Industrial visit

Followers of Noel Sarkar (MTech-IIT KGP, ADIS, Process Safety)2000 followers
location of Noel Sarkar (MTech-IIT KGP, ADIS, Process Safety)Kolkata, West Bengal, India

Connect with Noel Sarkar (MTech-IIT KGP, ADIS, Process Safety) to Send Message

Connect

Connect with Noel Sarkar (MTech-IIT KGP, ADIS, Process Safety) to Send Message

Connect
  • Timeline

  • About me

    Risk, Safety & Reliability Engineer at Monaco Engineering Solutions Ltd. (MES)

  • Education

    • LABAN HRAD VIDYAPITH

      2011 -
      Higher Secondary (Class 12), Board: W.B.C.H.S.E Pure Science 82.2%
    • LABAN HRAD VIDYAPITH

      2009 -
      Madhyamik (Class 10), Board: W.B.B.S.E According to W.B.B.S.E curriculum 83.25%
    • The Association of Engineers, India (West Bengal State Council Of Technical & Vocational Education And Skill Development)

      2021 - 2023
      Advanced Diploma in Industrial Safety (ADIS) Industrial Safety 1st Class

      Activities and Societies: Industrial Visit to Tata Power Skill Development Institute - Maithon: Hydel & Coal Based Power Plant visit Subjects Covered:Semester - I:Safety, Health & Environmental ManagementBasic Engineering SafetySafety EngineeringIndustrial Hygiene & Occupational HealthEngineering DrawingSemester - II:Appraisal, Analysis, Inspection & Control ProceduresSafety, Health & Environment Laws & RegulationEnvironment & Safety PhilosophyIndustrial Hygiene & Occupational Health LabTerm Work - HIRA StudySafety Engineering… Show more Subjects Covered:Semester - I:Safety, Health & Environmental ManagementBasic Engineering SafetySafety EngineeringIndustrial Hygiene & Occupational HealthEngineering DrawingSemester - II:Appraisal, Analysis, Inspection & Control ProceduresSafety, Health & Environment Laws & RegulationEnvironment & Safety PhilosophyIndustrial Hygiene & Occupational Health LabTerm Work - HIRA StudySafety Engineering LaboratorySemester-III:Chemical Safety in IndustrySafety in Construction IndustryApplied ErgonomicsFire Safety in Industry (Elective)Project work - HAZOP Study (Report & PPT preparation) Show less

    • The Association of Engineers, India - WBSCTE

      2021 - 2023
      Advance Diploma in Industrial Safety (ADIS)
    • Acharya Nagarjuna University

      2020 - 2021
      Diploma in Fire and Safety - Correspondence Course in collaboration with NIFS Process Safety Engineering 78.25%

      Subjects Covered:FUNDAMENTALS OF FIRE AND SAFETYINDUSTRIAL SAFETY TECHNIQUESCONSTRUCTION SAFETYSAFETY IN CHEMICAL INDUSTRY

    • Indian Institute of Technology, Kharagpur

      2015 - 2017
      M.TECH Chemical Engineering 8.42/10 (DGPA)

      Activities and Societies: Project title: Application of bio-nanocomposite in food packaging. Supervisor: Dr. Jayanta Chakraborty Objectives: • Synthesis of different morphologies of nanosilica and find an economic route. • Polymer nanocomposite processing technique incorporating nano silica into gelatin. • Adding chitosan nanoparticles into the film to give antimicrobial property that can be used as anti-microbial food packaging application. (Potential future work) OTHER PROJECT EXPERIENCES;• Particle size analysis of the ion exchange resin beads from effluent treatment plant (Sponsored by LANXESS).• Exploring the process of spent sulfuric acid purification (98%) by flocculant and peroxide treatment (Sponsored by LANXESS).• Processing of nanocomposite using montmorillonite (MMT) nano clay into PET (in-situ), LDPE (solution casting) and HDPE (solution casting) polymer matrix. Exfoliation study of the nanoclay in the composite with… Show more OTHER PROJECT EXPERIENCES;• Particle size analysis of the ion exchange resin beads from effluent treatment plant (Sponsored by LANXESS).• Exploring the process of spent sulfuric acid purification (98%) by flocculant and peroxide treatment (Sponsored by LANXESS).• Processing of nanocomposite using montmorillonite (MMT) nano clay into PET (in-situ), LDPE (solution casting) and HDPE (solution casting) polymer matrix. Exfoliation study of the nanoclay in the composite with potential application in food packaging industry. Show less

