    Nov 2013 - Dec 2015

    Production Control Warehaouse and logistic

    PT Denso Indonesia
    Jan 2017 - Feb 2017

    Assistant Surveyor

    PT Wijaya Karya (Persero) Tbk
    Jan 2018 - Apr 2018

    Internship on the Sekampung Dam Building Project (Package 2)

    PT Waskita Karya (Persero) Tbk
    Jan 2018 - Feb 2018

    Surveyor

    Kementerian ATR/BPN Republik Indonesia - Kantor Wilayah Badan Pertanahan Nasional
    Kabupaten Pringsewu, Lampung, Indonesia
    Apr 2018 - Apr 2018

    Surveyor

    Kementerian ATR/BPN Republik Indonesia - Kantor Wilayah Badan Pertanahan Nasional
    Feb 2020 - Feb 2020

    Surveyor

    Kementerian ATR/BPN Republik Indonesia - Kantor Wilayah Badan Pertanahan Nasional
    Sept 2020 - Oct 2020

    Surveyor

    PT. SUPRA HARMONI ENGINEERING
    Apr 2021 - Nov 2021

    Field Facilitator (TFL)

    Kementerian Pekerjaan Umum dan Perumahan Rakyat
    Apr 2022 - Jan 2023

    Site Supervisor

    FiberHome
    Current Company
    Jan 2023 - now

    Computer Aided Design Operator

    Yachiyo Engineering.Co.,Ltd (Advisory Services)
  • About me

    Civil Engineering | Freelance Surveyor | Supervision

  • Education

    • Universitas bandar lampung

      2016 - 2020
      Bachelor of engineering - be civil engineering 3.39

      Activities and Societies: survyor, haiking, tracking, cyciling

  • Experience

    • Pt denso indonesia

      Nov 2013 - Dec 2015
      Production control warehaouse and logistic

      1. Receiving and rechecking the quantity of parts that have been inspected by the Quality Control Officer.2. Storing parts that have passed quality and quantity inspections according to the delivery information.3. Supporting the spark plug production line by preparing the necessary parts.4. Maintaining the accuracy of parts stock in real-time based on the database system.

    • Pt wijaya karya (persero) tbk

      Jan 2017 - Feb 2017
      Assistant surveyor

      1. Conducting leveling measurements for embankment work.2. Performing volume measurement for cut and fill of selected embankments.

    • Pt waskita karya (persero) tbk

      Jan 2018 - Apr 2018
      Internship on the sekampung dam building project (package 2)

      Internship activities on site:1. Studying the processes and methods of drilling using the NATM (New Austrian Tunneling Method).2. Studying the processes and methods of blasting in tunnels.3. Studying the methods of shotcrete application and wire mesh installation in tunnels.4. Studying the processes and methods of installing steel ribs in tunnels.5. Studying the methods of tunnel casting using sliding formwork.

    • Kementerian atr/bpn republik indonesia - kantor wilayah badan pertanahan nasional

      Jan 2018 - Feb 2018

      PTSL Desa Adiluwih, Kec. Adiluwih, Kab. Pringsewu PTSL Desa Rantau tijang, Kec. Pardasuka, Kab. Pringsewu

      • Surveyor

        Feb 2018 - Feb 2018
      • Surveyor

        Jan 2018 - Jan 2018
    • Kementerian atr/bpn republik indonesia - kantor wilayah badan pertanahan nasional

      Apr 2018 - Apr 2018
      Surveyor

      PTSL Desa Ciminyak, Muncang District, Lebak Regency, Banten Province1. Land measurements for residents applying for land certification.2. Process measurement data into survey drawings and documentation.

    • Kementerian atr/bpn republik indonesia - kantor wilayah badan pertanahan nasional

      Feb 2020 - Feb 2020
      Surveyor

      Redistribution of Certificates for Desa Trimulyo, Seputih Mataram District, Central Lampung Regency1. Land measurements for residents applying for land certification.2. Process measurement data into Survey Maps ,Drawing Document.

    • Pt. supra harmoni engineering

      Sept 2020 - Oct 2020
      Surveyor

      Assessment and Measurement of the BBWS Way Sekampung Reservoir, Lampung Province, FY. 20201. Topographic measurements of the reservoir's body and surrounding area.2. Collect soil samples from the reservoir's body.3. Survey the local community regarding the reservoir's performance.

    • Kementerian pekerjaan umum dan perumahan rakyat

      Apr 2021 - Nov 2021
      Field facilitator (tfl)

      1. Guide religious education institutions (LPK) in forming a Sanitation Infrastructure Implementation Team within the LPK environment.2. Guide the implementation team in preparing pre-construction administrative documents.3. Assist the implementation team during the construction process.4. Support the implementation team in preparing accountability reports.

    • Fiberhome

      Apr 2022 - Jan 2023
      Site supervisor

      1. Manage site progress from site surveys, SITAC, CME, to IT equipment installation.2. Ensure work quality base on design specifications and standards.3. Lead and guide subcontractor teams to achieve targets.4. Compile and manage site progress documentation.5. Manage resources for each site, including team manpower, material supplies, and equipment.

    • Yachiyo engineering.co.,ltd (advisory services)

      Jan 2023 - now
      Computer aided design operator

      Design On Project Urban Flood Control System Improvement In Selected Cities (UFCSI) Phase 2-Create Design Drawing-Assist Engineering-Hydraulics modeling with Hec RAS-Geotechnical modeling with Plaxis-Backup Daily, Weekly Report from Sub-Project

  • Licenses & Certifications

    • Ahli muda k3 konstruksi

      Badan nasional sertifikasi profesi (bnsp)
      Oct 2023
    • Pelaksana lapangan pekerjaan gedung - kelas i

      Lembaga pengembangan jasa konstruksi
      Oct 2021