Noel Macalincag

Noel Macalincag

Production Supervisor

Followers of Noel Macalincag36 followers
location of Noel MacalincagSouth Korea

Connect with Noel Macalincag to Send Message

Connect

Connect with Noel Macalincag to Send Message

Connect
  • Timeline

  • About me

    Mechanical Quality Engineer at Hyundai Engineering & Construction Co.,Ltd.

  • Education

    • St. Theresa's Academy

      1974 - 1978
      Secondary High School
    • Adamson University

      1978 - 1983
      Mechanical Engineering
  • Experience

    • Goldfeather Int’l. Corp. - Taiwanese Company

      Aug 1983 - Jun 1985
      Production Supervisor

      As a Production Supervisor for the supervision of factory workers; prepare workers daily work schedule and evaluates each worker work performance, Estimates quantity for each job order prior to production, Daily production reports and work schedule preparation

    • Corrosion Engineering Services

      Jul 1985 - May 1991
      NDT Inspector – Non-destructive Testing and Inspection

      As a NDT Inspector performed Non-destructive testing (NDT) such as PT, MPI, RT, UT, High Voltage Holiday Testing, On-Service (OSI) and Out-Service Inspection (OOSI) of pressure vessels and storage tanks, rehabilitation of power plant, petrochemical plant visual inspection of various facilities at food processing plant nationwide, Responsible for training company’s newly hired personnel on job at site, Preparation and finalization of field reports.

    • Gulf Consult - Geotechnical Division

      Jun 1991 - May 1993
      Senior Material Lab. Technician – Material Testing and Analysis

      As a Senior Material Laboratory Technician for the supervision of laboratory technicians in performing field and laboratory testing such field density test, concrete and asphalt sampling and coring, complete testing on soil such as sieve analysis, proctor, L. A. Abrasion test, C. B. R. according to ARAMCO and SCECO standards. Responsible for training company’s newly hired personnel on job at site. Performs calibration of compressive machine, marshall apparatus and batching plant, Finalization of field and laboratory reports.Project involved:ARAMCO Oilfields and SCECO Power Station Show less

    • MERALCO Industrial Engineering and Services Corp. (MIESCOR)

      Jul 1993 - Jun 1995
      Senior Quality Control Inspector – Inspection and Testing for all Piping and Pipelines

      As Senior QC Inspector (Piping/Welding) assigned at Bauang Private Power Corp. (B.P.P.C.) located at Bauang, La Union, Philippines. Worked as a QC Inspector on welding inspection and supervise NDT Technician for Non-destructive test such as visual inspection, penetrant and radiographic testing of power plant piping, submarine (Bunker fuel oil) pipelines and erection of water softener and crude oil tanks.Project involved:215 MW Bauang Private Power Corp. Bauang, La Union

    • Industrial Inspection International, Inc.

      Nov 1995 - Jun 1996
      Third Party Inspector – Construction and Erection of Storage Tank / Piping Installation

      As a Third Party Inspector (TPI) assigned at Petron Aramco at Petron Refinery and Depot located nationwide for the fabrication and erection of Spherical, Fixed and Floating Oil Storage Tanks and pipelines.Projects involved:Petron Aramco Refinery and Depot located nationwide.

    • Hyundai Engineering & Construction Co.,Ltd.

      Sept 1996 - Oct 2002
      QA/QC Engineer - Mechanical/Piping

      As a QA/QC Mechanical/Piping Engineer responsible for Review specification, drawings, referenced standards, codes, procedures and Quality documents such as WPS & PQR, ITP, etc. as per project requirements., Witness Factory Acceptance Test (FAT), Conduct welder's /operator qualification test, Check / witness equipment (Mechanical Packaged Equipment) receiving inspection, coordination with client representative, subcontractor supervisors and engineers, Check / witness necessary inspection as per project specification such as visual, dimensional, radiographic test, hydrostatic test, pump alignment check, pre-commissioning / commissioning of all mechanical equipment, etc., Involved in the final walk-about inspection prior to hydro-test, Responsible for punch-list close-out, maintain record and submit weekly reports in behalf of our consultant/Client, Provide recommendation, suggestion and advise to take corrective action to keep on the schedule. Assists commissioning team for Pre-commissioning / commissioning work up to start-up till hand-over to client.Projects involved:400MW Combined Cycle Power Plant and Repowering of Jebel Ali and Desalination Station ‘D’ Phase II Project Desalination Plant. Jebel Ali Power Plant Complex, Dubai U.A.E.December 16, 1999 to October 10, 2002Construction of 6 Units Gas Turbine Power Plant and 3 Unit Storage Tank (SCECO)Qaseem, Saudi ArabiaAug. 30, 1998 to December 15, 1999Construction of Recycling Plant, 140 Km Cross-Country Pipeline and LNG Storage tankDukhan Site, State of QatarSept. 20, 1996 to May 28, 1998 Show less