    • Heritage Institute of Technology

      2011 - 2015
      B.TECH Chemical Engineering 8.47/10 (DGPA)

      Activities and Societies: Preparation of co-precipitated nanoparticles of Fe/Cr/Zn/Cd-hydroxides and incorporation into PVA-clay composite to make modified membrane. Potential application: Modified membrane can be used for water filtration. Summer internship: Berger Paints India Ltd. 14/15, Swarnmayee Rd, B Shalimar Area, Shalimar, Howrah, West Bengal: 711103 GATE qualified, AIR-507 (2015)

  • Experience

    • IFB Agro Industries Ltd.

      Mar 2013 - Mar 2013
      Industrial visit

      Brief overview of the plant. It was a visit for one day, we explored different sections of the plant and the type of products manufactured.Supervisor: Dr. Alok Sen

    • Haldia Petrochemicals Ltd (HPL)

      Jun 2013 - Jun 2013
      Industrial visit

      Brief overview of the plant. It was a visit for one day, we explored different sections of the plant and the type of products manufactured.Supervisor: Dr. Alok Sen

    • Berger Paints India

      Jun 2014 - Jul 2014
      Summer Internship

      • Introduction to paint & powder coating technique.• Ideas about different mechanical operation equipments such as silo, hopper.

    • LANXESS

      Apr 2016 - Jul 2016
      Academic project on contract

      • Particle size analysis of the ion exchange resin beads (before classification as supplied by LANXESS) using ImageJ after classifying using same density fluid as that of the beads.• Exploring the process of spent sulfuric acid purification (98%) by flocculant and peroxide treatment.

    • Indian Institute of Technology, Kharagpur

      May 2017 - Jul 2019
      Research Scholar

      Industry: Reliance Industries Limited, Patalganga Manufacturing Division.Project Description: Improvement of barrier properties of PET using clay fillers – Nano Composites for Smart Packaging Application.Objectives Achieved: Exfoliation study of Montmorillonite (MMT) nano clay and corresponding characterization ; Lab scale synthesis of PET by In-situ polymerization and corresponding characterization ; Incorporation of MMT nano clay in PET, LDPE & HDPE polymer matrix to prepare nano composite and corresponding characterization ; Barrier property testing of the nano composites by Dissolved Oxygen (DO) measurement of water in a easy to apply lab scale experiment. Show less

