Mohammed Ibrahim

Mohammed Ibrahim

Procedure Writer

Followers of Mohammed Ibrahim22000 followers
location of Mohammed IbrahimBaghdad, Baghdad Governorate, Iraq

Connect with Mohammed Ibrahim to Send Message

Connect

Connect with Mohammed Ibrahim to Send Message

Connect
  • Timeline

  • About me

    QA/QC Manger at SWCO- Al Selm & Al We`am General Contracting Co.

  • Education

    • Technology University

      1982 - 1986
      BscEngineering Production engineer and Metallurgy Good

      الأنشطة والجمعيات:Iraqi Engineering Union. Iraqi associated engineering

    • University of Technology

      1982 - 1986
      Bachelor's degree in Production engineering and Metaluragy Production Engineer and Managment
  • Experience

    • Iraqi Atomic Committee

      Dec 1986 - Dec 1990
      Procedure Writer

      Write the technology path for parts according drawing requirements.The parts made from different types of materials like St St,C St. Ceramic ,Graphite...etc.The manufacturing methods including use different CNC machines tools, so joining metals by different welding methods with inspection welding joints according to parts performance like visual, dye penetrate x ray, vacuum test and hydrostatic test.

    • Al Rabeea Factory, Baghdad

      Apr 1991 - Nov 1993

      Measuring, designing, manufacturing, welding, inspection welding joint and fabricating for aluminum bus duct unit 2 & unit 3 at Darbandy Kahn electrical power station after destroyed at 1st gulf war.Inspection TIG welding joint visual and dye penetrate. Fabricate and installation at the site. The job obtained honor degree for Iraq Electricity Ministry for the high quality ,difficult location at station and shortest time. Measuring, designing, manufacturing, welding, inspection welding joint and fabricating for aluminum bus duct unit 2 & unit 4 at Mousel electrical power station after destroyed at 1st gulf war.Inspection TIG welding joint visual and dye penetrate. Fabricate and installation at the site. The job obtained honor degree for Iraq Electricity Ministry for the high quality and shortest time .

      • Lead Fabricated Team

        Mar 1992 - Nov 1993
      • Lead Fabricated Team

        Apr 1991 - Feb 1992
    • Al Aqsah Co

      Apr 1994 - Apr 1996
      Reliability Engineer

      Maintenance and rehabilitate different types of Pumps, fuel pumps, oil pumps, hydraulic pumps, vertical and horizontal water pumps.

    • Al Rabeea Factory

      Jul 1996 - Dec 1999
      Lead Field Engineer

      Lead Field engineer responsible for install the units like boiler, compressor at refinery, to modification the refinery capacity and product quality and connect the instruments with piping line in different size and connect the power electrical control penal and different material.

    • Suse Group for general contracting and commercial agencies

      Jan 2000 - Feb 2003
      Project Manager

      rehabilitation raw water pump station vertical pumps and booster pumps ,rehabilitation pumps at river intake drinking water treatment plant, renovation check valves, butterfly gear valves ,fabricated and install 2 cooling tower close type 50 tons/hr., renovation machines tools at rebuilding engines factory, fabricated screen and vibrators to general state for paper industry.Leave the job while 2 gulf war start.

    • Suse

      Feb 2000 - Jan 2006
      Project Maneger

      at 2000 ,estimate the project cost,introduce technical offer and commercial,execute the project ,prepare the project duration program ,so the prepare the critical path diagram ,Ms project program

    • Suse group for general contracting and commercial agencies Co.

      Jun 2003 - Jun 2004
      Project Manager

      Renovation 5 schools established 2 football yards with IRD organizationfinished the job at time planned.Verify good benefit.

    • Suse group for general contracting and commercial agencies

      Jul 2004 - Aug 2005
      Project Manager and Contractor Representative

      Renovation 23 detached houses over all with Laguna Construction Corporation at IMAR Iraqi Military Academy at Rustumahiya - Baghdad. The project included renovation houses and garden as turnkey project, replaced the electrical power station grid, executed new water drinking pipes net, connect with water pump station, executed the main waste water piping system, construct sewage pump station, executed the roads as sub base and pavement .

    • Suse group for general contracting and commercial agencies

      Oct 2005 - Dec 2005
      Project Manager

      Take down camp and LCC with Flour Amec at IZ Iraq. Included remove the accommodations cabinets ,restaurant building, kitchen with store ,unities water system piping ,underground electrical cables ,roads ,pavement patio ,T-walls fence, metals gates, generators with structure for sun shade ,electrical boards ,reception building, guard towers .communications cables and antenna

    • Parson Corporation

      Feb 2006 - Oct 2006
      Site Engineer

      Site engineer at construction entry point at bored.Responsibility for check project materials quality, QC for construction progresses.

