Doaa Elsamanoudy

Doaa Elsamanoudy

Architect

Followers of Doaa Elsamanoudy2000 followers
location of Doaa ElsamanoudyGreater Toronto Area, Canada

Connect with Doaa Elsamanoudy to Send Message

Connect

Connect with Doaa Elsamanoudy to Send Message

Connect
  • Timeline

  • About me

    Design Director | B.Sc Arch | PMP

  • Education

    • Project Management Institute

      -
      Project Management Professional (PMP) Project Management Project Management Professional (PMP)
    • Helwan University Cairo

      1994 - 1999
      Bachelor of Architecture (B.Arch.) Architectural Engineering

      B.sc of architecture

  • Experience

    • CCC

      Jun 2000 - Jul 2004
      Architect

      City Stars complex, a $580m traditional contract project with a 17 towers of exclusive residential apartments and modern office buildings, 3 five stars hotels and an iconic shopping and entertainment centre

    • Al MARASEM INTERNATIONAL for URBAN DEVELOPMENT

      Aug 2004 - May 2005
      Architecture coordinator

      Development of King Abdul Aziz Endowment, a $150m design & build complex project with 7 hotel towers ranges from 34 to 90 stories with approximately 40 rooms per floor, sitting on an 11 story commercial podium

    • GMW Architects

      Jun 2005 - Jun 2007
      Architecture coordinator

      International Airport, a $450m design & build project with a capacity of 11 million passenger/year; with total Terminal area over 200,000 m2 & Apron area 550,000 m2.• Managed the design upgrade efforts; followed up Interior Design presentations & materials. In addition to leading the Interior design Presentations to the Client.• Managed the change order log, preparing the abortive engineering work reports & participated in the related negotiation with the client representative. • Coordinated the MEP, structure & architecture shop drawings.• Coordinated the shop drawings for Interior design elements including door schedules & hardware. Show less

    • TAV Airports

      Jul 2007 - Feb 2008
      Architecture coordinator

      Cairo International Airport, Terminal 3, Egypt. a $450m design & build project with a capacity of 11 million passenger/year; with total Terminal area over 200,000 m2 & Apron area 550,000 m2.• Managed the Apron Control Tower Building, coordinating trades deliverables.• Coordinated infrastructure & landscape drawings.• Managed the change order log, preparing the abortive engineering work reports & participated in the related negotiation with the client representative.

    • Dar Al Handasah

      Feb 2008 - Mar 2010
      Senior Architect

      Renovation of Central Bank of Egypt- Headquarter, a $9.7m traditional contract project renovating a one-hundred- year-old building through modernizing its systems and usability while retaining its character, historical and aesthetical value.• In charge of upgrading & restoring the buildings original state and to modernize its M&E, communications, fire and life safety systems.• Managed the design development and presentations to the Client at each stage.• Managed deliverables from “design brief reports” to “for construction” packages.• Managed the design development process ensuring the design deliverables are in time, within budget and in compliance with company’s procedures, contract requirements, codes & regulations.• Reviewed technical bids with potential main contractors.Jabal Omar Development, Makah, Saudi Arabia, a $960m design & build project incorporating 11 Podiums with 23 Towers including five-star hotels, residential apartments and a commercial center.• Leading presentations and team’s workshops with potential hotels managers.• Managed the external work of the mountain topography including Roads, Bridges, Tented stairs, Escalators & landscaping on the underground Service Tunnel & Water Tank• Managed sub-consultants’ scope, design development, quality & deliverables schedule.• Managed the coordination efforts between sub-consultant’s deliverables & progressing designs of hotels operators, Arch, M&E & interior design consultants.• Responsible of the design development of a commercial podium with three residential towers.• Presented design stages to client representatives throughout the project lifecycle.• Managed the design team and processes ensuring the design deliverables are in line with company’s procedures, contract requirements, related codes & regulations. Show less

    • Alfuttaim carillion

      Mar 2010 - Dec 2012
      Design Manager

      Saskatchewan Hospital North Battleford- Integrated Correctional Facility, a $280m P3 contract, LEED Silver project• Developed quality assurance plan in line with the company procedures and in coordination with consultants.• Audit the design mangers and consultants’ QAQC procedures.• Issue monthly design report including design progress and QAQC highlightsVaughan Metropolitan Centre Station, Canada a $200m traditional contract for a subway station & transportation hub.& Cairo Festival City Mall, Egypt a $420m traditional contract building Festival City is a super-regional shopping center.• Managed trades scopes & changes; identifying and closing scope creeps, gaps & overlaps.• Reviewed trades deliverables against scop, budget, coordinated, and compliant with design intent.• Managed Trades’ bi-weekly progress review meetings and monthly reports.• Managed weekly design review meetings with the client representative and their consultants.• Managed shop drawings and materials submittals timeously to meet the project schedule.• Assisted the Principal Design Manager implementing a continuous improvement program and Design Management Plan. Show less

    • Carillion Canada Inc.

