Scott Huskey

Scott Huskey

Owner/Electrician

Followers of Scott Huskey469 followers
location of Scott HuskeyMaryville, Tennessee, United States

Connect with Scott Huskey to Send Message

Connect

Connect with Scott Huskey to Send Message

Connect
  • Timeline

  • About me

    Planner/Electrical Field Engineer at Day & Zimmermann

  • Education

    • Tn electrical contractors

      2004 - 2005
      E.C. Electrical Contractors license
    • Technical school

      1995 - 1998
  • Experience

    • Patriot Electric

      Feb 2004 - Aug 2006
      Owner/Electrician

      • Met with building contractors to secure contract work• Estimated jobs• Installation of conduit from 1/2'” to 5”-EMT, PVC, IMC and Rigid• Pulling and termination of wires 18 gauge to 1000 mcm• Set and termination of switch gears, MCC and panels• Installation and testing of Fire alarm systems • Installation and termination of fiber optic cables• Met with inspectors to ensure job adhered to all electrical specifications• Provided information to customers to ensure customer satisfaction Show less

    • Atlas elec

      Jan 2005 - Jan 2007
      Electrician/ civil manager on cell towers
    • Atlas Electric

      Jan 2007 - Jan 2009
      Electrician

      • Installation of conduit from 1/2'” to 5”-EMT, PVC, IMC and Rigid• Pulling and termination of wires 18 gauge to 1000 mcm• Installation and termination of switch gears, MCC and panels• Installation and testing of fire alarm systems • Installation of telecommunication equipment and Fiber optics• Erection of communication towers • Cad Weld certification• Equipment operation certification• Climbing certification

    • Westinghouse Electric Company

      Jan 2010 - Jan 2010
      Electrical Field Engineer

      • Met with the electrical crew to review work assignments• Provided direction and technical support to the work crew• Assured that all work and safety standards were followed• Communicated any necessary information to Project Superintendent• Modified work assignments when necessary to complete projects• General supervision of project activities

    • DZ Atlantic

      Jun 2010 - Aug 2010
      Electrician

      • Security modification• Installation of new battery backup system• Installation/wiring of transformers, battery chargers• GAI-tronics modifications• Security camera and monitors upgrade

    • DZ Atlantic

      Jan 2011 - May 2011
      Electrical Field Engineer

      • CAS Relocation Project• Running control wiring on various computer systems• Pulling new standard and fiber optic cable runs• Installing new and manipulating existing cable trays• Installing new and manipulating existing 2” and 4” Rigid conduit• Terminating, training and landing cables as per procedure• Testing all cable runs as per procedure• Testing all circuits as per procedure

    • G4S

      Aug 2011 - Nov 2011
      Field Superintendant

      • Schedule Site Visits for Quality Control Assessments based on need and location• Verify that the site has accurate installation of wireless components, i.e. Cienna, Windstream, and Century Link• Provide Quality Control Assessments for each site’s wireless components• Complete Quality Control Documentation for each site evaluated• Provide feedback to the General Contractor• Arrange for site modifications when quality issues where present• Participate in weekly conference calls with management and customers throughout the US Show less

    • DZ Atlantic

      Jan 2012 - May 2012
      Electrical Department

      • ES/RPS-ESTC Project• Building work packages and organizing work schedules• Demo & Installation of new wiring on ES/RPS cabinets• Pulled new power, communication and fiber optic cables• Terminated control wiring and fiber obtic cables in cabinets per procedure• Conducted continuity testing for cabinets, valves, and penetrations• As per policies and procedures installed and removed Red Tags• Termination of cables on vertical board inside control room

    • Bechtel/ Talascend

      May 2012 - Nov 2012
      Electrical field engineer

      • EPU Project• Develop WPCN’s, CRN’s, EC’s for implementation into work packages• Verification and inspection of installation of electrical equipment and components per plant procedures• Work Package writing• Work Package closeout• Work in conjunction with QC to verify Safety Related Work• Insertion of Safety Related, Augmented Quality and Non Safety Related material into work packages • Coordination with electrical supervisors to correct interferences for installation of electrical systems and conduit routing • Work with design engineering to resolve electrical discrepancies in the field• Creating and implementing weld documents and designs per plant procedure Show less

    • Work Management Inc

      Dec 2012 - Dec 2015
      Electrical Planner/Field Engineer

      • Conduct/facilitate Preliminary, Readiness and DLMH walk-downs• Lead Preliminary walk-downs• Lead Turnover Package development• Gap Anaylasis to track completion of work orders• Interface with other supporting groups as required for turnover• Perform Preliminary walk-down to support turnover• Create deficiency logs to identify items which may impact scheduled turnover date

    • Day & Zimmermann

      Jan 2016 - now
      Lead Electrical Planner/ Field Engineer

      • Coordination with electrical supervisors to correct interferences for installation of electrical systems and conduit routing• Work with design engineering to resolve electrical discrepancies in the field• Coordinate with QA/QC for installation of safety related equipment and components • Development of FCR’s for implementation into Work Packages• Walk down Work Packages before start of work to ensure all work can be completed in a safe and timely manner• Field verification of conduit routing and cable terminations Show less

  • Licenses & Certifications

    • Tn Electrical Contractors License

  • Volunteer Experience

    • mobile home installation

      Issued by FEMA on Aug 2005
      FEMAAssociated with Scott Huskey