
Al Ibn Sina , PMP
Electrical Engineer

Connect with Al Ibn Sina , PMP to Send Message
Connect
Connect with Al Ibn Sina , PMP to Send Message
ConnectTimeline
About me
Experienced professional with over thirteen years of leadership in project management and power plant maintenance. Certified PMP-PMI, adept at strategic oversight and adept in bridging technology and creativity.
Education

Jatio Tarun shongho Academic
-
Ahsanullah University of Science and Technology
2005 - 2009Bachelor of Applied Science - BASc Electrical and Electronics Engineering 3.00 of 4
Lamar University
2023 - 2023Master of Engineering - MEng Electrical and Electronics Engineering 3.9
Experience

Quantum Power System Limited.
Nov 2009 - Apr 2012Electrical Engineer• Successfully completed the Erection and Commissioning work of 105 MW Power plant (NKK S.E.M.T. PIELSTICK 9.9 X 6 MW, NIIGATA S.E.M.T. 9.5 X 5 MW, SULZER 9.5 X 2 MW) as an Electrical Commissioning Engineer.• 160MVA, 11 KV / 132 KV Sub-station Erection and commissioning.• Successfully done Operation & Maintenance of 110 MW Power Plant in Bheramara, Khustiya. (S.E.MT PIELSTICK 9.9 X10 MW, NIGATA S.E.M. T 9.5 X 2 MW, NKK S.E.MT PIELSTICK 8 X 2 MW and Steam turbine 6 X 2 MW) • Time to time All Electrical work supervision and reporting to Electrical Manager about the pending work, progress of work and condition of work. And attending daily and weekly coronation meetings. Show less

Acorn infrastructure Service Ltd
May 2012 - Mar 2013Electrical Maintenance Engineer•100 MW plant (CAT MAK -16CM43C, 8 X 13.9 MW) Electrical System Installation and Commissioning. •150MVA, 11 KV / 132 KV and 5 MVA, 11 KV/.4 KV Sub-station Erection Commissioning successfully completed.

Chevron
Jan 2013 - Sept 2016I & E Site supervisor• Electrical engineer design Review as per project work in the Facility Engineer Department.• Review of Piping & Instrumentation Diagrams (P&IDs), cause and effect diagrams for electrical issues. Recommendations of existing designs, instrument/electrical layout, controls, etc.• Supervision of construction and installation activities for I&E work on projects.• Supervision of Functional testing, commissioning, and startup of the instrument, control, and electrical systems.• Brownfield projects and modification to existing electrical and power systems including hot cutover of control systems.• Serve as the point of contact for the Facility Engineering Department (FE) on instrumentation and electrical matters with both field operations and Contractors.• PLC, DCS Control Systems Hardware installations.• Piping Cathodic protection System Installation project Handling • Every day submit I & E department work update report. Show less

Digital Power plant (102 MW HFO Fired) , Orion Group
Oct 2016 - Jul 2017Senior Engineer Electrical System development work successfully completed as per operation and maintenance required of HFO Power plant (WARTSILA 20V32). Yearly plant development of 120/150 MVA, 132/11KV substation and Visual inspection, yearly check of switchgear protection system (LV, MV& HV) to keep its good Operating condition. Scheduled Maintenance & Troubleshooting of Alternator, Auxiliary boiler & EGB.• Regularly monitoring & Upgradation of All instruments and DCS system. • Monitoring all development work & supervision over electrical up-gradation work. All other official works when it is required Show less

Confidence Power
Aug 2017 - Jan 2021Deputy ManagerProject • Led the Pre-Commissioning and Commissioning of a new 226 MW HFO fired Heat Recovery as a team leader from Confidence power holding.• Successfully completed the Pre-Commissioning and Commissioning of 6 no’s MAN, MARIM4C2 Steam Turbine. • Successfully completed the Erection and Commissioning of 12 no’s MAN 18V48/60TS Engine & 18.55 MW ABB alternator. • Successfully completed the Erection and Commissioning of 12nos heat recovery boiler. • Perform Erection, Pre-commission, and Commissioning work 280/320 MVA Sub-station and BOP equipment (Booster Module, HFO Separator, LO Separator, compressor, etc.)• Perform testing, commissioning, and performance tests of EC&I work of the plant to ensure that the tests are correctly performed according to the approved procedures with coordination of OEM. • 113 MW X 2 = 226 HFO based power plant Electrical Controls and Instrumentation Engineering Drawing Review.• Effectively identifies problems as they occur and takes appropriate steps to solve them.• Performs turbines and generators overhaul, repair, or modification projects. • Follow up, monitor, and expedite the progress of the EC&I works by the EPC contractor and regularly report to the Project Manager.• Conduct technical meetings with the projects, engineering, and other departments as required, implement design changes and software modifications that may be required to bring the product up to specification. • Maintaining the proper documentation of all commissioning, inspections, maintenance and repair work, and any failures following any event. • Execution of modifications/ suggestions and generate the report, keep drawing, etc. updated after modification work. Maintain proper records for all tests for future reference.• Create the report for reporting to management, lenders, Lenders' Advisors. Show less