      Dec 2012 - Sept 2016
      Design Project Manager

      Saskatchewan Hospital North Battleford- Integrated Correctional Facility, a $280m P3 contract, LEED Silver project• Developed quality assurance plan in line with the company procedures and in coordination with consultants.• Audit the design mangers and consultants’ QAQC procedures.• Issue monthly design report including design progress and QAQC highlightsVaughan Metropolitan Centre Station, Canada a $200m traditional contract for a subway station & transportation hub.& Cairo Festival City Mall, Egypt a $420m traditional contract building Festival City is a super-regional shopping center.• Managed trades scopes & changes; identifying and closing scope creeps, gaps & overlaps.• Reviewed trades deliverables against scop, budget, coordinated, and compliant with design intent.• Managed Trades’ bi-weekly progress review meetings and monthly reports.• Managed weekly design review meetings with the client representative and their consultants.• Managed shop drawings and materials submittals timeously to meet the project schedule.• Assisted the Principal Design Manager implementing a continuous improvement program and Design Management Plan. Show less

    • The Walsh Group - Walsh Construction & Archer Western

      Sept 2016 - Mar 2018
      Senior Design Manager

      Managing the Design Development at the bid Phase of Michael Garron Hospital - Phase 1 New Patient Care Tower Project (CAD 411 M); West Park Healthcare Centre Hospital Development Project (CAD 550 M) and Ashbridges Bay Treatment Plant (CAD 146 M)Managing the Design Development at the bid Phase of P3 projects: Michael Garron Hospital - Phase 1 New Patient Care Tower Project (CAD 411 M) and West Park Healthcare Centre Hospital Development Project (CAD 550 M)• Managed design team to deliver a design that meet owner requirements in an optimal cost estimate.• Managed all project deliverables for both client and employer.• Managed Client Design Review meetings throughout the Bid & Preconstruction phase. • Negotiated contractual design agreements, scope and budget in conjunction with the legal team.• Providing weekly/monthly status updates on the project.• Created and Managed Design Risk &Opportunities Matrix.• Responsible for delivering a complaint bid design, Managing designers & trades throughout the bid lifecycle. Show less

    • EllisDon

      Apr 2018 - Jan 2022
      Project Manager - Design & Build

      Managing the design development in Bidding & Pre-construction Phases in the following P3 projects:Trillium Health Partners (THP) & Humber River Hospital (HRH) Long Term Care Facilities (LTC) – CCDC 5B Accelerated Build - Prefabricated Modular projects, managing the Design at Bid & Preconstruction Phases simultaneously for both projects then managing the Shop dwgs development with the Modular teams. New St. Paul Hospital Project (CAD 2.17 B) - Managing the Design Team to fulfil at Bid deliverables.West Park Healthcare Centre Hospital Development Project (CAD 550 M) – Change Control Management. MacDonald Block Reconstruction Project (CAD 1.5 B) – Managing the Design Team to fulfil at Bid requirements. Show less

    • THERME GROUP

      Sept 2022 - Apr 2024
      Senior Design Manager

      Managing the design development process & the technical stakeholder relationships for the developer leasing Ontario Place, West Island, as part of the Ontario Place revitalization project led by Infrastructure Ontario. The iconic Therme Canada | Ontario Place Development includes a well-being facility with acres of the public realm, enhanced trails, a public beach, shoreline restoration, new wetlands, and aquatic habitats, plus acres of publicly accessed green roof emphasizing the public experience of the famous heritage Cinasphere & Pods assists. Show less

    • Ledcor

      Apr 2024 - Feb 2025
      Senior Design Manager
    • Pomerleau

      Feb 2025 - now
      Design Director
  • Licenses & Certifications

    • Project Management Professional, PMP certified

      Project Management Institute, PMI
      Mar 2011
  • Volunteer Experience

    • Design Manager

      Issued by Carillion Canada Inc. on May 2013
      Carillion Canada Inc.Associated with Doaa Elsamanoudy