Musab Abbas PMP®, CCP®  , SP®, RMP®, Approved Bechtel And USAC

Musab Abbas PMP®, CCP® , SP®, RMP®, Approved Bechtel And USAC

Site & Technical Office Engineer

Followers of Musab Abbas PMP®, CCP®  , SP®, RMP®, Approved Bechtel And USAC3000 followers
location of Musab Abbas PMP®, CCP®  , SP®, RMP®, Approved Bechtel And USACRiyadh, Saudi Arabia

Connect with Musab Abbas PMP®, CCP® , SP®, RMP®, Approved Bechtel And USAC to Send Message

Connect

Connect with Musab Abbas PMP®, CCP® , SP®, RMP®, Approved Bechtel And USAC to Send Message

Connect
  • Timeline

  • About me

    Sr. Project Manager at Tatweer Buildings Company

  • Education

    • Sudan University of Science and Technology

      2006 - 2011
      Bachelor of Engineering (B.Eng.) civil engineering Building/Construction Site Management/Manager
  • Experience

    • ADA International for Roads and Bridges (Sudan).

      Nov 2011 - Oct 2012
      Site & Technical Office Engineer

      The project is located in Sudan, Khartoum State, Omdurman city, Nile Avenue project. Scope of the project consists of Nine Kilo meters (9.0 km) Asphalt Road with 6 Pipe Culvert and relevant works. according to (Sudanese Roads and Bridges Standards), The designer and the technical consultant is New Tech for ConsultancyI worked with Subcontractor as Site & Technical Office Engineer Responsible for 1 Pipe Culvert :-I worked with Subcontractor as Site Engineer, Responsible for 1 Pipe Culvert :-• Update the activities of the project in daily basis.• Assisting the Planning Engineer in the Revised Schedule.• Established Payments due to as-build drawing and make the final payment to the project• Quality Assurance in the site (Steel, Concrete, Testing….)• Check the sequence and duration of the activities. • Coordination between electro mechanic and civil activities.• Doing the work as specified in the specifications and shop drawing• Day-by-day works on the site project. Show less

    • Lahmeyer International

      Feb 2013 - Mar 2015
      Site Engineer

      The location of the project in the eastern of Sudan, Gaddarif state, 550 km far from Khartoum city. The scope of the project (Hydropower Project-Dams Complex 1milliom concrete cubic meters) consisting of two Spillways; Power house generates 320MW, two earths Dams, Gaddarif water supply outlet with value of 1.2 Billion Dollars. The main Contractor is CWE CTGC joint venture, and the designer and consultant is Lahmeyer International GmbH. I’m working with the consultancy company in the concrete department as Junior Engineer Casting about 600,000 cubic meters responsible for:- • Quality Assurance in the site (Steel, Concrete, Testing….)• Check the sequence and duration of the activities. • Coordination between electro mechanic and civil activities.• Doing the work as specified in the specifications and shop drawing• Day-by-day works on the site project. Show less

    • Dams Implementation Unit وحدة تنفيذ السدود

      Mar 2015 - Aug 2015
      Contract and Cost Engineer

      The location of the project in the eastern of Sudan, Gaddarif state, 550 km far from Khartoum city. The scope of the project (Hydropower Project-Dams Complex) consisting of two Spillways; Power house generates 320MW, two earths Dams, Gaddarif water supply outlet with value of 1.2 Billion Dollars. The main Contractor is CWE CTGC joint venture, and the designer and consultant is Lahmeyer International GmbH. Am working with the Employer company in the Contract and Cost Department as a Junior Contract Engineer doing the following: • Ensure complains with relevant legislation.• Review and assist in prepare financial statement (IPAs invoices) for contractor and consultant.• Review and approval of financial statement (IPCs) for contractor.• Updated the weekly and monthly report For Head Quarter & Funding Agency.• Adjust Price due to inflation rate for long term procurement materials.• Analysis the Variation Order.• Daily follow up of the contractual issues and cost record corresponding (day works, variation orders…).• Assist in review and check of claim of Extension of Time has been submitted from contractor regarding Cost and Time. . Show less

    • Zaid Alhussain & Brothers Group

      Aug 2015 - Apr 2017
      Planning & Cost Engineer

      Projects:- ▪ Rokoun 4, location on Dammam, 9 Buildings with total building area =34,870 m2. ▪ Rokoun 5, location on Riyadh, 4 Building with total building area=32,000 m2. ▪ Rokoun 6, location on Riyadh, 22 Villa with total building area= 24,000 m2. ▪ ISRA Mosque, location on Dammam, with total building area=2000 m2 I’m working with the Real-estate as a Planning Engineer responsible for: • Intuition the project with a project charter.• Develop the schedule with full resource program and completed scope.• Develop the Budget for direct cost for each activity and indirect (Overhead) cost for all project (Admin Expenses, Manpower Expenses, Capital Expenses and Management Expenses).• Monitor site progress against Scope, Schedule and cost Baseline CPI, SPI, CV, SV.• Tracking the day to day work.• Updated the weekly and monthly report.• Implement earned value techniques and earned schedule.• Predict completion dates, Budget estimate at completion and prepare lookahead reports.• Prepare of Progress Reports and Status Report.• Issuing any changes to the baseline (Cost & Time) and conduct company procedure.• Estimating and developing the accepting changes. Show less

    • AL-AYUNI Investment and Contracting Company

      Apr 2017 - Apr 2021
      Senior Planning and Cost Engineer

      Working in collection of projects with total value of 2.3 billion SAR.as a Planning and cost Engineer responsible for: • Checking and making a revision for budget level Zero before uploading it on the system.• Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded. • Prepare Biweekly Execution (Earn Value) vs. IPC's report (submittal, approval and cash collected).• Prepare PMR (Project Management Review) for all the project as a monthly report.• Assisting on creating the Budget and/or ETC for direct cost for each activity and indirect (Overhead) cost for all project and part of the overhead expenses.• Prepare complete one baseline with amount with Royal Commissioning (Bechtel) prepare with team a complete Baseline with USAC.• Monitor site progress against Scope, Schedule and cost Baseline CPI, SPI, CV, SV.• Complete a 4 EOT (Assist on 3 and prepare ONE) claims with Royal Commissioning (Bechtel).• Giving a technical support for the planners on the site.• Tracking, allocating and recording the Actual Cost through the software ERP system.• Predict completion dates, Budget estimate at completion and prepare look ahead reports.• Checking reliability of the data from the projects which was reflected automatically through the dashboard in the software (Clarity). .. • Give a Clarity (Project Management Software) training for the new employee in the projects.• Working and responsible of Clarity (project management software).• Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that expenditures are kept within the project budget. Show less

    • Tatweer Buildings Company

      Oct 2022 - now
      Sr. Project Manager (Control Department)
  • Licenses & Certifications

    • PMI-Risk Management Professional

      Project Management Institute
      May 2016
    • Certified Cost Professional (CCP)

      AACE International
      Jul 2018
      View certificate certificate
    • PMP

      Project Management Institute
      Jan 2015
    • PMI-SP

      Project Management Institute
      Nov 2015
  • Volunteer Experience

    • Trainer

      Issued by جمعية المهندسين السودانيين بالسعوديه on Oct 2016
      جمعية المهندسين السودانيين بالسعوديهAssociated with Musab Abbas PMP®, CCP® , SP®, RMP®, Approved Bechtel And USAC