GERARDO MANALAOTAO

GERARDO MANALAOTAO

ELECTRICAL SUPERVISOR

Followers of GERARDO MANALAOTAO331 followers
location of GERARDO MANALAOTAOUnited Arab Emirates

Connect with GERARDO MANALAOTAO to Send Message

Connect

Connect with GERARDO MANALAOTAO to Send Message

Connect
  • Timeline

  • About me

    Electrical Supervisor at INDUSTRIAL MAINTENENCE INTERNATIONAL LTD.

  • Education

    • Bataan Peninsula State University formerly (BNSAT )

      1981 - 1985
      BSIEd. Machine Shop Technology
  • Experience

    • JAL International Limited

      Mar 2003 - Apr 2008
      ELECTRICAL SUPERVISOR

      SAUDI ARAMCO RIYADH REFINERY PROJECT JAL INTERNATIONAL, Kingdom of Saudi ArabiaELECTRICAL FOREMAN- ASSIGNED AS ELECTRICAL FOREMAN AND WORK PERMIT RECEIVER FOR THE REPLACEMENT OF OBSOLETE 4.16KV AND 480V SWITCHGEARS AND CONTROL GEARS IN SUBSTATION # 15 & 24• Demolition of existing 13.8KV isolator switches of power transformers, Neutral Grounding Resistors (NGR), 4.16KV and 480V switchgear and Control gears, Bus duct , Battery chargers 1 & 2, and Annunciator Panel.• Installation of new 4.16KV & 480V Switchgear and Control gears, Cable Bus, Battery Chargers 1 & 2, 480V Automatic Transfer Switch (ATS), 480 Emergency Panel, DCDB Panel, Space Heater Panel, Neutral Grounding Resistors of Power Transformers, and Power Monitoring System (PMS) Panel.• Cable Laying, Loop Checking, Meggering, Hi-Pot Testing, Termination of Power, Control and Fiber Optic Cables.• Testing and commissioning of newly installed Electrical Equipments.• Responsible for deployment of the daily activities and accomplishments which to be submitted and also prepare daily time record and accomplishment reports.• Observes closely to good housekeeping practice as well as to safety rules and regulations of the company and client. Show less

    • SIDEM SAUDI LTD.

      Jul 2008 - Sept 2011
      ELECTRICAL SUPERVISOR

      • Supervised installation of (34.5KV TO 4.16KV,34.5KV TO 480KV, 13.8KV TO 480KV) transformer, switchgears, control gears, bus duct, battery charger, 480V emergency switchgear, DCDB panel, space heater panel, distribution panel, neutral grounding resistors of power transformer, ups , battery rack and cable tray• Monitors the performances of subcontractors manpower assigned.• Monitors directly the performance of the subcontractor in terms of quality, quantity, efficiency and effectiveness including concerned suppliers.• Responsible for certain areas of construction activities as designated by the Project Engineer.• Reports any non-compliance activities on designated areas.• Follows up corrective and preventive actions and evaluates their effectiveness.• Direct subcontractors on site prioritization and requirements and prepares report accordingly.• Attends progress meeting as required.• Receives instruction from Project Engineer with regards to day-to-day construction activities, prioritization and targets. Show less

    • SAMSUNG ENGINEERING ( M ) SDN.BHD.

      Oct 2011 - May 2013
      ELECTRICAL SUPERVISOR

      • Review and familiarized the IFC drawing prior for cable pulling, installation, termination subject for inspection of QC, supervise and sub-contractor of their daily activities on everyday• Check on proper installation of the electrical equipment and component on site.• Preparation of various activities during the development and execution of project.• Determine material specification, supervise, witness and accept the sub-contractor and vendor scope of work.• Supervise the installation of the electrical equipment, cable tray, cabling and testing during the execution period.• Coordinates with other discipline for the crossing activity.• Preparation the weekly and monthly execution plan and report the progress.• Request to the balanced quantity take off from the IFC drawing.• Monitoring the sub-contractors progress and expedite the work performance.• Supervise and ensure that all installation shall be made by skilled in their particular trade and shall be made in accordance with project specification and standard.• Preparing the as built drawing during execution period.• Computer literate.• Submits daily and/or weekly report . Show less

    • Samsung Engineering Co., Ltd.

      Jul 2013 - May 2014
      ELECTRICAL SUPERVISOR

      Nitrogen Gas Injection ( Pure Case ) Project

    • HANWHA ENGINEERING & CONSTRUCTION

      Sept 2014 - now

      • Review and familiarized the IFC drawing prior for cable pulling, installation, termination subject for inspection of QC, supervise and sub-contractor of their daily activities on everyday• Check on proper installation of the fire alarm devices,conduits,modules and component on site.• Preparation of various activities during the development and execution of project.• Determine material specification, supervise, witness and accept the sub-contractor and vendor scope of work.• Supervise the installation of the GSP,SFP,MASTER FIRE ALARM,POWER DISTRIBUTION PANEL,conduiting, cable tray, cabling and testing during the execution period.• Supervise loop checking and testing prior for the energization of the Panel.• Supervise the pre-commissioning and clearing of alarms and troubles in the Fire Alarm system Panel.• Coordinates with other discipline for the crossing activity.• Preparation the weekly and monthly execution plan and report the progress.• Request to the balanced quantity take off from the IFC drawing.• Monitoring the sub-contractors progress and expedite the work performance.• Supervise and ensure that all installation shall be made by skilled in their particular trade and shall be made in accordance with project specification and standard.• Preparing the as built drawing during execution period.• Computer literate.• Submits daily and/or weekly report .• Promote health and safety habits to everybody • Permit Receiver – KNPC Approved Show less

      • Electrical Supervisor

        Sept 2014 - now
      • ELECTRICAL SUPERVISOR

        Sept 2014 - Jun 2015
    • INDUSTRIAL MAINTENENCE INTERNATIONAL LTD.

      Nov 2015 - now
      Electrical Supervisor

      • Review and familiarized the IFC drawing prior for lighting , cable tray, cable pulling, termination and panel installation subject for inspection of QC.• Check on proper installation of the electrical equipment and component on site.• Preparation of various activities during the development and execution of project.• Determine material specification to be install at site.• Supervise the installation of the electrical equipment, cable tray, lighting, cabling, termination and testing during the execution period.• Coordinates with other discipline for the crossing activity.• Preparation the weekly and monthly execution plan and report the progress.• Request to the balanced quantity take off from the IFC drawing.• Supervise and ensure that all installation shall be made by skilled in their particular trade and shall be made in accordance with project specification and standard.• Preparing the as built drawing during execution period.• Computer literate.• Submits daily and/or weekly report .Promote health and safety habits to everybody Show less

    • Industrial Maintenance International LTD.

      Nov 2015 - now
      Electrical Supervisor

      • Review and familiarized the IFC drawing prior for lighting , cable tray, cable pulling, termination and panel installation subject for inspection of QC.• Check on proper installation of the electrical equipment and component on site.• Preparation of various activities during the development and execution of project.• Determine material specification to be install at site.• Supervise the installation of the electrical equipment, cable tray, lighting, cabling, termination and testing during the execution period.• Coordinates with other discipline for the crossing activity.• Preparation the weekly and monthly execution plan and report the progress.• Request to the balanced quantity take off from the IFC drawing.• Supervise and ensure that all installation shall be made by skilled in their particular trade and shall be made in accordance with project specification and standard.• Preparing the as built drawing during execution period.• Computer literate.• Submits daily and/or weekly report .Promote health and safety habits to everybody Show less

  • Licenses & Certifications

    • Certificate of employment