
Timeline
About me
Engineer
Education

Universitatea tehnică de construcții din bucurești
-Diplomă de inginer (inginer diplomat) topografie si cadastru
Experience

Sc topcad srl
Jan 2008 - Apr 2010SurveyorCadastre and land registration (land with/without construction, inside/outside the village, agricultural/forestry)Legal analysis of property documents, Consultancy on acquisitions and Technical reportsLand identification according to cadastral plans.GIS, Databases,Materialization on the field of elements of a construction, access roads.Measurement of cross-sectional and logitudinal profiles of a road.Measuring the levelness of a residential building.Measuring and checking the verticality of GSM antennas.Measuring the technical holes of a building, reporting them in a 3D plan and comparing them with their projected position.Measurements necessary for volumetric calculations and drawing up reports on it.Drawing up the plans necessary for the establishment of wind farms.Three-dimensional surveys of the building facades to verify the verticality of the facade and to cover it with glass.Monitoring the behaviour of buildings (UCC) - report on subsidence and cracks in buildings adjacent to the target.Knowledge of the use of the total station, single frequency GPS, GPS-RTK, processing of measurements made with them, reporting in Autocad, drafting plans and drawing up technical memos or reports to beneficiaries.Equipment used: GPS: Trimble R3, Epoch 35 L1/L2 RTK, Topcon HiperPro L1/L2 RTK, Ashtech ProMark 500 L1/L2 RTK, Trimble S6, Trimble 5600, Trimble 3603, Topcon DL-101C. Show less

Apolodor
May 2012 - Jul 2017Land surveyorExtraction of the elements to be marked out from the situation plans and cross sections.On-site stakeout of motorway embankment elements.Measurements and calculations of volumes in order to prepare the statement of works.Calculation of the construction works and volumes of earthworks to be carried out until the completion of the project.Road system surveying.Stakeout of the foundations for civil constructions.Positioning of the pillars for industrial buildings.Necessary works for the execution of bridges.Pile boring position, position of the embankment and elevation of bridge piers.Checking the alignment of the beam section and its counter alignment and comparison with the project plans. Measuring and verifying the executed position of the anchorages. Drawing the dimensions of the overbearing plate over the beams.Drawing the positioning axes of the beams on the joists.Drawing and verification of the installation of the 600 to. metal bridge using a floating crane.Preparation of various reports to consultants, designers and beneficiary.Measuring of the executed elements (as build).Measurements to monitor and verify the position of the bridge pillars at different stages of the bridge execution.Necessary measurements for the installation of the cables and checks after installation.Measurements during bridge tests before delivery. Show less

Romanian national road infrastructure company - c.n.a.i.r. s.a.
Jul 2017 - Feb 2023Project engineerFollow-up of the Contractor's and/or Providers' fulfilment of contractual obligations, by:a) checking the technical documentation and/or documents prepared by the Design Services Providers/Contractors relating to the design phase, and carrying out the acceptance of services;b) verification of the reports and/or documents drawn up by the Consultancy Service Providers for supervision, as well as carrying out the acceptance of servicesc) verification of the payment certificates drawn up by the Supervision Service Providers relating to the works carried out by the Contractord) carrying out site inspections to check the work of the Supervision Consultancy Service Providers and monitoring the progress of the works; e) issuing claims by the Employer; f) countering Contractor's claims;g) applying penalties to the Service Providers/Contractors in the event of their failure to fulfil their contractual obligations;Follow-up of the fulfilment by Employer of its contractual obligations, by:a) approval of payment certificates;b) approving the reports drawn up by the Providers;c) checking and forwarding for payment the invoices issued by the Providers/Contractors;d) organising the Acceptances on completion of works and Final Acceptances within the framework of the implemented works execution contracts;The execution of payments made under the service contracts / implemented works contracts within the Accepted Contract Value;Realization and instrumentation of claims settlement in the DAB;Preparation of the necessary documentation for the approval of changes occurring in the execution of works;Communicating to the specialised functional departments of Employer the situations giving rise to disputes and/or litigation, as appropriate, and providing the documentary and informational support required to draft Employer's defences;Management of the information support provided by the specialised functional compartments, concerning the achievement of the project objectives. Show less

Aktor sa
Feb 2023 - nowCommercial manager
Licenses & Certifications

Manager proiect
Top quality managementNov 2020
Topograf autorizat
AncpiFeb 2017
Languages
- enEngleză
Recommendations
_Yoon.webp)
Jongjoon(jay) yoon
Senior Manager - SK Broadband, Data Center and Connectivity Sales for Global CompanySeoul, South Korea
Shreya sharda
PhD (Finance)Chandigarh, India
Adam korpaczewski
Threat Detection & Response AnalystGreater Southampton Area
Rehmat qazi
React Js | React Native | Webflow | Responsive Designs | UI / UX Designer | Graphic DesignerIslamabad, Islāmābād, Pakistan
I komang oka raharja
Legal Officer/Staff | Legal Associate | Legal Consultant | Legal Administration | Legal AdvisorGianyar, Bali, Indonesia
Veaceslav orlioglo
Full Stack Engineer at GOLIVE SOLUTIONSMoldova
Osvaldo melgarejo
Coordinador de Obra en DACAB SRLParaguay
Nguyet nguyen, shrm-scp
HR Director, HR ConsultationBiên Hòa, Dong Nai, Vietnam
Anna shalini
Early Years Coordinator at Mount Litera School InternationalMumbai, Maharashtra, India
Hai son do
Mechanical Engineering Student at RWTH Aachen UniversityAachen, Nordrhein-Westfalen, Deutschland
Jayanta kumar sengupta
Manager With accounts and Banking, insurance experienceKalyani, Bengale-Occidental, Inde
Mithun manivannan
Python Developer | Backend & Automation | Flask/Django | AI & ML Enthusiast | Open to Full-Time Oppo...Peterborough, Ontario, Canada
Komal sharma
Lead Tech Mentor @ Crio.Do | EdTech & Upskilling Advocate | Helping Professionals Excel | Technical ...Chandigarh, Chandigarh, India
Temitope ilori
Early Years ProfessionalLagos State, Nigeria
Joan brent
The City of San Diego, Clerical Assistant IISan Diego, California, United States
Rachna .
Looking for opportunities in fraud detection and loansDelhi, India
Bernadette dooley
Assistant Director, Risk ManagementGreater Melbourne Area
Andrew bond
Voice Artist and Creative ProducerNorthampton, England, United Kingdom
Mario cocio
Psicólogo Deportivo y DocentePanamá
Vasiliy kryuchkov
Exucitve Project Manager в Nadine Interiors LtdRussia
...