    • NRGtech Services

      Aug 2019 - Nov 2019

      Key Role:HAZOP Report Review and SIL workheet preparationCairn Oil & Gas (Vedanta Limited) is India’s largest private upstream O&G company with operating interests in several producing fields in India contributing ~27% of India’s domestic crude production. Cairn Oil and Gas (Vedanta Limited) is the operator of the onshore RJ-ON-90/1 block, on behalf of itself and its Joint Venture (JV) partners Cairn Energy Hydrocarbons Limited (CEHL) and Oil and Natural Gas Corporation Limited (ONGC), located in Barmer district, in the state of Rajasthan, India. Cairn Oil & Gas(Vedanta Limited) holds 70% participating interest in the block which contains 38 major oil and gas discoveries, with significant gas potential in the southern area and oil in the northern area of the Barmer Basin. Apart from 4 major discoveries in the basin, viz. MBA (Mangala, Bhagyam & Aishwariya) & RDG (Raageshwari Deep Gas), remaining 34 discoveries are relatively marginal in nature, and are geographically widespread across the basin and are under various stages of execution. Show less Key Role:Simulation of the jet fire explosion and corresponding consequences using DNV Phast software.Simulation of the time varying leak for jet fire consequences for different scenarios such as: IFBF (Isolation Failure Blowdown Failure). ISBF (Isolation Success Blowdown Failure). ISBS (Isolation Success Blowdown Success). Isolatable section marking. Inventory volume calculation. Definition of jet fire and pool fire. Direct jet fire impingement and effect of fire radiation on the sensitive equipments. Jet fire impingement and radiation criteria for industrial equipments and buildings.  Jet fire effect analysis using simulation tool DNV Phast. Understanding ETA. Differentiation between time varying leak and normal leak scenario.PTT Global Chemical Public Company Limited (GC) plans to modify the existing Olefins I-4/2 located at GC#3 for feed flexibility of processing more propane which considers on two feed cases:Case 1: 100% Propane feed at 90% of ethylene production capacity (limited by furnace capacity) (Target Ethylene production capacity: 44.32 t/h)Case 2: Propane + 25 t/h of Ethane feed at 100% of Ethylene production capacity (Target Ethylene production capacity: 49.24 t/h) Show less Key Role: F&G mapping simulation using HazMap 3D. Final report editing and reviewing.Along with Basic understanding of: Applications of Gas and Flame Detectors. Types of gas and flame detectors. Definition of different coverages for gas detectors. Definition of fire grading, orientation and coverage for flame detectors. Placement of gas detectors using simulation tool HazMap 3D.Champion 11 complex is a critical hub for the entire East asset because it serves as the central crude stabilization and export pumping facility for the Champion field and entire East production except for Mampak and Magpie. The gross production out of Champion 11 is about 25,000 m3/d (Entire East minus Mampak and Magpie) while total gas production is 170 ksm3/d. Total oil production from CPDP11 alone is 400 m3/d while oil production from Champion south is 1000 m3/d.The main purpose of the Champion 11 Complex Rejuvenation Project is to restore critical assets to a state where the BSP production systems can safely and effectively produce until the economic end of field life. Show less Key Role: F&G mapping simulation using HazMap 3D. Final report editing and reviewing.Along with Basic understanding of: Applications of Gas and Flame Detectors. Types of gas and flame detectors. Definition of different coverages for gas detectors. Definition of fire grading, orientation and coverage for flame detectors. Placement of gas detectors using simulation tool HazMap 3D.Hengyuan Refining Company Berhad (hereinafter referred to as “HRC”) located in Port Dickson, state of Negeri Sembilan is implementing the Euro IV (M) Project to upgrade the existing Refinery Gasoline (MOGAS) product quality from Euro II (M) specification to Euro IV (M) specification, in accordance with Malaysian government’s legislation to produce cleaner fuel. Euro IV (M) Project site is a Brownfield site located approximately 103 km from south east from the city of Kuala Lumpur.The mapping has been conducted by using a 3D computer aided software known as HazMap3D for the ISBL facilities and for the OSBL facilities (except for the Flare KOD area where the 3D flame detection mapping was performed) the detectors were placed based on plot plans. Show less

      • VEDANTA LIMITED Cairn Oil & Gas, INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELDS IN

        Nov 2019 - Nov 2019
      • Fire and explosion Risk Assessment of Olefins I-4/2 Modification for Propane Feedstock Project

        Sept 2019 - Nov 2019
      • HAC - VEDANTA LIMITED Cairn Oil & Gas Integrated Gas Surface Facilities for RDG Field

        Sept 2019 - Oct 2019
      • Fire & gas detector mapping – champion 11 complex rejuvenation project for BSP (FEED)

        Aug 2019 - Oct 2019
      • Fire and Gas Mapping for Euro IV (M) Project for Hengyuan Refining Company Berhad (HRC)

