headquarters, Officers Clubs and Housing. Budgeted Project cost was 7.5 Billion Saudi Riyal (SAR) with a management team of 375 managers, senior engineers and admin. Staff. Total Construction Sites are 24 located in the Eastern, middle, western and southern provinces of KSA. Show less

    • Contracting Company - Confidential

      Dec 2015 - Apr 2017
      Managing Director

      Directing all major activities in the company and taking decisions.

    • Emirates International - Subsidiary of Das Holding

      Apr 2017 - Dec 2018
      Director of Engineering & Construction

      I set up the Engineering and Construction departments including recruitment of engineers and personnel and established the management and construction procedures for the engineering and construction including the tendering process.The company successfully were awarded Ministry of Education projects which were completed successfully by the new departments for the third year in a row

    • Contracting Company

      Dec 2018 - now
      Managing Director
  • Licenses & Certifications

    • Primavera P6 – 8.3 Version

      Egyptian Engineers Society at Riyad, KSA Branch
      Apr 2014
    • Health & Safety for Directors and Senior Managers

      Training course by M/s British Safety Council
      Jun 2003
    • Mastering Technical Writing

      Training course conducted by M/s Projacs Training & Development Group – Dubai, UAE.
      Jan 2003
    • 10 Leadership Qualities that Motivate People

      Seminar by M/s event Management Agency EMA - Dubai, UAE.
      Jun 2002
    • EXP 202A & B - Using Primavera Expedition for Contract Administration

      Training Course by “Projacs” Project Management & Controls Co.
      Dec 2001