Adalberto Arthur Lima

Adalberto Arthur Lima

Trainee

Followers of Adalberto Arthur Lima282 followers
location of Adalberto Arthur LimaBrasília, Federal District, Brazil

Connect with Adalberto Arthur Lima to Send Message

Connect

Connect with Adalberto Arthur Lima to Send Message

Connect
  • Timeline

  • About me

    PMI - Project Manager Installation

  • Education

    • Eastfield College

      2005 - 2008
      Associate's degree Computer Aided Design and Drafting (AAS.CADD)
    • ETEP Faculdades

      1992 - 1995
      Technician Mechanical
  • Experience

    • Ericsson

      Jul 1995 - Nov 1996
      Trainee

      • Development of layouts and assembly machines, using AutoCAD;• Support Senior Engineer in the resolution of the technical problems and improvements in production line such as: monitor of spare parts and machine maintenance;• Participation in Project planning meetings.

    • Inepar Equipamentos e Montagens S.A.

      Jan 1997 - Oct 1999
      Planner

      Brazilian company specializing in differentials in manufacturing, processing and sale of composite panels of special structures for construction, as well as the sector of transport and electricity distribution, with the production of energy and cell phone transmission towers. • Development of mobile and energy transmission tower projects;• Preparation of steel structure projects through AutoCAD.• Review of structural projects and release them to production.

    • Portion Pack - H.J. Heinz Company

      Jan 2001 - Jan 2006
      Planner

      American company manufacturer of food products such as: Ketchup, Mayonnaise and Salsas.Performance:• Development of projects and layout studies within the local regulations and standards stablished by the company;• Update and adaptation of architectural, electrical and pneumatic designs for AutoCAD.

    • Craig Roberts Associates - Architectural Lighting Design

      Feb 2006 - Nov 2009
      Junior Lighting Designer

      American company specialized in hi-end residential, resorts and retail lighting projects. It meets the renowned architectural and interior design offices (Wilson Associates), internationally recognized for high standards projects developed in Europe, Morocco, Dubai and Asia.Performance:• Coordinating all stages of lighting design using AutoCAD and Revit;• Technical report analysis of site for Project execution, the design package was divided into several stages: Lighting plans, Lighting Control plans, Elevation drawings and detailed design;• Participation on meeting with customers and suppliers, monitoring and final Project adjustments on the site.• Worked on projects: Mazagan Resort Project in Morocco and Atlantis resort in Dubai, with VIPs and Lobby suites. Show less

    • Philips Healthcare

      Jul 2010 - Jan 2016
      Project Supervisor

      Team: 03 designers in Brazil and 05 in Irvine, USA, dedicated to Brazil projects.Acting as Team Leader, monitoring the Drawing Center team units Brazil and Irvine.• Responsible for ensuring speed and quality of customer projects, in close relationship with Project Managers (during sales, installation and delivery of the equipment), Site Planners (technical visits) and Irvine.• Coordination of all technical documentation of Image System equipment’s in Philips Healthcare (global and local), such as Magnetic Resonance Imaging (MRI), Computer Tomography (CT), PET/CTs, Interventional X-rays (Hemodynamics), X-rays Analogic and Digital, Nuclear Medicine and Mammography.• Technical support to Project Managers and Site Planners in the adequacy of the technical specifications of all types of imaging equipment, including setup information and electrical analysis, according to local requirements.Performance:- Training and leading a team of specialist designers for the execution of projects in Brazil alignment to the Philips Global Project Standard, with strong operational impact; - Site feasibility analysis using the technical documentation of the equipment (PRD), Brazilian electrical codes and standard local Hospital code ANVISA RDC 50;- Idealization of a project application procedure (Lean Methodology and SharePoint System), enabling the organization and selection of all design request and synchronization with the drawings, ensuring the delivery of projects with quality and on time;- Analysis, execution and equipment position drawings review (layouts) and detailed installation project (installation manual) according to the technical information received from the Site Planner or Project Manager;- Conduct planning meetings of project developed with Brazil and Irvine team; - Preparation of monthly management production analysis reports and project volume statistics to Irvine manager, discussion of ideas, process improvements and preparing action plans. Show less

    • GE Healthcare

      Jan 2017 - now
      PMI | Site Planning Specialist

      Responsible for supporting the customer in the site preparation according to GE's imaging system equipment specifications. Acting as the primary contact between GE Healthcare and customer in all activities related to the installation of equipment.Coordinate the installation with GE team from the beginning of the customer negotiation until complete all installation process (Site feasibility, Sales, Revenue, Finance, Logistics, Services and Application training), ensuring that the process goes smoothly within EHS GE safety standards.Ensuring that customer expectations and equipment installation schedules goes on time as planned.Manage installation unforeseen issues and schedule changes with the GE manager thru escalation to guarantee the least impact on customer satisfaction and ensure company targets. Show less

  • Licenses & Certifications

    • Lean Foundation Certificate

      Philips Healthcare
      Jun 2014
    • ICommunicate & iBrand

      GE HealthCare
      May 2019
    • PMI DI Advanced

      GE HealthCare
      Mar 2018
    • MRI HAVC - Technical Training

      Mecalor
      Jul 2022
    • PMI MR Expert Course

      GE HealthCare
      Feb 2019
    • Introduction to Magnetic Shielding and Safety in Quench piping.

      MR In Site Healthcare Solutions
      Jul 2022
    • Customer Persuation & Negotiation

      GE HealthCare
      May 2019