Ankit Jaimini

Ankit Jaimini

Production Planning Engineer

Followers of Ankit Jaimini22 followers
location of Ankit JaiminiFaridabad, Haryana, India

Connect with Ankit Jaimini to Send Message

Connect

Connect with Ankit Jaimini to Send Message

Connect
  • Timeline

  • About me

    PPC Assistant Manager in Gujarat Fluorochemicals Pvt Ltd

  • Education

    • B.S.Anangpuria Inst. Of Tech. & Mgt. Alampur, Distt. Faridabad

      2012 - 2016
      Bachelor of Technology - BTech Mechanical Engineering A
  • Experience

    • RR autotech pvt ptd

      Mar 2016 - Mar 2019
      Production Planning Engineer

      1) Performing Monthly, Weekly and Daily Production Planning as per Customer Schedule.(2(Responsible for Manpower Planning as per Customer Schedule.(3)Prepare Raw Material Planning and Follow up with Raw Material Supplier.(4)Calculate Daily Operator’s Utilization, Efficiency and Productivity.(5)Root Cause Analysis for the failure Against the Plan vs Actual to Bridge the Gap.(6)Handling 7 days Production Planning and Machine Shop Loading Plan. (7)Carrying out Dispatch Planning, so that Materials are dispatched on Time.(8)Maintain the IATF: 16949 Document and Maintain the 4M Change Documents and Process.(9)Weekly Review Meeting PPT Preparation & Action Plan Preparation on Effective Countermeasure. (10)Preparation & Modification of Process Control Documents like Control Plan, Standard Operating Procedures, Work Instructions, and Acceptance Standard for New Lines and Existing Lines.(11)DWM for Effective Team Building and Problem Solving.(12)Hourly Production Report Analysis and Maintain Daily Production Report.(13)Tool Setting, OWS, OSIR and Machine Check Sheet Document Maintain on Machine.(14)Root Card Maintain in WIP Area and Maintain Records of Daily WIP Stock Status & MIS.(15)Daily Gap Analysis of 4m, Daily Production Target and Take the Corrective Action Plan. (16)Control the Raw Material Stock and Product Inventory at Minimum Level.(17)Responsible for Production, Purchase Documents of ISO: 9001:2015 and IATF: 16949.Technical Knowledge(1)OEE,4m Data(2) Lead Time, Takt Time, and Cycle Time.(3)Reduce the Tool-Setup Time on Feeder Line (60 Minutes to 30 Minutes).(4)Start the TUBE Project (Line System).(5)5S, SMED, Poka-Yoke, Kaizen, Line Balancing, Cellular Manufacturing, Kanban. Show less

    • Minda Silca Engineering Ltd.

      Mar 2019 - Jun 2023
      Production Planning Engineer

      1) Performing Monthly, Weekly and Daily Production Planning as per Customer Schedule.(2(Responsible for Manpower Planning as per Customer Schedule.(3)Prepare Raw Material Planning and Follow up with Raw Material Supplier.(4)Calculate Daily Operator’s Utilization, Efficiency and Productivity.(5)Root Cause Analysis for the failure Against the Plan vs Actual to Bridge the Gap.(6)Handling 7 days Production Planning and Machine Shop Loading Plan. (7)Carrying out Dispatch Planning, so that Materials are dispatched on Time.(8)Maintain the IATF: 16949 Document and Maintain the 4M Change Documents and Process.(9)Weekly Review Meeting PPT Preparation & Action Plan Preparation on Effective Countermeasure. (10)Preparation & Modification of Process Control Documents like Control Plan, Standard Operating Procedures, Work Instructions, and Acceptance Standard for New Lines and Existing Lines.(11)DWM for Effective Team Building and Problem Solving.(12)Hourly Production Report Analysis and Maintain Daily Production Report.(13)Tool Setting, OWS, OSIR and Machine Check Sheet Document Maintain on Machine.(14)Root Card Maintain in WIP Area and Maintain Records of Daily WIP Stock Status & MIS.(15)Daily Gap Analysis of 4m, Daily Production Target and Take the Corrective Action Plan. (16)Control the Raw Material Stock and Product Inventory at Minimum Level.(17)Responsible for Production, Purchase Documents of ISO: 9001:2015 and IATF: 16949.Technical Knowledge(1)OEE,4m Data(2) Lead Time, Takt Time, and Cycle Time.(3)Reduce the Tool-Setup Time on Feeder Line (60 Minutes to 30 Minutes).(4)Start the TUBE Project (Line System).(5)5S, SMED, Poka-Yoke, Kaizen, Line Balancing, Cellular Manufacturing, Kanban. Show less

    • Gujarat Fluorochemicals Limited

      Jun 2023 - now
      PPC Assistant Manager

      Key Result Areas Across Tenure(1) Performing Monthly, Weekly and Daily Production Planning as per Customer Schedule.(2(Responsible for Manpower Planning as per Customer Schedule.(3)Prepare Raw Material Planning and Follow up with Raw Material Supplier.(4)Calculate Daily Operator’s Utilization, Efficiency and Productivity.(5)Root Cause Analysis for the failure Against the Plan vs Actual to Bridge the Gap.(6)Handling 7 days Production Planning and Machine Shop Loading Plan. (7)Carrying out Dispatch Planning, so that Materials are dispatched on Time.(8)Maintain the IATF: 16949 Document and Maintain the 4M Change Documents and Process.(9)Weekly Review Meeting PPT Preparation & Action Plan Preparation on Effective Countermeasure. (10)Preparation & Modification of Process Control Documents like Control Plan, Standard Operating Procedures, Work Instructions, and Acceptance Standard for New Lines and Existing Lines.(11)DWM for Effective Team Building and Problem Solving.(12)Hourly Production Report Analysis and Maintain Daily Production Report.(13)Tool Setting, OWS, OSIR and Machine Check Sheet Document Maintain on Machine.(14)Root Card Maintain in WIP Area and Maintain Records of Daily WIP Stock Status & MIS.(15)Daily Gap Analysis of 4m, Daily Production Target and Take the Corrective Action Plan. (16)Control the Raw Material Stock and Product Inventory at Minimum Level.(17)Responsible for Production, Purchase Documents of ISO: 9001:2015 and IATF: 16949.Technical Knowledge(1)OEE,4m Data(2) Lead Time, Takt Time, and Cycle Time.(3)Reduce the Tool-Setup Time on Feeder Line (60 Minutes to 30 Minutes).(4)Start the TUBE Project (Line System).(5)5S, SMED, Poka-Yoke, Kaizen, Line Balancing, Cellular Manufacturing, Kanban. Show less

  • Licenses & Certifications

    • Mace

      Maruti Suzuki Service Center Gurgaon | PASCO
      Jan 2019