Alexandre Mahfuz

Alexandre Mahfuz

Followers of Alexandre Mahfuz2000 followers
location of Alexandre MahfuzSão Paulo, Brazil

Connect with Alexandre Mahfuz to Send Message

Connect

Connect with Alexandre Mahfuz to Send Message

Connect
  • Timeline

  • About me

    Construction | TBM Tunnel Manager

  • Education

    • Technische Universität Ilmenau

      2005 - 2005
      Internship Trainee - Germany
    • Universidade Federal de Itajubá

      2001 - 2005
      Mechanical Engineer ENGINEERING
    • Fundação Getulio Vargas

      2008 - 2009
      MBA Project Management
    • Fundação Dom Cabral

      2023 - 2025
      Executive MBA
  • Experience

    • OEC

      Mar 2006 - Mar 2020

      Construction of a new metro line in Rio de Janeiro - Brazil, with 16km of extension (5km in TBM and 11km in NATM) and 6 (six) new stations.- Design, procurement and operation of the TBM EPB Convertible, with 11,51m of diameter, including the implement of the jobsites and facilities.- Excavation in two distinct types of soils: Rock (up to 230 MPa) and cohesionless Sand with high groundwater level. Including: Hyperbaric interventions, transition zones crossing (Rock / Sand), Submerged Breakthrough and launch of the TBM using a sealing ring.- Plan and execute geotechnical investigations and soil treatments.- Monitor subcontractor's performance according to the contractual and technical parameters.- Coordination of works with clients, third parties and other disciplines of the project, including the review of engineering design and planning.- Review contractual issues, including claims and litigations.- Final inspection of tunnels and commissioning of the electromechanical systems (Energy 22kV, Ventilation, Escalators, Elevators, Pumping Systems).- Safety: Ensure that the safety plan is implemented. Including all safety rules and regulations.- Leader of a qualified team, including different cultures and nationalities.- Tax management during the import of the equipments resulting in a reduction of rates of about 20%.- Responsible for all the logistics and assembly of the equipments (circa 3.000 tons), within one of the largest and populated urban centers in Brazil. Show less Construction of a subway station in Rio de Janeiro - Line 1. Excavation of 1.5km in Rock (up to 230 Mpa) using NATM method (Drill and Blast).- Excavation of the tunnel in Rock (up to 230 MPa), using "Drill and Blast" technology.- Assembly and commissioning of the railroad and the electromechanical systems.- Monitor subcontractor's performance according to the contractual and technical parameters.- Safety: Ensure that the safety plan is implemented. Including all safety rules and regulations. Show less Construction of a new metro line in São Paulo - Brazil, with 13 km of extension (6 km in TBM and 7 km in NATM) and 11 new stations.- Tunnel Engineer in the excavation using a Herrenknecht TBM EPB, with 9,5 meters of diameter.- Excavation mainly on a sandy clay soil, with high groundwater level.- Lead shift operation, including excavation, maintenance, grout injection, ring building.- Safety: Ensure that the safety plan is implemented. Including all safety rules and regulations Show less

      • TBM Tunnel Manager

        Aug 2010 - Mar 2020
      • Tunnel Engineer

        Dec 2007 - Jul 2010
      • TBM Site Engineer

        Mar 2006 - Nov 2007
    • SACYR

      Mar 2020 - now
      Construction / TBM Tunnel Manager

      Join Venture of Sacyr | Galvão | SA PaulistaExtension of the Line 2 of the São Paulo Metro. Including 7,3 km of tunnels in TBM and 8 new Stations.Construction manager of the project with 2 stations, 5 Ventilation shafts, 7 km of tunnel with a TBM EPB with 11,65 m of diameter.

  • Licenses & Certifications

    • Tunneling Training Program

      OEC
      Jan 2011
    • PPE - Preparation Program for Entrepreneurship

      OEC
      Jan 2014
  • Honors & Awards

    • Awarded to Alexandre Mahfuz
      Technical Innovation Project of the Year 2016 ITA - International Tunnelling Association Nov 2016