        Aug 2019 - Oct 2019
    • NRGtech Services

      Jan 2020 - Dec 2020

      Key Role:• F&G mapping simulation using HazMap 3D.• Optimization and troubleshooting results.• Final report writing and reviewing.Champion 11 complex is a critical hub for the entire East asset because it serves as the central crude stabilization and export pumping facility for the Champion field and entire East production except for Mampak and Magpie. The gross production out of Champion 11 is about 25,000 m3/d (Entire East minus Mampak and Magpie) while total gas production is 170 ksm3/d. Total oil production from CPDP11 alone is 400 m3/d while oil production from Champion south is 1000 m3/d.The main purpose of the Champion 11 Complex Rejuvenation Project is to restore critical assets to a state where the BSP production systems can safely and effectively produce until the economic end of field life. Show less Safety reports studied:1. ESCAPE, MUSTER, EVACUATION AND RESCUE ASSESSMENT (EMERA) 2. DROPPED OBJECT STUDY (DOS)3. TEMPORARY REFUGE IMPAIRMENT ASSESSMENT (TRIA)4. EMERGENCY SYSTEMS SURVIVABILITY ANALYSIS (ESSA)5. RISK ASSESSMENT OF PIPELINE PROTECTION (DNV-RP-F107)Familiar with few International Safety Standards:1. BP-GP (30-85)2. SHELL DEP 32.30.20.11 3. OISD-1134. EN 1992-1-2-1995 (Eurocode 2: Design of concrete structures-Part 1-2: General rules-Structural fire design)5. CCPS (Centre for Chemical Process Safety)-Guidelines for Facility Siting and Layout, Layers of Protection Analysis (LOPA)6. IEC-615117. OGP (Risk Assessment Data Directory)8. DEP 80.47.10.12 (WATER-BASED FIRE PROTECTION SYSTEMS FOR OFFSHORE FACILITIES)9. NFPA 2010. Brief overview of UL 1709 fire test11. API-520/521(2014) - Sizing, Selection, and Installation of Pressure-relieving Devices (Part-I: Sizing and Selection)12. CMPT- A Guide to Quantitative Risk Assessment for Offshore Installations13. Model Code of Safe Practice Part-9 (IP 9)14. CAP 437- Standards for offshore helicopter landing area Show less Chairman worked with: Mr. Dipak Kumar PahariKey Role:• Participation in e-HAZOP workshop conducted via Microsoft Team.• Preparation of Node marked P&ID.Integrated Solvent Plant (ISP) at HWP (Heavy Water Plant), Tuticorin is intended to produce various types of solvents for captive consumption of Department of Atomic Energy. These solvents are produced in different campaigns in batch manner as per the requirement of the department. The plant shall consist of equipment viz. reactors, vessels, day tanks, bulk storage tanks, heat exchangers, columns etc. machinery viz. pumps, agitators, blowers, compressors etc. auxiliary and package utility systems. Other utilities such as power, raw water, DM water, Instrument Air & nitrogen shall be drawn from HWP. Show less Key Role in the project: • Lead Engineer• Carrying out F&G Mapping Simulation using HazMap 3D.• Validation and troubleshooting results.• Report preparation.AMDP30 is a four (4) legged drilling platform and twelve (12) conductor slots located in approximately 39 m water depth. It consists of two (2) main deck level, helideck, wellhead service platform, vent stack located at north face of platform and one (1) boat landing at the east face of platform. The platform was installed in December 1997. AMDP30 is one of the top 20 (T20) assets selected by BSP for Rejuvenation following an Urban planning exercise and agreement of East and West Asset Leadership. Show less Key Role: Scribe • Duration: 3 months.• Chairman worked with: Mr. Dipak Kumar Pahari  Mr. Dario Gusovsky  Mr. Arun KumarThe Qatargas (QG) Onshore LNG Facilities are located in the North-West corner of Ras Laffan Industry City (RLIC) (25.908N 51.556E). RLIC is situated along the north east coast of Qatar overlooking the Arabian Gulf, approximately 80km north of Doha.The LNG process uses APCI AP-X LNG technology, a refrigeration system using propane, mixed refrigerant and nitrogen refrigeration. Cooling to each liquefaction train is via a dedicated recirculation cooling water system. Show less

