Sariful Alam

Sariful Alam

Assistant Engineer

Followers of Sariful Alam24 followers
location of Sariful AlamQatar

Connect with Sariful Alam to Send Message

Connect

Connect with Sariful Alam to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at Al wakrah,Doha ,Qatar

  • Education

    • IIEST, Shibpur

      2007 - 2011
      Bachelor of Engineering (B.E.) Civil Engineering
    • Bengal Engineering and Science University, Shibpur

      2007 - 2011
      Bachelor of Engineering (B.E.) Civil Engineering

      Bachelor of Engineering in Civil

  • Experience

    • SIMPLEX INFRASTRUCTURES LIMITED

      Jul 2011 - Nov 2012
      Assistant Engineer

      As Assistant ENGINEER I was working as an Assistant engineer at Assam Road Package (Udalgiri-Rowta), (C-2686) of SIMPLEX INFRASTRUCTURES Ltd, client APWD Project Summery (Road Project) Rowta - Udalgiri Road Project.It is a 12.5 km Long Road. It Consists 25 nos. culvert,6 nos. bridge & 48 nos. 1200 mm diameter cast in situ Bore Pile Job responsibilities handled:  PREPARATION OF BAR BENDING SCHEDULE  SITE EXECUTION WORK. PLANNING FOR SITE WORK  BILLING AND ESTIMATING QUALITY CONTROL VIZ.CUBE TESTING,SIEVE ANALYSIS ETC Project Value : 51 Crores Period of Work : July’11 to November’12 Show less

    • Kaizer construction co. Ltd

      Dec 2012 - Sept 2015

      Project Summary (Industrial Project) The Project consists of two parts, Food Processing Plant and Feed Plant. A.Food Processing Plant [Amrit Site] 1. Chicken Processing Store. 2. Chicken Processing Office Building, 3. Boiler Building, 4. Chicken Processing Main Plant, 5. Compound Wall, 6.under Ground Water Tank, 7. Substation building, 8 .Refrigeration block, 9.ETP B.Feed Plant [Amrit Site] 1. Feed Store, 2. Silo (5500T, 3 nos and 1500T, 8 nos), 3. Feed Main Plant, 4. Godown cum Ware House, 5. Office Building, 5. Ancillary Building, 6. Compound Wall 8. Under Ground Water TankC.Main processing Unit.[Krishna tissues Site] 1. Main processing building (250M x 45M), 2.Palm building, D.Others Unit [Krishna tissues site] 1. Overhead water tank, 2.Store room, 3.600mm dia cast in situ pile (1200 nos), 4.BoilerE. Etc Agro processing [Kolkata Site]1. Silo (6600T-3nos, 5000T-2nos and 1500T-6nos), 2.Vatana Unit, 3.MMU building, 4.Staff building, 5.Labour quarter. 6. Weigh bridge. Job responsibilities handled:  PREPARATION OF BBS,BILLING,ESTIMATING ETC  SITE EXECUTION /MONITORING PLANNING FOR SITE WORK  SURVEYING AND LEVELLING,QUALITY CONTROL VIZ. SIEVE ANALYSIS,CUBE TESTING OF FLAKYNESS AND ELONGATION TEST ETC LIAISONING BETWEEN CLIENT AND CONSULTANT. PERIOD OF WORK: DECEMBER’12 TO SEPTEMBER’15 Show less

      • Senior Civil Engineer

        Dec 2012 - Sept 2015
      • Sr. Civil Engineer

        Dec 2012 - Sept 2015
    • Al wakrah,Doha ,Qatar

      Oct 2015 - now
      Project Engineer

      Project execution.Liaisoning between client and consultant.

    • SIMPLEX INFRASTRUCTURES LIMITED

      Oct 2015 - now

      AS PROJECT ENGINEER Presently, I am working as a Project engineer at Al-Wakrah, Doha, Qatar for UMM- AL- HOUL IWPP (Power plant) of SIMPLEX INFRASTRUCTURES Ltd, client Samsung C&T Project Summary (Power plant Project) A. Power Block 1. Gas Turbine and Generator Foundation, 2.Gas Turbine building, 3.Steam Turbine Generator Foundation, 4. Steam Turbine building, 5.Local Electrical Building, 6.Transformer 7.HRSGJob responsibilities handled:  PREPARATION OF BBS. ESTIMATING. SITE EXECUTION / MONITORING  PLANING AND CONTROLLING THE MANPOWER  LIAISONING BETWEEN CLIENT AND CONSULTANT. PLANNING FOR SITE WORK Period of Work: 22nd October to till now Show less

      • Project Engineer

        Oct 2015 - now
      • Project Engineer

        Oct 2015 - now
  • Licenses & Certifications

    • Bachalor of civil engineering

      Bengal engineering and science university,shibpur