Mohd Kamarul Ariffin Abd Hadi

Mohd Kamarul Ariffin Abd Hadi

Process Engineer

Followers of Mohd Kamarul Ariffin Abd Hadi2000 followers
location of Mohd Kamarul Ariffin Abd HadiPengerang, Johore, Malaysia

Connect with Mohd Kamarul Ariffin Abd Hadi to Send Message

Connect

Connect with Mohd Kamarul Ariffin Abd Hadi to Send Message

Connect
  • Timeline

  • About me

    Safety Officer

  • Education

    • National Institute of Occupational Safety and Health (NIOSH) Malaysia

      2011 - 2012
      Certificate Safety and Health Officer Course PASS
    • Sekolah Sains Sultan Haji Ahmad Shah (SHAHPEKAN)

      1996 - 2000
      SPM Technical Science
    • UNIVERSITI MALAYSIA PAHANG

      2017 - 2018
      Executive Master Safety, Health and Environment Class 1; CGPA 3.78
    • Universiti Teknologi MARA

      2001 - 2004
      Diploma Mechanical Engineering 2nd Class CGPA 2.70
  • Experience

    • Celestica

      Jun 2007 - Jun 2011
      Process Engineer

      Automation manufacturing operation (AMS) with Hewlett Packard (HP) Singapore at Senai, Johore, Malaysia

    • Siacon Technology Sdn Bhd

      Jul 2011 - Mar 2016
      HSE Officer

      1. High rise construction with SP Setia (Sky View).2. Construction of landed housing area with Eco World (Eco Spring, Eco Summer & Eco Tropics)

    • Dynaciate Group of Companies

      Apr 2016 - May 2017
      Health And Safety Officer

      Industry : Civil & Engineering - Oil & Project Description :PROJECT INVOLVE:- PERMENANT WORKERS ACCOMMODATION CAMP (PWAC) - Siemens JV MMC.- CAMP DESIGN COMPLEX (CDC) PHASE 2 - Toyo Engineering Cooperation Japan.- UNDERGROUND PIPING FOR COOLING WATER (UGCW) - Project construction of underground piping cooling water for Steam Cracker Complex (SCC) - Toyo Engineering Corporation Japan.  Achievement : 'The Best HSE Award' - Toyo Engineering Corporation Japan- PACKAGE 27 - Project construction of workers camp and Temporary Construction Facility (TCF) with satellite office at process area which - Tecnimont HQC. Show less

    • Wasco Energy Group of Companies

      May 2017 - May 2019
      HSEQ Manager

      Industry : Civil & EngineeringProject Description :PROJECT INVOLVE:- PIPING FABRICATION AND ERECTION WORKS FOR RAPID PROJECT PACKAGE 14Project involved in Installation, Utilities & Interconnecting (I U&I), Offsite Units for fabrication work at Ramunia Yard and erection works for pipe rack at RAPID Petronas Package 14, Pengerang.- WORKSHOP AND STORAGEWorkshop for pipeline engineering works and machinery & equipment storage which registered with DOSH at Jalan Suasa, Pasir Gudang.- GAS PIPELINE REPAIRING WORK AT LAWAS FOR SABAH SARAWAK GAS PIPELINE PROJECT (SSGP)Rescued project on the burst gas pipeline at Lawas, Sarawak.- SUNGAI LAYAU GAS PIPELINE REPLACEMENT WORK AT PENGERANG GAS PIPELINE PROJECT (PGPP)Rescued project on replacing defect gas pipeline at Sungai Layau river. Report to Petronas Gas Berhad (PGB) as PMT of the project. Involved major in engineering and construction works inside the reserved forest, FELDA and FELCRA estate.- REMAINING WORK FOR PENGERANG GAS PIPELINE PROJECT (REINITE) PACKAGE BExecution of PGPP remaining work at 9 gas pipeline metering station along 72 km pipeline from Ulu Tiram to RAPID Petronas and Pengerang Terminal 2 (RGT2).➢Achievement : Focused Recognition Award - Petronas Gas Berhad Show less

    • China Communications Construction Co., Ltd.

      Nov 2019 - Dec 2020
      Safety Officer

      Industry : Civil & EngineeringProject Description :➢Construction of East Coast Rail Link (ECRL) for Section 4, Dungun Terengganu along 75 km from Marang to Kerteh.➢Constructed risk assessment for tunneling work, working on bridge, working near water, pipeline work, construction of flyover etc. with Project Engineer.➢Arranged internal audit for Department, refer to project implementation plan➢Planned Emergency Response Exercise with Dungun Authority such as BOMBA, KKM, and JPAM to complete Bukit Bauk Tunnel Tier 2 Drill. Show less

    • Mehwish A & S Sdn Bhd

      Jan 2021 - May 2021
      Business Development Manager
    • Misi Setia Oil & Gas (MSOG) Sdn Bhd

      Jun 2021 - Sept 2021
      Safety Officer

      Industry : Engineering Oil & GasProject Description :➢Shell Pasir Gudang Installation (PGI) terminal.➢Shutdown for pipe / valve / pump replacement and civil work.➢In charged in HSE DPR, WPR, Monthly Report and Wekkly BBSO Analysis.➢Developed HSSE Program and Campaign.➢Coordinated IOGP Training, Assessment and constructed Training Need Analysis (TNA).➢Involved in HSSE Capability Assessment (HCA) Audit.➢Developed Covid-19 Management Plan.

