Shady Emad

Shady Emad

Field Site Engineer (Rollout & Implementation)

Followers of Shady Emad696 followers
location of Shady EmadMuscat, Masqaţ, Oman

Connect with Shady Emad to Send Message

Connect

Connect with Shady Emad to Send Message

Connect
  • Timeline

  • About me

    Managed Service Delivery Manager | Environmental,Health and safety Manager at Ericsson NEBOSH IGC | PMP®

  • Education

    • El Shorouk Academy

      2006 - 2011
      Bachelor's degree Electrical, Electronics and Communications Engineering very Good
  • Experience

    • Blanche Tel

      Oct 2011 - Dec 2012
      Field Site Engineer (Rollout & Implementation)

      - Job Role/Department:• NEC - Mobinil PDH MW links Project▪ Assure from Accuracy and Quality done from ASPS.▪ Complete Installation, Commissioning and alignment of MW links in opposite sites.▪ Excellent knowledge about the menu structure and procedure for operating of PNMT (Java version)▪ Install PASOLINKNEO.▪ Install All Types of I-PASOLINK (100 – 200 – 400 – 1000)• Etisalat DBS Conversion Project▪ Transmission cutover & relocating from Shelter to APM30; using new DDF.▪ TE Equipment’s installation and installation new PDP.▪ Commissioning & testing of new System (including alarms)▪ Relaying power cable & connecting to generator.▪ Dismantling Old equipment’s.▪ Make Trouble shooting.▪ Acceptance for the site• Etisalat and Huawei Rollout and Expansion project▪ Transmission cutover & relocating from Shelter to APM30; using new DDF.▪ Site construction.▪ BTS Huawei 3900 site installation and Integration 2G.▪ BTS Huawei 3012 site installation and Integration 2G.▪ Performance Acceptance Test (P.A.T)▪ BTS RF Feeder Sweep Test.▪ Performance All Alarm Test.▪ Make Installation Indoor and Outdoor. Show less

    • ECP ONE TECHNOLOGY SOLUTIONS PRIVATE LIMITED

      Jan 2013 - Aug 2013
      Field Site Engineer (Testing and Commissioning Engineer)

      - Job Role/Department:• Vodafone and Ericsson project (Transmission / Rollout /backlog).▪ Acceptance for the site (REJECTED – PAC - NRFA)▪ Acceptance for (RBS & 3G & Traffic node & MlE )▪ Clear alarms for RBS 2000 family.▪ Clear alarms for RBS 6000 family.▪ Clear alarms for Traffic node (2p – 6p – 20p)▪ Clear alarms for 3G.▪ Commissioning for Traffic node (2p – 6p – 20p)

    • AFRO

      Sept 2013 - Dec 2014

      • Vodafone and Ericsson project (Transmission/ Rollout /3G/Acceptance)▪ Responsible for 9 Full teams Rented to Ericsson.▪ Handle the PO and GRN of teams with Costumer.▪ Handle Plan of Teams with Customer.▪ Coordinate teams in daily activity.▪ Co-ordinate with warehouse for materials dispatch to sites.▪ Manage the equipment installations, MW Alignment with teams,▪ Troubleshooting and Support all teams for any technical issue.▪ Handle the Sites access with Costumer.▪ Responsible for team’s quality of sites installation and Acceptance.▪ Daily Progress report to customer.▪ Daily follow with Customer till finish Cutover or make the site on air.▪ Ensure that all teams are utilized and on target.▪ Ensure that all teams perform and follow H&S Rules.▪ Handle the petty Cash and custody with teams then With Finance Team.▪ Handle the PO and GRN of teams with Costumer.▪ handle the daily Problems of team’s members.▪ Handle the packages of done activity and submit it to Customer.▪ Interface different Teams from Customer (Acceptance / transmission / Rollout) Show less • Vodafone and Ericsson project (Transmission and Integration project)▪ Complete Installation, Commissioning and alignment of MW links in opposite sites.▪ Install and Commissioning all types of Traffic Node (2P – 6P – 20P)▪ Install and Commissioning CN.▪ Software Upgrade for all modules (NPU - MMU- ETU – LTU) and Base line.▪ Site reroute and Hot swap for MW link.▪ Transmission cutover & relocating from Sia and Minilink-E to Traffic node and CN.▪ Install STM and Add Extra E1’s.▪ Clear all alarms of Traffic Node and CN.▪ Trouble shooting. & finish all Acceptance. Show less

      • Project Coordinator AFRO Egypt,

        Apr 2014 - Dec 2014
      • Field Site Engineer (Transmission)

