Bashir Shaikh

Bashir Shaikh

QC Inspector

Followers of Bashir Shaikh235 followers
location of Bashir ShaikhMumbai, Maharashtra, India

Connect with Bashir Shaikh to Send Message

Connect

Connect with Bashir Shaikh to Send Message

Connect
  • Timeline

  • About me

    QA- QC WELDING INSPECTOR AT BOMBAY AMUSEMENT RIDE (P)LIMITED

  • Education

    • B I T inspection & technology

      2013 - 2013
      AWS-CWI QC Inspector
    • BHIDE INSTUTE OF NON DISSTRUCTIVE TESTING

      2013 - 2013
  • Experience

    • GEECY industrial services Pvt ltd

      Sept 2009 - Nov 2012
      QC Inspector

      GEECY industrial services Pvt ltd is Third Party Inspection Agencyconducting all method of NDT for Marine Industries & Offshore Structural job. Client: Larson & Tubro LTD (Hajira Gujarat) Job Responsibility:1. Inspection of materials2. Review all applicable drawings & standards.3. Check the welding procedure and welder qualification.4. Coordinate with inspection Engineer and third party inspection.5. Monitoring during the process of welding6. Checked the welding (structural / Piping) as per drawings and specification.7. Follow the WPS for pre and post heat treatment and maintained the during temperature 8. Mark the location repair on welded joints as indicated in NDT9. UT, MT & PT Inspection carried out on weld joint & prepares the reports.10. Radiographic film evaluation of weld. Show less

    • Sigma institute of welding and services

      Jan 2013 - Apr 2014
      QA QC Inspector (Welding/Mech)

      Sigma institute of welding and services isThird Party Inspection AgencyRoles and responsibility:-Worked with following Clients as a Third Party Inspector / Q.C Inspector (Mech/ Welding) Client : 1) Oil and Gas Corporation limited (ONGC) : Hajira Gujrat.( Refinery Plant )• In-Process Inspection of Fabricated Equipment’s.- Pressure Vessels of Stainless Steel, mild steel & Carbon Steel.- Heat Exchangers- Shell & Tube type.- Vessels with Jacket & External Limpet Coil.- Reactor, LPG Bullet, Pressure Filter, etc.• Preparation and qualification of welding procedure for carbon, Al alloys, Low alloy and Stainless steel materials.• Review the entire material and MTC and Documentation as per Quality plan & specification and given Dispatch clearance for finished Product.• Monitor Welders performance and to ensure that they performed with the limits of their qualifications.• To carrying out Inspection before Welding, during Welding and After Welding in accordance with ASME B31.3 (Process Piping )• Witnessing PT, UT, MPT & Interpreting RT Films.• To check the PWHT requirement of joints and to witness during PWHT.• Preparation Of documents for equipment’s & stage wise Inspection reports.• Inspection of Hydro testing in vessels, piping & pressure vessels.2) S.V.Tank& Vessels Ltd, New Mumbai. :- Manufacturing and Supplying Turnkey Project Distilleries, Pharmaceutical Plant and Chemical Process Plants. 3) SulzerIndia : Pune - pressure vessels, Heat exchanger, tank, manufacturer. 4) MECh Engineers: Valsad (Gujarat):- Pressure vessels, reaction vessels, autoclaves, heat exchanger, distillation columns manufacturer Show less

    • Bombay Amusement Ride (P) Limited

      Apr 2014 - now
      QA QC Inspector (Mach/ Welding) & Quality Head

      Bombay Amusement Ride(p) Limited is manufacturing company involved in the manufacturing of "Amusement Rides "and "Heavy Structural steel fabrication".Roles and Responsibility1. Establish a system as per ISO 9001-2008.2. Establish a system to meet the requirements of AWS Certified Welding Fabricators as per AWS5.17.3. Carrying out Inspection before Welding, during Welding and After Welding.4. Preparation of WPS, PQR and WPQT as per given codes and standard. 5 NDT testing like Ultrasonic testing, Radiographic testing, Magnetic Particle Inspection and Liquid Penetrant testing are done as per procedure to be insure with Witnessing PT, UT, MPT & Interpreting RT Films. Review reports for the same. 5. To ensure that all the welding and fabrication is performed as per the specification AWS for structural steel fabrication. (D1.1) .6. Well versed with IS and ASTM standards and specifications.Achievements in Bombay Amusement.1. Successfully completed external audit for ISO 9001-2008 and achieved ISO 9001-2001 certification.2. Successfully completed external Audit for AWS Certified Welding Fabricators, established a system as per AWS5.17, and achieved AWS Certified Welding Fabricator certification. Show less

  • Licenses & Certifications

    • NCTVT-WELDER

    • DME -Mechanical

      Mumbai University Mumbai
    • ITI-welder

      Government Industrial Training Institute - India
    • AWS-CWI, ASNT level 2 in -LPT,MPI, UT, RT (INTERPRETATION)

      American Welding Society