Nur Hossain, Ph.D., P.E.

Nur Hossain, Ph.D., P.E.

Engineer Intern

Followers of Nur Hossain, Ph.D., P.E.673 followers
location of Nur Hossain, Ph.D., P.E.Denver Metropolitan Area

Connect with Nur Hossain, Ph.D., P.E. to Send Message

Connect

Connect with Nur Hossain, Ph.D., P.E. to Send Message

Connect
  • Timeline

  • About me

    President at GEOCAL

  • Education

    • University of Oklahoma

      2014 - 2017
      Doctor of Philosophy - PhD Civil/Geotechnical Engineering 4.0
    • Bangladesh University of Engineering and Technology

      2002 - 2007
      BS Civil Engineering

      Activities and Societies: Civil Engineering Students Association, Rag Committee 2007 • Chief Organizer of the graduation ceremony for the 2007 BUET graduating class (810 graduates)• Chief Organizer of BUET “Civil Engineering Day” in 2005 and 2006

    • University of Oklahoma – Gallogly College of Engineering

      2008 - 2010
      M.S. Civil (Geotechnical) Engineering 4.0

      Activities and Societies: Graduate Student Senate • Graduate Student Senator, School of Civil Engineering and Environmental Science, OU (from 07/2009- 08/2010) • Proctor, FE Exam (October, 2009; April and October, 2010)

  • Experience

    • Concord Real Estate & Developments Ltd.

      Jan 2006 - Apr 2006
      Engineer Intern

      • Monitored and supervised Reinforced Cement Concrete Slab Casting, Pre-stressed Concrete Pile driving and Plumbing of two 16-storied buildings. Supervised a total of 30 workers.

    • HB Consultants Ltd.

      Jul 2007 - Jul 2008
      Junior Executive

      • Worked in close collaboration with Donor Agency’s (World Bank, Asian Development Bank, USAID, DFID) on Civil and Geotechnical Projects.• Prepared Expression of Interest, Request for Proposals for the Donor funded projects

    • The University of Oklahoma, Norman, OK

      Aug 2008 - Aug 2010
      Graduate Resaerch Assistant

      Field Performance Monitoring and Modeling of Instrumented Pavement on I-35 in McClain County’, Oklahoma Department of Transportation, OK: The instrumented 1000 feet long pavement section is on the right lane of the two-lane I-35 southbound (towards Dallas, Texas) with a total fund about US $287,961.• Performed laboratory and field tests (APA rut, Modulus of Resilience, Fatigue, Compaction of specimens, density measurement of specimens, FWD, crack mapping, Field rut with Face Dipstick®) for the project.• Developed strategy and analytical models to predict pavement performance and failure.• Coordinated laboratory tests with NCAT and SEM Materials.• Supervised one senior undergraduate student in laboratory tests.• Prepared 15 monthly and 2 annual project progress reports.• Presented a poster titled “Field and Laboratory Performance of Flexible Pavement Section on I-35” in the 2009 ODOT-OTC Research Day Show less

    • Midwest Engineering & Testing Corporation

      Aug 2010 - May 2011
      Staff Engineer

      Major Projects he has worked in are as follows:• Indian Nation Turnpike, Oklahoma Turnpike Authority, McAlester, OK• Seven-storied Hotel Building, Oklahoma City, OK• Schools, Various Locations, OK• Forensic Investigation in McDonald’s in Owasso, OK• Waste-Water Treatment Plant, Guthrie, OK• Drilled Pier Observation & Foundation Excavation, Various Locations, OK

    • Professional Service Industries, Inc. (PSI)

      May 2011 - Feb 2015
      Project Manager, Geotechnical Services

      Responsible for geotechnical investigation, analysis and report preparation. His responsibilities include subsurface investigation, analysis and design, project management, business development etc. His expertise includes foundation analysis and design (shallow foundation, post-tension slab, drilled pier, auger-cast piles, geopiers®, rammed aggregate piers, stone columns, helical piles), site specific seismic hazard analysis, boring log preparation, slope stability analyses, seepage analyses, ground improvement, liquefaction analysis, retaining wall design, pile load test, flat plate dilatometer test, soil stabilization, pavement design etc. Some of the major projects he has been involved in:• 345 KV Transmission Line, Woodward to Hitchland, Oklahoma Gas and Electric (OG&E), OK• I-35/I-240 Interchange Re-alignment, Oklahoma City, OK• Single Point Urban Interchange (SPUI), I-35 & Main Street, Norman, OK• Phase III, Atoka Dam, City of Oklahoma City, Oklahoma Water Utilities Trust, OK• Retaining Wall, Widening of State Highway 152, Binger, Caddo County, OK• Five Span Bridge, Bridge No: CIRB-161C (215) RB, Pittsburg County, OK• Sound Barrier Wall Structure “K”, I-44 Widening Project, Tulsa, OK• Grain Bins, Valley View Agri-Systems, Port 33 Facility, Catoosa, OK• The Edge at Midtown Apartment Complex, Oklahoma City, OK• Numerous Wal-Mart, Sams Club, Dollar General, Schools, Gas Stations in OK and KS• US-277 Pedological Soil Survey, State Job No. 21717(04), Comanche County, OK• FedEx Facility in Tulsa Airport, OK Show less

    • Kleinfelder

      Feb 2015 - Nov 2017
      Project/Office Manager

      - Started the Greater Oklahoma City operation for Kleinfelder.- Responsible for business development, client management, revenue generation, staff management, and project management.- Typical project management operations include overall coordination, work breakdown, report review and delivery within the allocated budget and time.Transportation SectorODOT & OTAInvolved as the project manager for overall geotechnical investigations and supervision of the projects. The geotechnical tasks of the OTA projects typically include subsurface investigation for pavements, bridge, retaining wall, embankments and cut sections. Typical field investigation involves collecting soil and rock samples, Falling Weight Deflector Testing, Dilatometer testing, Refraction Microtremor (ReMi) testing etc. Typical laboratory testing include soil classifications, triaxial tests, consolidation tests, standard proctor and resilient modulus tests, pH, resistivity and soluble sulfate content tests etc. Typical geotechnical analyses include pavement design, foundation design using AASHTO LRFD method for bridge and retaining walls, slope stability and settlement analyses for embankments, steady state seepage analyses, and determination of rock rippability for cut sections etc. Typical geotechnical analyses include pavement design, foundation design for bridge and retaining walls, slope stability and settlement analyses for embankments, determination of rock rippability for cut sections etc.Energy SectorInvolved as the project manager for various gasoline storage tanks and pipeline construction using HDD (Horizontal Directional Drilling) for Energy companies like Magellan and Coffeyville Resources. Geotechnical investigation includes data collection using Dilatometer, SPT, rock coring etc. Geotechnical recommendations included ring type foundation, strengthening the subgrade with a rammed aggregate system such as Geopier®, stone column etc. Show less

    • GEOCAL

      Nov 2017 - now
      • President

        Mar 2019 - now
      • Chief Engineer

        Nov 2017 - Mar 2019
  • Licenses & Certifications

    • Professional Engineer (PE)

      Wyoming Board of Professional Engineers and Professional Land Surveyors
      Apr 2021
    • Professional Engineer (PE)

      Kansas State Board of Technical Professions
      Apr 2018
    • Professional Engineer (PE)

      Oklahoma PELS Board
      Apr 2015
    • Professional Engineer

      Texas Board of Professional Engineers
      Dec 2014
    • Professional Engineer (PE)

      DORA - Colorado Department of Regulatory Agencies
      Dec 2017