Charl Jansen Van Vuuren

Charl Jansen Van Vuuren

Mechanical Supervisor

Followers of Charl Jansen Van Vuuren2000 followers
location of Charl Jansen Van VuurenSouth Africa

Connect with Charl Jansen Van Vuuren to Send Message

Connect

Connect with Charl Jansen Van Vuuren to Send Message

Connect
  • Timeline

  • About me

    Site Manager at Goss & Balfe

  • Education

    • Technical high school

      1984 - 1988
    • HTS Klerksdorp

      1984 - 1986
  • Experience

    • GOSS BALFE

      Jan 2004 - Jan 2008
      Mechanical Supervisor

      FIT AGITATOR SHAFT, HANSON GEARBOXES AND MOTORS, ALIGNMENTS, FIT AND ALIGN DUAL PUMPS, FIT AND ALIGN SPIRAL PUMPS, HYDRO TESTS AND BACK PUNCHES ON LINES, HYDRO TESTS ON OXYGEN , ACID AND LIME LINES. INSTALL OF OXYGEN AND CALDERRA VALVES. INSTALL AND PRESSURE TEST VESSELS. STRUCTURAL STEEL ERECTING,COMMISSIONING

    • Kentz

      Jan 2009 - May 2012
      Construction Superintendant

      HYDRO TESTS, PUMP ALLIGNMENTS, BUILDING OF GHHER STRUCTURE, INSTALLING OF SUPPORTS FOR CABLE RACKS AND PIPING,INSTALLING OF HIGH PRESSURE VALVES AND PIPING,REPAIRS ON FAULTY MATERIAL, INSTALLATION OF PRE HEATERS, HYDRON GENERATORS. FAN BRIDGES, FAN RINGS, ALIGNMENTS, ADJUST AND ALIGNMENT OF FAN BLADES BETWEEN RINGS AND BRIDGES AND BLADE ALIGNMENTS AT 6.1 DEGREES ON DEPT. AND 6.9 DEGREES ON CONC. ON 72METRES, BUILD OF A-FRAMES, LEVEL FOR BUNDLES, ASSEMBLING OF WIND WALLS. LEVELING OF TEMPORARY AND EXISTING BLOCKS IN POSITION AND MOVING 132M TOWER CRANE FOR WORK, MAX 2MM OUT ON RAILS. COMMISIONING AND PUMP ALIGNMENTS. Show less

    • Redis Construction Afrika

      May 2012 - Apr 2013
      Construction Superintendant

      ALLIGNMENT OF PUMPS, INSTALLATION OF PUMPS, Build OF ACID TANKS, CARBON STEEL TANKS, STAINLESS STEEL TANKS AND STEEL ERECTING, INSTALLATION OF HIGH PRESSURE VALVES AND PIPING

    • Base Titanium

      Apr 2013 - Jul 2014
      Construction Manager

      Am working for the client (Base Titanium) on a Titanium mine. My General Duties are ; Maintenance on plant, bore holes, plant roads and steel structures on plant. Am also in charge of any Piping, assembling of structures and all activities taking place on the plant by the sub contractors.

    • Goss & Balfe

      Jul 2014 - Nov 2015
      Site Manager

      Installation of Turbines, Compressors, After coolers, fan rings, fan bridges & fan blade alignments on LPC compression plant ( Sasol, Temane). Complete assembly & installation of Pipe Racks, Ducting,Piping supports and modification of all steelwork. Project Management.Metal fabrication,Engineering,Progress meetings with Client

    • SKA

      Feb 2016 - Jun 2016
      Supervisor Senior

      Building of accommodation, Warehouses, Cooling rooms, etc.Building of sewerage systems and stormwater drains.

    • Heunes Engineering

      Jun 2017 - Dec 2017
      Senior Site Supervisor

      Sunrise gas storageInstallation of Five Bullets, Structural steel, piping, and all mechanical components including three loading bays, loading arms with fire sprinkler systems to load trucks with LPG gas.Punching and commisioning of newly installed systems

    • SKA

      Feb 2018 - Sept 2018
      Supervisor Senior

      Maintenance of stormwater, sewerage lines, and accommodation.Building of cooler rooms and Warehouses for Coca Cola (Civils and Structural)

    • Stefanutti Stocks

      Sept 2018 - Oct 2018
      Construction Manager

      Two-month Shutdown on Sulfur Utilities.Structural work, piping, and mechanical equipment.Demolishing, installation, and redlining of drawings

    • Stefanutti Construction

      Jan 2019 - Jun 2019
      Construction Manager

      Ensure all work commences according to standardsOrder off tools and consumables ext. Redline off drawingsKeep track of all red lines and additional work and standing timeTo ridge deadline time of shut downDaily progress meetings with the client Sign off MC and RFC

    • PDPS

      Aug 2019 - Sept 2019
      Construction Superintendant

      ShutdownFabrication & Installation of Piping. High-pressure Pipeline. Welding of small & big bore Piping in position.

    • CM Construction

      Mar 2020 - Mar 2021
      Site Supervisor

      Civils, dewatering, Built of new sewerage plant, underground piping, manholes, valve stations, pump stations (Drybeds), elevations of the underground .piping, pump station building, installation of electrodes

    • Domento

      May 2021 - Dec 2021
      Site Manager

      Rebuild of Furnace plant (smelter), Piping, Emergency Cooling Water Stainless tank, Mechanical Equipment, and the Rebuild of whole Furnace plus Commissioning

    • Promac

      Jan 2022 - Jul 2022
      Site Superintendent

      Scoping and shutdownInstalling new high-pressure pipelines, Replacing valves and pumps

    • Domento

      Aug 2022 - Oct 2022
      Construction Manager

      ShutdownRebuilt of Furnace plant, Piping, Emergency, and all mechanical equipment

    • Anglo American

      Oct 2022 - Mar 2023
      Engineering Consultant

      Scoping for tenders on Ball mills, Corrosion on structures, pumps, Cranes, and all mechanical equipment on the plant to be replaced or repaired.

  • Licenses & Certifications

    • There is lot of them