    • Sapura Energy Berhad

      Aug 2022 - Jan 2023
      Safety Officer

      Industry : Engineering Oil & GasProject Description :Transportation And Installation (T&I) Brunei Shell Petroleum (BSP) for Salman and PRP7 Project at Brunei➢Support PMT for HSE procedure preparation at HQ a month before signed on vessel.➢Signed on Sapura 1200 on September 2022.➢Involved in T&I (installation of rigid pipeline, flexible pipeline and umbilical pipeline) and structure (installation of jacket, topside and module). Riser installation at Champion 7 platform.Vessel Hand Over Preparation at Johor Anchorage and Johor Port➢Signed on Sapura 3000 on July 2022Vessel Dry Dock at Malaysia Marine And Heavy Engineering Holdings Berhad➢Signed on Sapura 3500 on April 2022Petronas Carigali Sdn Bhd (PCSB) Bayan Gas Redevelopment Phase 2 Project at Bintulu, Sarawak➢Signed on Sapura 1200 on September 2021.➢Installation of 20” gas pipeline along 20 km with heavy lift pipe lay vessel.➢Absorb to Marine Crew after project completion (Marine Safety Officer) for Sapura 1200 for Lifting Gear Electromagnetic Test (EMEG), ABS audit and ISO 45001 & ISO 14001 audit surveillance. Show less

    • Vision One Sdn Bhd

      Mar 2023 - Jun 2023
      Safety Officer

      FPSO – Bunga Kertas Demobilization Project for FPSO Ventures and Petronas Carigali Sdn Bhd➢Established HSE Procedure for Project.➢Signed-on Petra Galaxy at Kemaman Supply Base, Malaysia as Safety Officer.➢Scope of project involving flushing hydrocarbon line, purging & preservation of pipeline during shutdown of platform and FPSO

    • Sapura Energy Berhad

      Jun 2023 - Jun 2024
      Senior Safety Officer

      Industry : Engineering Oil & GasProject Description :Transportation And Installation (T&I) Of Offshore Facilities Integrated Bekok Oil Project➢Signed on Sapura 1200 on Mar 2024. Involved in installation of 16” 7.5 km subsea pipelay and riser installation from Tiong-A Platform to Bekok-A Platform.➢Sign on Keyfield Grace on May 2024. Involved in pre-commissioning for Integrated Bekok Oil Project.Industry : Engineering Oil & GasProject Description :Transportation And Installation (T&I) Kasawari Gas Development Project➢Signed on Sapura 1200 on May 2023. Involved in installation of 28” 81 km subsea pipelay and riser installation from KSCPP to E11RAA platform for T&I.➢Signed on Ena Habitat on Dec 2023. Involved in pre-commissioning from KSCPP to E11RAA platform. Show less

  • Licenses & Certifications

    • Working At Height Competency Course

      SATC Training and Construction Services
      Apr 2014
    • Oil and Gas Safety Passport

      NIOSH Certification Sdn Bhd
      Jun 2021
    • Green Book SHO

      NIOSH Certification Sdn Bhd
      May 2021
    • OSHMS ISO 45001:2018 Lead Auditor

      Bureau Veritas Group
      Mar 2021
    • Train The Trainer

      NIOSH Certification Sdn Bhd
      Dec 2020
    • Basic Offshore Safety Induction and Emergency Training

      OPITO
      Jan 2021
    • Authorized Gas Tester And Entry Supervisor

      NIOSH Certification Sdn Bhd
      Feb 2022
  • Honors & Awards

    • Awarded to Mohd Kamarul Ariffin Abd Hadi
      Focus Recognition Award Petronas Gas Berhad Oct 2018 I was promoted as HSEQ Manager on 2018 after the completion of Sungai Layau Gas Pipeline River Crossing Project with flying colors. The project was completed ahead of plan in excellent safe man-hours without LTI, where 'Focused Recognition' awarded by the client, Petronas Gas Berhad (PGB) on the contribution.
    • Awarded to Mohd Kamarul Ariffin Abd Hadi
      BEST HSE Toyo Engineering Japan Corporation Jan 2017 The title of 'BEST HSE' awarded by the client, Toyo Engineering Japan Corporation (TEC) on the completion of CDC Phase 1 project at RAPID Petronas, Pengerang with excellent man hours without LTI and lead the event of '600 DAYS WITHOUT LTI' with all the TEC subcontractor.
    • Awarded to Mohd Kamarul Ariffin Abd Hadi
      Silver Winner on Quality Project Competition General Manager Dec 2012 Silver Winner in Quality Project Competition during Quality Day, launched by the client (Hewlett Packard). According to the project, our team synchronizing the thermal cure operation during speed up the module, at the same time maintained the quality of the product (printer cartridge) and in safe manner for the operator with no any product failure.