    • F&S Group for General Contracting Com

      Nov 2006 - Jul 2007
      Project Manager

      Construction Iraqi Military Camp with Kapa: construction new Iraqi Military Camp at Tale Al-Mileh consist of accommodations building, Defect building ,Kitchen building ,store ,fire station , vehicles maintenance building ,guard towers with fence ,reception building with metals gate ,management building ,store building ,fuel station ,water drinking station with piping system coverage all the camp, sewage pump station with piping system and Main holes ,roads, electrical power grid system with transformer ,generators with fuel tanks and sun shade structure ,sun shade structure at garage ,medical care building ,communication system with antenna . عرض أقل

    • Suse Group for General Contracting and Commercial Agencies Co.

      Aug 2007 - Apr 2011
      Project Manager

      Several contract with US Troops, for supplying IT, Life support, construction, supplying and maintenance generators, supplying and maintenance reefer vans 3 sites, supplying and install AC units.Construction project is to modification store building to MWR building for US Military as turnkey project executed at 45 days in area 280 m2 including remove material from store ,flouring ,construct the rooms ,supply and install AC units ,electrical system with fire alarm to building ,painting the building.Execute at time planed.The projects doing at risk site.Verify high benefit. عرض أقل

    • Golden Star For construction

      May 2011 - Mar 2013
      QA,QC Lead Engineer

      Check on the staffs for sub-contractors for safety requirements, check the measurements for construction items, and check the quality for material in domestic complex construction housing.Prepare the table for final assurance to pouring concrete after finished the reinforcement.Train the staff.Leave after finished the project.

    • Uruk Group

      May 2013 - May 2014
      QA,QC Lead Engineer

      QA , QC Lead engineer at construction new power electrical station plant execute the piping system at plant and install the chimney for units in height 40 meters which included welding parts after assembly at site, mange the staff, communication with the owner and the sub-contractors at site and welding workshop check the dimension and inspect the welding joint according to the drawing required , daily plan to our staff and sub-contractors, manage the inspection with piping welding, daily report to owner. The inspection included according to the drawing requirements dye penetrate ,x ray ,hydrostatic pressures test ,vacuum testing . عرض أقل

    • Bareeq alSabbah

      Jul 2014 - Feb 2015
      Construction /Piping Lead engineer GE 9E

      Senior Fabricating Pipe engineer at construction Al kahlaa power station plant, responsible for inspection execute the welding piping at workshop and site about 12000 dia inches, connect the storage tanks with turbine via pipes in size from 2 inch to 20 inch, communicate with owner and the staff, arrange with inspection QC staff and the main contractor. Check the dimension according to drawing and inspect the welding joint according the drawing requirements dye penetrate ,x ray ,hydrostatic pressures test ,vacuum testing عرض أقل

    • PEW

      Dec 2017 - Dec 2018
      BOP Lead engineer

      Prepare the methods of statements for installation skids at BOP AlZubeir Power Plant Station. Install most skids in Oil system, fuel gas system ,DM system ,and Black Start Diesel Generator BSDG Fabricated and install flare stack for power plant in height 60 meters.

    • Jurmat Group

      Oct 2018 - Jun 2019

      Erection ,fabrication, welding ,inspection joint welding ,painting ,fixing the support for pining system that feeding the GT with Air, Fuel Gas, Jacking oil system ,Fuel Oil ,and water cooling system . So the Co2 fire fighting system . Responsible for execute the hole system for fire fighting system at Al-Zubier power plant as turn key project.

      • GTG Super vision

        Dec 2018 - Jun 2019
      • Fire Fighting Lead Engineer

        Oct 2018 - Dec 2018
    • Shamara Group

      Aug 2020 - Nov 2021
      Senior Quality Assurance Manager
    • Interno Design for General Contracting & General Trading Ltd.

      Oct 2020 - May 2022
      • QA/QC Manager

        Oct 2021 - May 2022
      • QA/QC Manager

        Oct 2020 - May 2022
    • Internogroup

      Nov 2021 - May 2022
      QA/QC Manager
    • Maraba Al Iraq Al Kadhra’a (MIK)

      May 2022 - Dec 2022
      • QA/QC Manager

        May 2022 - Dec 2022
      • QA/QC Manager

        May 2022 - Sept 2022
    • AlBilal Group

      Dec 2022 - Dec 2023
      QA/QC Manager

      NGL Project

    • SWCO- Al Selm & Al We`am General Contracting Co.

      Dec 2023 - now
      QA/QC Manger

      QA/QC Manger roles

  • Licenses & Certifications

    • ASNT NDT (LPT) &(RT) LEVEL II

    • ASNT NDT (RT) Level II

    • OSHA

      OSHA Academy
      Oct 2020
    • ASNT NDT Level II (ASNT) - Radiographic Testing (RT) II

      L J NDT
      Jun 2015
    • ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)

      LJ NDT
      Jun 2015
    • Lifting Supervisor

      CORE LEEA
      Feb 2018
    • IOSH Managing Safety

      IOSH
      Nov 2020
    • Managing Safety Certificate

      NEBOSH - IOSH Training
      Nov 2020
    • Lifting Supervisor

      CORE Training , Consultation and General Services
      Feb 2018
      View certificate certificate
    • OSHA Certificate

      OSHA Safety Training Institute
      Oct 2020