      • Fire and Gas Mapping Study- SAINT 1 & SAINT 3, Brunei LNG terminal pipeline project (DD)

        Nov 2020 - Dec 2020
      • Fire & gas detector mapping – champion 11 complex-BSP extension of CPRP11 platform (Detailed Design)

        Oct 2020 - Dec 2020
      • F&G Mapping Study of CWDP01 Rejuvenation project, Offshore wellhead platform for BSP-Serikandi

        Aug 2020 - Dec 2020
      • Process Safety Engineer

        Aug 2019 - Dec 2020
      • ISP Vendor Package HAZOP (using MS Team) workshop- Heavy Water Board (HWB), Tuticorin

        Jun 2020 - Jun 2020
      • Polycarbonate Plant Package HAZOP (using Skype for business, HOYLU ) workshop for Shell

        Apr 2020 - Jun 2020
      • F&G Mapping Study of AMDP 30, Offshore wellhead platform for BSP-Serikandi

        Mar 2020 - Jun 2020
      • Qatargas QG2 and QG3&4 Onshore Baseline HAZOP and Update SIL Assessment Studies Workshop

        Jan 2020 - Mar 2020
      • QRA REPORT FOR WHP-U08C TOPSIDE, PIPELINES, BROWN-FIELD MODIFICATION AT PS1K

        Jan 2020 - Mar 2020
    • Bureau Veritas Group

      Jan 2021 - Sept 2021

      Key Role: Fire & Gas Consequence Analysis using DNV Phast/Safeti.Report Preparation/ReviewBased on Fire & Gas Consequence analysis corresponding F&G Mapping (2D) is executed.Oil and Natural Gas Corporation Limited, hereinafter called as ‘ONGC and/or COMPANY’ isengaged in exploration & exploitation of Mumbai High field in Western Offshore Basin. Thefield is well developed, with an extensive infrastructure of Wellhead platforms, Processplatforms and Pipelines. The present tender is for NQ Process Complex, located in waterdepth of around 65.5 m. Show less Key Role: Building Impact Assessment due to heat radiation by Jet Fire/Pool Fire/Fire Ball scenarios & Toxic release for all units using DNV Phast/Safeti.Hengyi Industries Sdn Bhd (registered name in Brunei: HENGYI INDUSTRIES SDN BHD,hereinafter referred to as “HYBN”) is controlled by Hengyi Petrochemical Co., Ltd., and is jointlyfunded by Zhejiang Hengyi Group Co., Ltd. and Damai Holdings Limited,a wholly ownedsubsidiary of Strategic Development Capital Fund (SDCF) of Brunei Ministry of Finance. Zhejiang Hengyi Group Co., Ltd. (hereinafter referred to as “Hengyi Group”) is a large-scalemodern private enterprise group specializing in the production of PTA, polyester spinning andchemical fiber texturing, financial investment, import and export business operation and realestate development. Headquartered in Xiaoshan Economic and Technological DevelopmentZone, Hangzhou, Zhejiang Province. Show less Key role: Pipeline QRA study using DNV Phast/Safeti. inter safety distance analysis, Report Preparation/ReviewFacilities covered: 5 bases - Kakinada; Vijjeswara; Gudivada; Lanco; TatipakaGAIL (India) Limited, A Maharatna Company of Govt. of India, is India’s Flagship Natural Gas Company and having & operating nearly 900 km length of pipeline for transporting Natural Gas from Tatipaka-Kakinada, Narsapur - Kovvuru and Tatipaka - Kondapalli pipelines covering three Districts viz., East Godavari, West Godavari and Krishna in Andhra Pradesh. Show less

