Aaron Quick

Aaron Quick

Equipment Operator - Third Class Petty Officer

Followers of Aaron Quick1000 followers
location of Aaron QuickWake Forest, North Carolina, United States

Connect with Aaron Quick to Send Message

Connect

Connect with Aaron Quick to Send Message

Connect
  • Timeline

  • About me

    Operations Director at Riverside Resources, LLC

  • Education

    • University of Alabama

      2003 - 2006
      BS Civil Engineering: Focus in Stormwater Design & Construction Management
    • Shelton State Community College

      2001 - 2003
      AS Advanced Pre-Engineering
    • United States Naval Reserve

      1993 - 2001
      Equipment Operator Training Certification Construction/Heavy Equipment/Earthmoving Equipment Operation EO3
    • Tates Creek High School

      1991 - 1993
      Diploma
  • Experience

    • United States Naval Reserve

      Oct 1993 - Oct 2001
      Equipment Operator - Third Class Petty Officer

      Heavy construction equipment operation including five and fifteen ton dump trucks, 6000LB rough terrain forklifts, front end loaders, motor graders, and bulldozers.

    • J.T.M.C. Properties, LLC

      Jun 1999 - Jul 2001
      Regional Service Manager

      Point of contact and dispatch for over twenty mobile home sales lots and customers for HVAC and underpinning installation and service.

    • B.L. Harbert International, LLC

      Jan 2004 - Aug 2005
      Construction Engineering Intern

      Responsible for bidding and estimating duties, quality control and assurance, prequalification proposal layout and design.Completed subcontractor closeout reports, certified payroll reports, submittal and transmittal drawings and letters, as-built construction drawing updates, RFI logs.

    • Bald Head Island Club Renovation

      Jun 2006 - Sept 2006
      Assistant Project Manager

      Completed project management and engineering duties to closeout project, including cost controls, contract administration, and punch list completion.

    • Yonkers Industries, Inc.

      Jun 2006 - Mar 2013
      Project Manager
    • Eisai, Inc

      Aug 2006 - Sept 2008
      Project Engineer

      Central Utilities Building and Parking Lot Expansion ProjectsExpedited all submittals, RFIs, material and equipment deliveries.Developed and maintained P3 construction and turnover schedule.Directly planned and supervised utility tie-ins to an operating pharmaceutical facility with zero unplanned interruptions.

    • GlaxoSmithKline

      Sept 2008 - May 2009
      Assistant Project Manager

      Commit Penthouse Upgrade ProjectEquipment upgrade expediting, delivery, installation, startup, and integration.Vacuum transfer piping installation.CIP piping installation.Dust collector upgrades and associated HVAC installations.

    • Talecris Biotherapeutics, Inc.

      Apr 2009 - Jan 2012
      Project Manager

      B800 Steam Sanitization Project: July 2011-January 2012Full PM Including Design Review, Contract Buyout, Change Controls, Field Install & Shutdown Work in Clean Facility, and Startup Support.IGIVc Debottlenecking Project: June 2011-December 2011Preconstruction Services Including Budgeting, Scheduling, and Proposal Generation.CAPEX South Plant Pipe Bridge Project: July 2011-October 2011Pipe Bridge Concrete Foundations / Piers, Steel Erection, Process Waste Sewer Relocation (Piping & Manhole), Pavement Repairs, Inspections, & Painting; Project located along busy roadway with significant coordination required with main delivery terminal into production.Koate Depth Filtration & Thaw Relocation Project: August 2010-October 2011Process installations including equipment, facilities modifications, and utilities upgrades. Construction completed during production shutdown over two week period including critical change work and major demolition of slab and block walls, underground piping, structural & architectural rebuilds, and utilities connections between two production zones.B300 Freeze Dryer Replacement Project: November 2010-July 2011Procurement, installation, and commissioning support for new lyophilizer equipment including critical change procedures and scheduling.B500 QC Lab Renovation Project: April 2009 - October 2010Delivered 6 months ahead of schedule and 13% under total CM budget.Raw materials & plasma chemistry lab upgrades including casework, fume hoods, new AHUs, MCC, power conditioner, vacuum pump, specialty lab gases, full architectural and office upfits, structural reinforcement and decking, clean and dirty utilities, change controls, commissioning, and startup duties. Show less

    • Procter & Gamble

      Dec 2011 - Mar 2013
      Project Controls Manager

      Responsible for All Project Controls Including Budget, Forecasting, Invoicing, and Schedule Generation / Updating.

    • Georgia-Pacific LLC

      Jul 2012 - Mar 2013
      Planner / Scheduler / Program Manager

      Program management including cost and schedule development, venture summary and funding support, conceptual design and alternatives selection, engineering supervision, and administration for a large, multi-site venture.

    • Riverside Resources, LLC

      Mar 2013 - now

      Shutdown planning, project management, and construction administration for capital and maintenance work including Steam Plant Upgrades (DA Tank Replacement), Electrical Infrastructure Upgrades (Automatic Transfer Switch Replacement), CIP System Upgrades, Site Master Planning, and Facilities Upgrades.

      • Operations Director

        Jun 2014 - now
      • Project Manager

        Mar 2013 - Jun 2014
  • Licenses & Certifications

    • 30 Hour Safety Training

      OSHA
      Sept 2008
    • 30 Hour Construction Safety & Health Training

      OSHA Safety Training Institute
      Mar 2019