Jd Tripathi

Jd Tripathi

Highway Engineer

Followers of Jd Tripathi464 followers
location of Jd TripathiRanchi, Jharkhand, India

Connect with Jd Tripathi to Send Message

Connect

Connect with Jd Tripathi to Send Message

Connect
  • Timeline

  • About me

    DGM Civil at Larsen & Toubro

  • Education

    • Insititution of engineers(India)

      2000 - 2006
      Bachelor of Engineering (BE) Civil Engineering CGPA-6

      Activities and Societies: Table Tennis I enrolled for Associate Member Institution Of Engineers (I) Kolkatta

    • Govt. Polytechnic Azamgarh

      1993 - 1996
      Diploma in civil engineering Uttar Pradesh Technical Board, Lucknow Civil Engineering First Division 75.3%

      Activities and Societies: Debate team, Table tennis, volleyball Debate Team, Table Tennis , Institution Topper

  • Experience

    • Mittal Estates Pvt. Ltd.

      Aug 1996 - Dec 2000
      Highway Engineer

      Site engineer to Sr. Engineer- Engaged on construction site; Road/highways, oily waste supply line; and reported to Project manager.• Duties entailed layout, level, site supervision, testing, material requirement schedule, daily report, Quality control, Sub-contractor billing.

    • Rajiva kumar and associates

      Jan 2000 - Dec 2006
      Resident Engineer

      Estimator to Resident Engineer- Successfully managed small local and outside multi-storeyed /High rise building projects to various Govt. Department; Collect orate building and Type residences for PWD Bageshwar, Uttarakhand, Govt. Allopathic Medical College, District-Kanauji, UP (UPRNN Ltd.), Madhyamic Shiksha Chayan board Allahabad (B+G+3), College of fisheries , Horticultural , Bio-diversity for NDAU Faizabad, Tehsil Buildings (10 nos) at various places in UP (UPPCL),PHC/CHC Building for Health Department , Residential Buildings /offices for Home department, Commercial complex for (JDA, BDA, GDA), Institutional buildings for Education department. Shubhkamna guest house/apartment (10- storey) at Lucknow, Commercial and residential apartment (7-storey) at Jaunpur. Water supply scheme & 500KL OHT, 20 M staging Faizabad police line (UPPC Ltd. ) • Duties entailed Detailed Estimation/DPR, rate analysis, BBS, Bid packages, material procurement, reviewing contracts, and preparing action list for field engineers, Site supervision; and Reported to Architect. Show less

    • Maytas infra

      Jan 2007 - Dec 2007
      Assistant Manager

      Assistant Manager- Construction of Township DG MAP Lucknow (109 Nos Dwelling units for Major and above), Sewerage system, Storm water drainage system, Rain water harvesting system, 350 KL , 16.0 M staging OHT, Water supply system, Campus flexible pavement Road.• Duties entailed Arranged Resources (Manpower, Machinery, and Subcontractors), site supervision, testing, material procurement consignment, Quality control & Quality assurance• Sub-contractor billing, Action list for field engineers, Daily report ; and Reported to Project Manager. Show less

    • Brahmputra Infrastructure Ltd.

      Dec 2007 - Aug 2009
      Project Manager

      Project Manger- Managed construction of New Integrated Passenger Terminal Building, AC Plant, DG Substation building, Public utilities, and Rigid Pavement Road, Parking, Specialised vendors, 500 to 750 dia., 18.0 M depth pile foundation, Fabrication and Erection of Portal Frame; while supervised all aspects of subcontractors, specialised vendors, PRW, and responsibilities including were; • Managed projects in all phases, since conception; and completed all structure and finishing works; coordinated project and managed sites; oversaw the superintendent, field engineers, foreman, while ensuring quality assurance and compliance to all safety, and government regulations.• Ordered materials, negotiated subcontractors, sourced manpower, created schedules, • Attended progress review meeting, Implemented agreed tasks in essential with Time and costs.• Managed site construction quality within budget and scheduled targets against agreed upon performance measures in all key aspects such as safety, environment, cost, schedule, and quality. • Worked closely with subordinates and field engineers regarding constructability, timing, costs, and quality; reviewed performance against operating plans weekly basis; and reported to corporate office.• Conducted Initial and Routine testing of piling. Show less

    • Hydroair Techtonics (PCD) Ltd.

      Aug 2009 - Aug 2012
      Project Manager

      Project Manager-Managed project Survey , Design , Construction , Commissioning , Trial Run-Testing , Sewerage System (Pipe line NP3/PSC/HDPE/GRP/FRP) , Allied Sub-Station Buildings , Residential Quarter , Campus Development , Roads, Storm Water Drainage System , 50 KL OHT, Uner-reamed pile foundation 400 dia. 12.0m depth -6000 nos; of 345 MLD Sewerage Treatment Plant based on UASB Technology at Lucknow; while supervised all aspects of subcontractors, specialised vendors, PRW, and responsibilities including were; Show less

    • ERA INFRA ENGINEERING LIMITED

      Sept 2012 - Jun 2013
      Project Manager

      Construction of Institutional Buildings for BHU.

    • Triveni Engineering & Industries Limited

      Jun 2013 - Apr 2016
      Project Manager

      Managed construction of Industrial Water Treatment Plant for NTPC VSTPP Singaurali MP

    • ABE

      Apr 2015 - May 2018
      DGM projects

      Medical college and Hospital, Engineering college and complete campus development, water supply, sewerage system, Firefighting, ETP,STP, BMS ,HVAC etc. Independent incharge of 2nos Medical college and Hospital, Engineering college and 3 now Hospital.

    • Larsen & Toubro

      Jun 2018 - Jun 2018
      Sr. Construction Manager

      Integrated Infrastructure Project ABD area of Udaipur. This include WTP, RWPS, Water supply and sewerage system.Integrated Development Ranchi Smart City .

    • Larsen & Toubro

      Jun 2020 - now

      As a project head handling integrated infrastructures works includes large scale road , SWD , Power distribution, Sewerage network , potable water supply network , recycle water network, orboriculture irrigation by using recycling water, STP, Reservoirs ,

      • Project Manager

        Jun 2018 - now
      • Project Manager

        Jun 2020 - Aug 2022
  • Licenses & Certifications

    • Diploma in civil engineering

      The Institution of Engineers (India)
      Jun 1997
      View certificate certificate