Martin Onuzulike

Martin Onuzulike

Pipeline Construction supervisor

Followers of Martin Onuzulike1000 followers
location of Martin OnuzulikeNigeria

Connect with Martin Onuzulike to Send Message

Connect

Connect with Martin Onuzulike to Send Message

Connect
  • Timeline

  • About me

    EPC-Consultant

  • Education

    • NSchE

      2010 - 2011
      Member Chemical Engineering
    • Enugu State University of Science and Technology

      1982 - 1987
      BENG CHEMICAL ENGINEERING

      Activities and Societies: Foot Ball, Music, Traveling and Party Challenges makes me more stronger in life.

  • Experience

    • EXXONMOBIL NIGERIA LAGOS

      Apr 2006 - Nov 2009
      Pipeline Construction supervisor

      Pre-construction inspection of critical crude pipeline replacement/hook ups of 24" X 17 KM project materials for fitness for purpose, dimensional inspection (ovality, thickness, bevel, length, circumference) of pipes risers, bends, pipe fittings ( Swivel flanges, WNRF, RTJ, blinds) gasket and heavy duty Hex Bolts/Nuts. inspection of weld seam, coating and pipeline materials integrity/traceability evaluation, reconciliation and approval for use, recommendation and report before load out. Positioning of S lay pipeline barge, stinger, tensioning, welding station, DMH on the Shallow and deep water area for the pipeline installations, hook ups, pipeline shore pull, tie-in, mattress installation, pipeline stabilization were required within shallow water operations with respect to all required code and general specifications and procedures.Fabrication and topside installations with respect to all required specifications and procedures. Show less

    • West African Ventures Ltd.

      Jul 2010 - Apr 2011
      Snr Sub-Sea Installation Engr

      Project materials, procedures, review, structures, piping, pipeline, flexible risers, jackets, Bridges fabrications, NDT, load out, position and installation . Topside Equipment, facilities, Buoys, Plem, SDV, ESDV installations by aid of ROV with respect to Company code and general specifications and pre-commissioning and commissioning/demobilization.

    • TOTAL E& P

      Dec 2011 - Aug 2016

      After NOPL 24inches x 50 KM pipe line fabrication and laying from Rumuji- KP 0 to owaza- KP 50, then Gas Plant construction from earth/ civil activities,.Structural and Piping construction from reviewing/vetting of drawings, isometric, plant layouts, P&IDs, structural and equipment drawings, fabrications, NDT, assembling and installations. flare stack, fire water tank, potable water tank, fuel gas package, liquid metering system, gas metering system, Equipment, facilities, vessels installations. Preparation of pre- commissioning and commissioning documents,inspection, punch listing, close out of punchlisted items and endorsement/approval of the primary equipment, process piping, structural members installation completion documents and supervision of pre- commissioning and commissioning activities/ signing off related documents. Show less

      • Construction Superintendent

        May 2014 - Aug 2016
      • ONSHORE PIPELINE FRONT END SUPERVISOR

        Dec 2011 - May 2014
    • Field Offshore Design Engineering Ltd-FODE

      Apr 2017 - now
      Construction Manager

      Manage and oversee the day-to-day Project/ construction management, Engineering Design, Project materials Procurement, Mobilization, Fabrication of Deck extension for new LACT Unit (Metering skid), offskid piping, and load out to site.Co-ordinate the following: Civil works-Equipment foundation, piling of Deck extension Legs and offshore installation of fabricated deck extension for New LACT unit.Responsible for implementation of the scope of work as related to construction/ fabrication, hook up, tie-ins of fabricated offskid piping spool and offshore pre-commissioning and commissioning of the facilities in conformance with project specifications, Scope of Work, and in accordance with the approved Project Schedule.Review man-hours and duration forecasts /Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance/ Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions. Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company and any other ad-hoc projects and duties as required by the management. Ensures all changes to specifications, work scope and drawings are documented. Monitor and report to Project Manager of project details, including progress, risks and opportunities in a timely manner.Monitor the start- up of the plant and De-mobilization of personnel and Equipment. Show less

  • Licenses & Certifications

    • HUET, Offshore pipeline project Execution, working at Height. Fall protection, BOSIET etc

      Membership in Oil and Gas