      • HAZOP & QRA study for IOCL Rajbandh delivery station & associated mainline – HSD, MS & SKO products

        Aug 2021 - Sept 2021
      • CFD simulation for Helideck Turbulence Analysis & Thermal Plume Dispersion Study - ONGC/LTHE

        Aug 2021 - Aug 2021
      • HAZOP/HAZID/QRA Study for Surface Facilities And Gas Pipeline At GCS Gamnewala, - ONGC/MEIL

        Jun 2021 - Aug 2021
      • 2D F&G Mapping Study for Oil & Natural Gas Corporation NLRNC RT2 project using consequence analysis

        May 2021 - Aug 2021
      • Quantitative Risk Analysis (QRA), Fire Load - Haldia Petrochemicals Complex - Fire Pre-Plan Project

        Mar 2021 - Aug 2021
      • Risk & Safety Engineer

        Dec 2020 - Aug 2021
      • QRA study for PMB Petrochemical Phase II - Hengyi Industries SDN BHD, Brunei

        Jul 2021 - Jul 2021
      • QRA Study - CNG station in Premises of Central Jail in Khasra, Jaipur, Rajasthan

        Jul 2021 - Jul 2021
      • QRA study of cross country pipeline at KG Basin, Rajahmundry - GAIL (India) Limited

        Apr 2021 - Jun 2021
      • HAZOP Workshop - Hindustan Urvarak & Rasayan Limited (HURL)/Macmet Engineering

        Mar 2021 - Mar 2021
      • HAZOP workshop - Rourkela Steel Plant, SAIL

        Feb 2021 - Mar 2021
      • HAZOP Workshop - IISCO Steel Plant, Burnpur, SAIL

        Feb 2021 - Feb 2021
      • Online HAZOP workshop for Tata Steel BSL

        Jan 2021 - Jan 2021
      • Online HAZOP workshop for Tata Steel BSL

        Jan 2021 - Jan 2021
    • SGS

      Sept 2021 - Feb 2022

      Client: Great Eastern Energy Corporation LimitedKey Role: Site visit, conducting Quantitative Risk Assessment (QRA) study using DNV Safeti/Phast, report preparation/review.Great Eastern Energy Corporation Limited (GEECL) is an India-based company engaged in the extraction and sale of coal bed methane (CBM) and compressed natural gas. The Company has two CBM blocks one located at Raniganj (South), West Bengal, and another one in Mannargudi, Tamil Nadu. GEECL has established following upstream, midstream and downstream facilities in Raniganj (South) block in Paschim Burdwan, Bankura and Purilia District in West Bengal Show less Client: Great Eastern Energy Corporation LimitedKey Role: Scribing in HAZOP Workshop, Node marking/Node Preparation, Participation in workshop discussion, report preparation/review.HAZOP study for CBM Pipelines, SV Stations and tap off lines upto MRS points at respective customer ends under boundary limit of GEECL.Great Eastern Energy Corporation Limited (GEECL) is an India-based company engaged in the extraction and sale of coal bed methane (CBM) and compressed natural gas. The Company has two CBM blocks one located at Raniganj (South), West Bengal, and another one in Mannargudi, Tamil Nadu. GEECL has established following upstream, midstream and downstream facilities in Raniganj (South) block in Paschim Burdwan, Bankura and Purilia District in West Bengal Show less

      • Senior Safety Engineer

        Sept 2021 - Feb 2022
      • QRA study for tank farm area of Four (4) sites – Flammable & Toxic storage

        Dec 2021 - Jan 2022
      • Pipeline Location Class Determination in line with OISD 226 SOP - GEECL, Asansol

        Nov 2021 - Dec 2021
      • QRA study for CBM cross country pipelines, SV Stations & Central Gathering Station - GEECL, Asansol

        Oct 2021 - Dec 2021
      • Fire Safety Audit for WBPDCL Process Units - BTPS, KTPS, SgTPP, BkTPP & WBPDCL Corporate Office