Confidence Power
Jan 2021 - Dec 2022ManagerMAJOR RESPONSIBILITES • Led the Erection, Pre-Commissioning and Commissioning of a new 226 MW Steam Turbine & reciprocating engine Power Plant. • Successfully completed the Erection, Pre-Commissioning and Commissioning of 6 no’s MAN, MARIM4C2 Steam Turbine & 3.6 MW Alternator. • Successfully completed the Erection and Commissioning of 12 no’s MAN 18V48/60TS reciprocating engine & 18.55 MW ABB alternator. • Successfully completed the Erection and Commissioning of 12nos heat recovery Steam Generator Instrumentation system. • Perform Erection, Pre-commission, and Commissioning work 4 no’s 70/80 MVA Transformer,• Perform testing, commissioning 280/320 MVA Substation 132 KV switchyard, 11 KV Medium Voltage panel and Control Panel. • Successfully completed the Erection and Commissioning BOP equipment Fuel Supply Module, Heavy Fuel Separator, Lube Oil Separator, compressor, etc.• 113 MW X 2 = 226 Steam Turbine & reciprocating engine power plant Electrical Controls and Instrumentation Engineering Drawing Review.• Effectively identifies problems as they occur and takes appropriate steps to solve them.• Performs turbines and generators overhaul, repair, or modification projects. • Follow up, monitor, and expedite the progress of the EC&I works by the EPC contractor and regularly report to the Project Manager.• Conduct technical meetings with the projects, engineering, and other departments as required, implement design changes and software modifications that may be required to bring the product up to specification. • Maintaining the proper documentation of all commissioning, inspections, maintenance and repair work, and any failures following any event. • Execution of modifications suggestions and generate the report, keep drawing, etc. updated after modification work. Maintain proper records for all tests for future reference.• Create the report for reporting to management, lenders, Lenders' Advisors. Show less

Solaric Group
May 2024 - nowAssistant General Manager Operations• Perform hands-on testing and troubleshooting of solar power systems during installation and commissioning, ensuring that all components function correctly and meet performance benchmarks.• Supervise the on-site installation of electrical and control systems, providing direct technical support to ensure that construction aligns with engineering designs and safety standards.• Conduct regular site inspections to monitor the quality of workmanship, assess the integrity of installed equipment, and verify compliance with engineering specifications and project timelines. Show less
Licenses & Certifications

Project Management Professional (PMP)
Project Management InstituteJan 2024
Recommendations

Miled nghaywe
Student at Holy Spirit University of Kaslik - USEKMazraet Yachou, Mount Lebanon Governorate, Lebanon
Babak sahraei
Electrical Estimator and Project ManagerVaughan, Ontario, Canada
Eva konecna
...Spartanburg, South Carolina, United States
Negar anjomanian
Civil Engineering Draftsperson at Tarh Sazan Mihan CompanyIran
Shivangi chaubey
Senior Project Engineer in Wipro at S&P GlobalPune, Maharashtra, India
Michael manski
Commercial Credit SpecialistUnited States
Linda kaplan, pe, f. sei
Senior Engineer at PennoniPittsburgh, Pennsylvania, United States
Arnaldo mota gestão de shopping center e obras civis
Gerente de Empresas | Gerenciamento | Grandes EmpreendimentosBelém, Pará, Brasilien
Bikram bahadur
AEM DeveloperWest Bengal, India
Robson ricardo klöppel
Engenheiro de Software | B.Sc. Ciência da ComputaçãoJoinville, Santa Catarina, Brasil
Victor adedamola
Chief Strategy Officer at JaracrayfishNigeria
Brian gihm
Director, Nuclear Decommissioning and Waste at Hatch | 1 Degree of separation from 10,000 extremely ...Oakville, Ontario, Canada
Yomi oyekanmi
IT Business Analyst & Product Owner | Blockchain, Web 3, AI/ML | Prioritizing Requirement Gathering ...Lagos, Lagos State, Nigeria
Ajay prasadh
Graduate Engineering TraineeCoonoor, Tamil Nadu, India
Víctor gómez
Telematics Engineer | Java Developer | Python Developer | Scala Big Data DeveloperSantiago de los Caballeros, Santiago, Dominican Republic
Kübra kahraman
ZORLU Gayrimenkul Grubu Sözleşme ve Hakediş MüdürüTürkiye
Suvarna sampagavi
Senior Software Engineer at Robert Bosch Engineering and Business Solutions(RBEI)Bengaluru, Karnataka, India
Luis santos
Youtuber, Marketing Digital, Comunicação, JornalismoEstremoz, Évora, Portugal
Abbos egamkulov
CEO at YM Program | Ex-Deloitte | Ex-Grant ThorntonGermany
Gandy natanagara
PT Pancamulti Niagaptatama (Ubertos)Greater Bandung
...