Onuralp Soylu

Onuralp Soylu

Trainee Engineer

Followers of Onuralp Soylu489 followers
location of Onuralp SoyluRiyadh, Saudi Arabia

Connect with Onuralp Soylu to Send Message

Connect

Connect with Onuralp Soylu to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Politechnika Lubelska

      2010 - 2011
      Erasmus Civil Engineering
    • Selçuk University / Selçuk Üniversitesi

      2006 - 2011
  • Experience

    • Tekfen Construction

      Jun 2010 - Aug 2010
      Trainee Engineer
    • Karatay Construction

      Jan 2012 - Sept 2012
      Quality Engineer
    • Mapa Group

      Oct 2012 - Dec 2016

      • Ras Al Khair – Hafar Al Batin Water Transmission System ($209.000.000) : Scope of project mainly comprises Engineering, Design, Procurement, Transportation, Construction and Commissioning of Main Pipeline (Dia; 44” and Length: 352km), 6 Branch Line, Pump Station, 7 Reservoir and Filling Stations, 7 Line Valve stations and 11 Steel Storage Tanks (2x50.000m3, 5x5.000m3, 2x500m3 and 1x300m3) throught the line. • Ras Al Khair – Riyadh Water Transmission System ($450.000.000) : Scope of project mainly comprises Engineering, Design, Procurement, Transportation, Construction and Commissioning of Main Pipeline. (72” Twin Line – 268 km Length and The design capacity is 900.000 m3/day, resulting in 19.737 m3/h per line flow rate with an operating factor of 0,95. The twin pipeline with three twin pumping stations will supply water to terminal groups. The project include 279 km Asphalt Maintenance Road parallel to the main line.• My responsibilties : Subcontractor follow-up, Preparation of progress reports daily and monthly basis, Preparation of Progress Payment Certificates for sub-contractor, Preparation of Payment Application for Contractor, Preparation of Material Approve Documents, Pipe follow-up with received reports (Shipped-Transportation-Coating-Lining-Delivered to Site-Welding). Test Results (Sub-Base Material Compaction, MC-1, Bituminous Base Coarse and Wearing Coarse Material) for Asphalted Maintenance Road follow-up. Preparation of Commissioning Documents Show less

      • Site Engineer

        Feb 2016 - Dec 2016
      • Technical Office Engineer

        Oct 2012 - Feb 2016
    • Mapa Group

      Feb 2017 - Oct 2022

      -Taif - Turubah/Ranyah/Al Khurmah Water Transmission System ($52.337.610) : 40” Pipeline – 106 km Length, 16" Pipeline - 4,9 km length and Tap-Off Stations-Arafat-Taif WTS (262.598.522$): 46 km length 60 inch dia pipeline, 2 Pumping stations and 12,5 km length 8,4 meter dia Tunnel Works. -Yanbu Madina Water Transmission System (468.000.000 $)232 KM 84/80 inch pipeline, 2 pumping stations, 6 Reservoir Stations and 4 X 170.000 m3 - 6 X 140.000 m3 - 2 X 100.000 m3 Steel Storage TankResponsibilities: Design follow-up, coordination with subcontractors and vendors, Preparation of Contract, Reporting to high management, Progress follow-up and Budget/Cost Control. Coordination with Authorities for Interface (Obstacle Points) purpose. (ARAMCO, NWC, SWCC, SEC and etc.) Show less

      • Technical Office Manager

        Jan 2018 - Oct 2022
      • Tendering Engineer

        Feb 2017 - Jan 2018
    • DKN Mühendislik İnşaat Sanayi ve Ticaret A.Ş.

      Dec 2022 - Jan 2024
      Tendering Specialist

      Awarded Projects:Ras Al Khair Riyadh WTS2 - Package B1 = 242 M$Arada-2 WTS = 270 M$

    • Esnad Contracting

      Feb 2024 - now
      Project Manager

      Ras Al Khair - Riyadh Water Transmission System Project (H&I) - Package B1 ; 205 KM, 2 X 88 inch pipeline

  • Licenses & Certifications

    • Methodologies and Applications of Project Management

      Mar 2016