        Sept 2021 - Dec 2021
      • HAZOP study for CBM Pipelines and Associated Facilities - GEECL, Asansol

        Nov 2021 - Nov 2021
      • QRA study for hazardous chemicals & liquid in plant – Chlorine & LDO R1 - Hiranmaye Energy Limited

        Sept 2021 - Nov 2021
    • Sigma-HSE India

      Feb 2022 - Mar 2023

      Client: Asian Paints Ltd.Project Description: HAZOP study of Taloja unit plant process and storage tanks facility.Key Role: Node Mark P&ID preparation, HAZOP scribing, active participation in HAZOP session, Report preparation and review. HAZOP chairman: Mr. Arvind Kaushik Client: Pidilite IndustriesProject Description: QRA study of Vinyl Acetate Monomer reactor and storage tank facility – Baddi Unit. Key Role: QRA study using DNV Safeti/Phast, report preparation/review Client: GAIL/Howe Engineering Projects (I) Pvt. Ltd.Project Description: QRA study for LPG pipeline of GAIL’s hook-up facility at MithiRohar, Gujarat Key Role: QRA study using DNV Safeti/Phast, report preparation/review Client: Nestle India Ltd.Project Description: Updation of ATEX risk assessment – Samalkha siteKey Role: Site visit at Samalkha unit of Nestle, equipment monitoring for compliance of ATEX rating, ATEX sheet updation and review. Client: Johnson Matthey Chemicals India Pvt Ltd.Project Description: Hazardous Area Classification updationKey Role: Report updation and review. Client: SRF Limited, Packaging Film Business Project Description: Hazardous Area Classification Report for BOPP DTA2 ProcessKey Role: Report updation and review. Client: Air Liquide Global E&C Solutions India Pvt LtdProject Description: HAZOP & LOPA study of Metadynea Bio PG And GD UnitKey Role: HAZOP & LOPA Worksheet preparation in PHA Pro, Report review. Client: Johnson Matthey Chemicals India Pvt Ltd.Project Description: Hazardous Area Classification updation and Layout markupKey Role: Layout markup using Draftsight 3D, HAC report updation and review. Key Role: Gas Consequence analysis using DNV Safeti/Phast, 2D Gas Mapping, report preparation/review. Key Role: QRA study using DNV Safeti/Phast, report preparation/review Client: SRF Limited, Bhiwadi UnitProject Description: HAZOP Study for Feed and Distillation Section for SRF Limited Bhiwadi unit – P2 ProjectKey Role: Scribing in HAZOP Workshop, Node marking/Node Preparation, Participation in workshop discussion, report preparation/review. Key Role: Site visit done and on field measurements taken for the resistivities of the equipments, ground, operator wears etc. Checking the adequacy of earthing and bonding as per Indian and International standards to mitigate chances of fire/explosion due to electrostatic discharges. Client: Mott MacdonaldKey Role: Blast overpressure modelling and downwind distance with overpressure variation reporting. Main input for blast wall structural design around the reactor Client: Meghmani Organics Limited – Dahej, GujaratProject Description: QRA report updation for MOL facility of storage tank farmsKey Role: QRA study using DNV Phast/Safeti, final report preparation/review. Client: Surhan Gas Chemical Operating Company, UzbekistanKey Role: QRA & FERA study using DNV Phast/Safeti, P&ID study, Isolatable section marking, Parts count, Report Preparation/Review Client: Louis Dreyfus Company India Pvt. Ltd.Project Description: Fire Systems Assessment for LDC facility – Kandla, GujaratKey Role: On-site Fire Systems Assessment execution, Report Preparation/Review. Client: Teva Pharmaceuticals, GoaKey Role: Dust explosion overpressure simulation using DNV Phast corresponding to Pmax value and overpressure contour reporting. Client: NestleKey Role: Minor contribution for ATEX rated equipment sheet updation Key Role: Node Marking, Process Study, HAZOP Scribing, HAZOP report preparation and review. (HAZOP Chairman: Mr. Arvind Kaushik)QRA Study using DNV Phast/Safeti, QRA report preparation and review Client: Galaxy Surfactants LimitedKey Role: Quantitative Risk Assessment (QRA) report review & simulation updating by additional hazard scenarios of NG installation using DNV Phast/Safeti, final report preparation/review. Client: Aarti Industries LimitedKey Role: Impact analysis by consequence modelling using DNV Phast/Safeti, final report preparation/review. Presented 3 hrs webinar on Fire & Gas Mapping study - 2D/3D, Interacted via Q&A session Client: Petrocon Engineers & ConsultantsKey Role: P&ID study, Parts count, Modelling using DNV Phast/Safeti, Report preparation and review

