Mohammed Alshaikh (PMP, CIPP/CIPM)

Mohammed Alshaikh (PMP, CIPP/CIPM)

Inspection engineer

Followers of Mohammed Alshaikh (PMP, CIPP/CIPM)811 followers
location of Mohammed Alshaikh (PMP, CIPP/CIPM)Al Khobar, Eastern, Saudi Arabia

Connect with Mohammed Alshaikh (PMP, CIPP/CIPM) to Send Message

Connect

Connect with Mohammed Alshaikh (PMP, CIPP/CIPM) to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Philips

  • Education

    • King faisal University

      2004 - 2009
      Bachelor of Science (BS) Architecture Good
  • Experience

    • Abdullah A.M. AlKhodari Sons Co,

      Nov 2009 - Jul 2010
      Inspection engineer

      Project : Alkharsanya and Karan Plant's Client :Saudi ARAMCO through HYUNDAIDuties and Responsibilities - Inspection According to ARAMCO engineering standards and check list (SAES's) (SACI,s) specifically in Foundation work starting with : a- Excavation: [ SAIC-A-1004,1005].. b- Formworks: checking the size's of each mold as per drawing [SAIC-Q-1012]. c- Steel fixing and anchor bolt setting: checking the thickness, quantity and size of the coated reinforcing steel for footing and pedestal as per drawing. d- Concreting: pump and concrete checking [SAIC-Q-1004, 1006]. e- Curing: watering the foundation. f- Concrete Coatings: two layers of bitumen [SAIC-H-1003, 1004]. g- Backfilling: selected fill material test, moisture and strength test every (20 cm) layer of backfilling material; - Preparing check lists for inspection ( SAIC's ) relevant to the type of work. - Reviewing, adding daily schedule for (QC) civil inspection. Show less

    • Saudi Oger Ltd.

      Sept 2010 - Dec 2010
      Architect Engineer

      Project : King Abdullaziz Centre For World Culture ( ithra )Client : Saudi ARAMCODuties and Responsibilities - Designing support facilities like carpentry, vehicle workshops, as per relevant Saudi Aramco Engineering Standards. - Working as Site Engineer to supervise and ensure that the design drawings are followed. - Perform Inspection and follow up during construction in compliance with the planned requirements. Show less

    • Applus Velosi Limited

      Jan 2011 - Apr 2013
      QA Group Leader

      Project: king abdullah petroleum studies and research center (KAPSARC)Client : Saudi ARAMCODuties and Responsibilities - Inspection of Civil and Architectural Works at (KAPSARC) Project, including (backfill, formwork, steel rebar, concreting, curing, finishing). - Reviewing: Documents, specifications, IFC Drawings and Details of (KAPSARC) Project specifically in Civil and Architectural work. - Issuing new check lists for new kind of work, especially in architectural scope using international standards (ACI, BSI...) and project specifications. - Supervision and follow-up the contractor's through work schedule. - RFI / LBE / NCR Process. Show less

    • Philips

      Apr 2013 - now

      Al-Khobar Governorate, Saudi ArabiaExecuting Projects from Planning stage until closing and handover to the customers.Executing Projects for Philips Healthcare requires preparing a special plan with a timeline for each kind of equipment in regard with Pre-installation work (Civil Work), Installation, setting to Work / commissioning and Training. All that is done in accordance with PMI Method of Managing projects.accomplished projects up to date:(2016)ARAMCO Research& Development Center ,Dhahran – CT Scan projectALMANA General Hospitals, Khobar & Dammam (Multi-modality) – Two CT Scan and Two Cathlab.ARAMCO Jhon Hopkins Hospital, Dhahran (Multi-modality) – Cath lab & Mobile X-Rays.(2017)Al Mouwasat Hospital, Jubail – Cath lab project.Al Mouwasat Hospital, Madinah – Digital X-ray project.Al Mouwasat Hospital, Qatif and Riyadh – Mobile C-arm projectAl Ahsa General Hospital, Al Ahsa – (Multi-modality) Cath lab, Digital X-Ray and Mammography project.(2018)Al Mouwasat Hospital, Khobar (Multi-modality) MRI, CT, Digital X-ray, Cath lab, Fluoroscopy and Mobile X-ray’s.Royal Commission Hospital, Jubail – Cath lab projectImam Abdulrahman bin Faisal Hospital, Dhahran – Mobile C-ArmALMANA General Hospital, DMM & Jubail – CT Scan project.Khafji National Hospital, Khafji – MRI project.Khafji Joint Operation Hospital, Khafji – MRI project.King Abdulaziz Hospital, Al Ahsa – MRI project.Health Clinic, Khobar - (Multi-modality) Cath lab, Mobile X-ray and Ultrasound project.(2019)Al Mouwasat Hospital, DMM – Cathlab projectKing Salman North west Armed force Hospital, Tabuk - (Multi-modality) MRI, CT, Ultrasounds & Cathlab.ALMANA General Hospital, Khobar – Two MRI project.King Fahd University Hospital, Khobar – Two Cath lab Suite. Show less Accomplished Project:(2013)Prince Fahd Bin Sultan Hospital, Tabuk – Mammography projectDammam Central Hospital, Dammam – Cath lab projectQatif Central Hospital, Qatif – Cathlab & CT Scanner projectMouwasat Hospital, Dammam – Cath lab projectHail General Hospital, Hail – Mobile C-Arm projectSALAMAT Hospital, Hail – Mobile C-Arm project(2014)Maternity & children Hospital, Dammam – Cath lab projectAlAmal complex for Mental Health, Dammam – Digital X-Ray projectHanakia General Hospital, Al Henakiyah – Digital X-Ray projectAl Hait General Hospital, Al Hait – Fluoroscopy projectAn Nabhaniya General Hospital, An Nabhaniya - Fluoroscopy projectKing Fahad Military City Hospital, Dhahran – Cath lab projectRoyal Commission Hospital, Jubail – Ultrasound project(2015)ALMANA General Hospital, Jubail & Al Ahsa – Two MRI projectALMANA General Hospital, Jubail & Al Ahsa – Two CT Scan projectAl Rawdha General Hospital, Dammam – Cathlab projectKhafji National Hospital, Khafji – (Multi-modality) CT Scan, Digital X-Ray & fluoroscopy project Show less

      • Project Manager

        Jun 2016 - now
      • Project Officer

        Apr 2013 - Jun 2016
  • Licenses & Certifications

    • Certified international procurement Professional/Manager

      IPSCMI
      May 2022
    • Project Management Professional

      Project Management Institute
      Jan 2016