    • Malaysia Marine and Heavy Engineering Sdn. Bhd. (MMHE)

      Jul 2005 - Jun 2013
      Lead Mechanical/HVAC Engineer

      As a Package Engineer responsible for Technical Bid Evaluation and review vendor documents / drawings including Vendor Quality Documents, Progress and Fabrication/Production Schedule for all Mechanical Equipment (Rotating and Static) including piping fire & safety and HVAC, Witness Factory Acceptance Test (FAT) for all packaged equipment and pressure vessels, Raised Site Technical Query (STQ) when deviation / discrepancies arises related to project design specs including quality issues during the actual execution of the work, Responsible for the Review of Project Design Specification, Project Quality Manual, Client drawings / Quality documents,  Final As-built drawings / documents verification to ensure that the equipment / materials were properly installed as per final As-built drawings. Material Take-off (MTO) of Mechanical Equipment, piping and HVAC, Preparation of Material Requisition (MR),Generate shop (Isometric and Support Details) drawings for fabrication, Preparation of Equipment Seating Details for the actual seating and location of equipment, Weight Control Report for Mechanical Equipment prior to load-out, Review / endorsement of Purchase Approval, Prepare weekly report covering work accomplishment and the general attitude of the contractor toward work and keep all pertinent records to the job in behalf of our consultant/client.Project involved:Gumusut Kakap Project – Hull (SHELL New Orleans) and Topside System (TECHNIP) Kikeh FPSO External Turret Project - FPSO Kikeh-Murphy Sabah Oil Co. Ltd.Kikeh Spar Dry Tree Unit (DTU) Topsides Project - FPSO Kikeh-Murphy Sabah Oil Co. Ltd. Petrobas PRA-1 FSO Project - External Turret Mooring System Components BHPBP Stybarrow Internal Turret Project Disconnectable Internal Turret Mooring System components - FMC Technologies, Inc. / FMC SOFEC Floating SystemLedang-Anoa Development Project and Host Tie-in Works at Pulai ‘A’ - Petronas Carigali Sdn. Bhd. Show less

    • Hyundai Engineering & Construction Co.,Ltd. Head Office

      Jun 2013 - now
      Mechanical Quality Engineer

      As a Package Quality Engineer – Static Equipment / Piping responsible for the review of Vendor Quality Documents such as Inspection and Test Plan, TPI Inspection Report, WPS & PQR, NDE, PWHT, Vendor Manufacturing Inspection and Test reports and Vendor Data Book by using PPMS, PS,MAPS software, Attend Pre-Inspection Meeting in Vendor office prior to start manufacturing / production process, Witness Factory Acceptance Test (FAT) for all Packages (Static) equipment and Piping to ensure that it were manufactured and tested including review of Quality documents in accordance with the approved quality and project specification prior to delivery, Review Technical Query (TQ) when deviation / discrepancies arise related to quality issues during the actual execution of the work including NCR / Punch List close-out, Coordinate with client representative, vendor and other discipline engineers in order to rectify problems and disposed of non-conformities that arises related to quality, technical and construction issues during the stage of manufacturing.Project involved:Satah Al Razboot (SARB) Field Development Project – Package 4 EPC Work (On-going)Abu Dhabi Marine Operating Company (ADMA OPCO)Satah Al Razboot Oil field, Abu Dhabi U.A.E.RPLC Deep Conversion Project (On-going)PDVSA, Petroleos S.A.Puerto La Cruz, VenezuelaMX EPC Project – Package 1 (On-going)Hyundai Chemical Co. Ltd.Daesan, KoreaBorouge 3 XLPE Project (Completed)Abu Dhabi Polymers Co. Ltd. (Borouge)Abu Dhabi, U.A.E. Borouge 3 Utilities & Offsites (Completed)Abu Dhabi Polymers Co. Ltd. (Borouge)Abu Dhabi, U.A.E.Ma'aden Mine and Refinery Project (Completed)Saudi Arabian Mining Co.Jubail, KSA Show less

  • Licenses & Certifications

    • Work Certificates