      • HAZOP study for Asian Paints - Taloja unit process and storage tank farm

        Feb 2023 - Mar 2023
      • Senior Process Safety Consultant

        Feb 2022 - Mar 2023
      • QRA study of Vinyl Acetate Monomer reactor and storage tank facility – Baddi Unit.

        Feb 2023 - Feb 2023
      • QRA study for LPG pipeline of GAIL’s hook-up facility at MithiRohar, Gujarat

        Jan 2023 - Feb 2023
      • Updation of ATEX risk assessment – Samalkha site

        Jan 2023 - Feb 2023
      • Hazardous Area Classification updation

        Jan 2023 - Jan 2023
      • Hazardous Area Classification Report for BOPP DTA2 Process

        Jan 2023 - Jan 2023
      • HAZOP & LOPA study of Metadynea Bio PG And GD Unit

        Jan 2023 - Jan 2023
      • Hazardous Area Classification updation and Layout markup

        Dec 2022 - Jan 2023
      • 2D Gas Mapping Study for AHF storage bullets and tonners facility – SRF Limited

        Oct 2022 - Nov 2022
      • QRA Study for AHF storage bullets and tonners facility – SRF Limited

        Oct 2022 - Nov 2022
      • HAZOP Study for Feed and Distillation Section for SRF Limited Bhiwadi unit – P2 Project

        Sept 2022 - Sept 2022
      • Electrostatic Hazard Assessment for 5 plants - Rallis India Limited

        Sept 2022 - Sept 2022
      • Blast overpressure study of hydrogenation reactor using standalone TNO multi energy model

        Aug 2022 - Sept 2022
      • QRA report updation for MOL facility of storage tank farms

        Jun 2022 - Sept 2022
      • QRA & FERA Study - Boysun Gas Processing Plant, Uzbekistan - Surhan Gas Chemical

        Mar 2022 - Sept 2022
      • Fire Systems Assessment for LDC facility – Kandla, Gujarat

        Jun 2022 - Jul 2022
      • Dust Hazard Assessment for FBD system, FBD area and dust extraction system

        May 2022 - May 2022
      • Dust Explosion Risk Analysis

        May 2022 - May 2022
      • HAZOP & QRA Study for DCM Shriram Distillery Unit, Ajbapur, Lucknow

        Apr 2022 - May 2022
      • QRA study for G-59 Tarapur Plant

        Mar 2022 - Mar 2022
      • Impact Analysis Study – Custom Synthesis Division, VAPI

        Mar 2022 - Mar 2022
      • Presenter in Webinar on Fire and Gas Mapping Study - 2D/3D

        Mar 2022 - Mar 2022
      • QRA study for Styrene Monomer Storage Facility

        Feb 2022 - Feb 2022
    • Bureau Veritas Group

      Mar 2023 - Mar 2024
      Risk and Safety Engineer
    • MES

      May 2024 - now
      Risk, Safety & Reliability Engineer
  • Licenses & Certifications

    • Diploma in Fire and Safety

      Acharya Nagarjuna University
      Sept 2021