        Sept 2013 - Mar 2014
    • Ericsson

      Jan 2015 - now

      • PM Project:- Job Role/Responsibility:▪ Delivering MS PM scope of work VF Egypt Region (+8000 sites).▪ Preventive Maintenance for VF-Egypt Region +8000 sites super visionary (24/7/year)▪ Create and perform the annul plan for VF Egypt Sites (+8000).▪ Customer interface, Satisfactory & Quality Assurance.▪ Interface for HOD / Area manager of VF 5 main region and VF Governance team.▪ Managing Matrix Org for 5 main Regions.▪ Line Manager for Control staff (Function/line manager)▪ Leader for Organization include 160 Employee in two consecutive layers.▪ Mentor for ASP delivering SOW (Alkan, Afro,9C,MAG, Mobiserv)▪ Leading Finance commitment (POs, MD#, & contract Settlement)▪ Leading Add on Sales projects.▪ Control the internal cost and handling Extra work with Customer.▪ Ensure resource and Filed PM team’s availability and allocation.▪ Follow up and update the progress and Acceptance weekly to the customer.▪ Develop a detailed project plan to track progress.▪ Create and maintain comprehensive related to Preventive maintenance project documentation.▪ Ensure all teams Complained H&S and all HSE-related documents are kept up to date.✓ Achievement:o Delivered scope, Contract KPI and achieved committed plan with VF for the First year of contractor.o Achieved planned NS and decreased the costo customer satisfactiono Successful closure for Business year 2016/2017• Consumable Materials Handling.• CCTV Project • Power Assessment Stream. Show less ✓ Achievement:o 23 consecutive Months Achieving and Awarded for KPI of SQI Scope.o Successfully Closure for season preparations streams for Sites Reflected by Decreasing number of down sites specially in Crises and enhance availability of Network.o Successfully Closure for outdoor ventilations system Project.o Successfully Closure for PM Project.- Job Role/Department:• Vodafone Egypt MS L1 G Cairo Zone: -▪ Responsible to increase the Site Quality index(SQI) for 3172 Sites and deliver the contract Scope and KPI to Customer.▪ Create plan & Coordinate Teams to Raise Quality Index for VF Cairo Sites (2055).▪ Responsible for seasons preparations (Summer / winter) for G Cairo sites to make the sites ready against Crises (H. T/ rain /Clean NSA backlog T.TS),▪ Project manager for outdoor ventilations system Project, provide and perform the plan and manage the Coordinators and teams., handle ASP and Materials.▪ Project Manager for PM Project which it was the first time for VF to have PM Cycles for sites.▪ Create and perform the Plan for Coordinators and teams for PM Project▪ Customer interface, Satisfactory & Quality Assurance.▪ Lead the Organization of PM Project, SQI, Outdoor project ( 160 Employee in two consecutive layers)▪ Leading Finance commitment (POs, MD#, & contract Settlement)▪ Monitor the ASP (Aklan – Afro – FSO)▪ Building data Base for all site in G Cairo region Show less ▪ One of transition and Delivery team▪ Building Due diligence document to frame contract execution.▪ Risk Assessment for project objectives▪ Define the PM scope document to the awarded ASPs (Authorized service Providers.▪ Building Up business case for Preventive maintenance project,▪ Make interviews for Control layer (coordinator and Auditor, Acceptance) for PM Teams.▪ Revision all WOW processes and assurance of implementing▪ Handover for 5 Regions representing Whole countries to NEW ASPs enrolled, by implementing all plans created based scope✓ Achievement:o Transforming Highest No. of Access Sites +8000 representing VF Infrastructure in Egypt Market for L1 Scope. Show less - Job Role/Department:• Vodafone Egypt MS L1 Cairo Zone: -▪ Responsible to increase the Site Quality index(SQI) for 2055 Sites.▪ Provide plan & Coordinate Teams to Raise Quality Index For VF Cairo Sites (2055).▪ Assure that from work done by Audit And review the SQI Checklist and Package.▪ Filed Audit Visit for teams to check work done.▪ Join Visit with Teams to increase the Quality and performance of teams.▪ Second line support for maintenance for Base Station Alarm Monitoring System with access control and without access control.▪ test Site External Alarm Monitoring System Remotely with field Engineer▪ Support field Engineer to Define & Clear All External Alarms of Site▪ Building data Base for all sites in Cairo region▪ Remotely Trouble shooting for down sites▪ Access on remedy and Citrix to solve& assign & cancel T.T for network sites Show less

      • MS Delivery Manager

        Jan 2021 - now
      • Quality Assurance Manager & EHS SME at CU ZGC – MS domain

        Jan 2019 - Dec 2020
      • MS Special Projects Manger

        Apr 2017 - Jan 2019
      • Developed projects Unit Head

        Mar 2015 - Apr 2017
      • Executive transition contract manager.

        Jan 2017 - Mar 2017
      • Quality Assurance Manager

        Jan 2015 - Apr 2015
  • Licenses & Certifications

    • NEBOSH International General Certificate in Occupational Health and Safety

      NEBOSH
      Sept 2023
      View certificate certificate