Alejandro Fernandez

Alejandro Fernandez

ADMINISTRATIVE ASSISTANCE

Followers of Alejandro Fernandez601 followers
location of Alejandro FernandezSpain

Connect with Alejandro Fernandez to Send Message

Connect

Connect with Alejandro Fernandez to Send Message

Connect
  • Timeline

  • About me

    Jefe de Obra

  • Education

    • LA INMACULADA SCHOOL

      -
      High School Diploma
    • Universidad Politécnica de Madrid

      -
      Bachelor Civil Engineering
  • Experience

    • Carl Zeiss Vision

      Jun 2007 - Sept 2007
      ADMINISTRATIVE ASSISTANCE

      Administrative works of Marketing in summer.Data collection, creation and exhibition of market studies in the Department of Marketing.

    • AFS.PADEL

      Feb 2010 - Jul 2014
      Paddle teacher

      Created and coordinated activities for children 4-12 years old.Created and coordinated Paddle Tournaments.Consult and sale of tennis material.

    • Farrans Construction

      Sept 2014 - Oct 2019

      Section engineer of North side access of bridge at New Wear Crossing in Sunderland. In charge of the ending of Wessington Way Road and the construction of new underpass road at Hylton Park Road. Involvement: · Work planning.· Coordination of new engineers. · Setting out planning. · Commercial awareness including take offs from drawings in relation to contract specification. · Sending out material enquiries, monitoring of plant and labor resources on site. · Reviewing drawings for construction. · Meetings with client to discuss changes on the design and potential problems. · Quality procedures with client to sign off work done. Show less Working as Site Engineer in Sunderland (Newcastle), in the construction of the New Wear Crossing project. Project value of £ 117.6 M to build a new road bridge over the River Wear which will be a three span cable-stayed bridge with an A-frame pylon rising to 115m in height. It will have two lanes of traffic in both directions, plus dedicated cycle ways and footpaths along its full length. Some duties include setting out, assisting the section engineer and section manager, site surveying and control and supervision of subcontractors, managing health and safety, quality assurance and programme of ongoing works through to completion. Involvement:Commercial awareness including take offs from drawings in relation to contract specification. Sending out material enquiries, monitoring of plant and labor resources on site. Supervision Utility diversions of Gas (NGN), Water (Seymour), Power (NPG), Virgin Media (McNicholas), Bt) and ducting services. Managing interface of earthworks, piling and concrete subcontractors.Drainage works: Construction of new lines of drainage and manholes with more than 60 Manholes, Gullies and 3 km Pipe. Involved in drainage design change to incorporate CDK (Combine Drainage Kerbs).South abutment: Supervision of first phase of reinforced concrete works.Launch Platform. Supervision of launch platform with 6 reinforced concrete launch pads where the bridge was assembled prior to pylon erection. Structural works: Pile caps, Reinforcement earth platform for south abutment and soil faced reinforced slope wall at bridge pier with TENSAR . Reinforced concrete works.Surveying knowledge including use of following surveying equipment (Total Station, GPS, Grade Laser level, Pipe Laser, Dumpy Level). Show less

      • Section Engineer

        Sept 2017 - Oct 2019
      • Site Engineer

        Jun 2015 - Mar 2018
      • METER SURVEY & QA TECHNICIAN, FARRANS

        Sept 2014 - May 2015
    • Siac Construction Ltd

      Mar 2018 - Oct 2019
      Senior Engineer

      Structural Engineer at Siac-Colas JV in charge of the construction of three permanent bridges and one temporary Bailey Bridge crossing the Liffey river. Assisting the Site agent and supervising the work on site. Involvement: · Work program.· Coordination of engineers. · Setting out program · Commercial awareness including take offs from drawings in relation to contract specification. · Sending out material enquiries, monitoring of plant and labor resources on site. · Reviewing drawings for construction. · Meetings with client to discuss changes on the design and potential problems. · Quality procedures with client. Show less

    • M&N Groundworks Ltd

      Oct 2019 - Aug 2020
      Quantity Surveyor
    • ITERCON

      Aug 2020 - Nov 2022
      Site Agent
    • Seranco, s.a.

      Nov 2022 - now
      Jefe de obra
  • Licenses & Certifications

    • Manual Handling 2014

    • Firts Aid at Work

      Nov 2015
    • CAT4+ & Genny

      Jul 2015
    • Fire Warden

      Jul 2015
    • Street Works Supervisor

      Nov 2015