Carlos Wang

Carlos Wang

Followers of Carlos Wang492 followers
location of Carlos WangTaipei, Taipei City, Taiwan

Connect with Carlos Wang to Send Message

Connect

Connect with Carlos Wang to Send Message

Connect
  • Timeline

  • About me

    Substation Civil PE / WTG Deputy Site Manager / WTG Quality lead / FDN Client Rep

  • Education

    • 國立成功大學

      2006 - 2010
      Bachelor's degree Civil Engineering 84

      Activities and Societies: 中友社

    • 國立成功大學

      2010 - 2012
      Master's degree Civil Engineering
  • Experience

    • 中鼎工程股份有限公司

      Apr 2014 - Dec 2018

      Structural Design Engineer mainly responsible for structural design works associated with petrochemical and power plants including: Saudi Kayan Furnace 10 Project Structural Design Engineer responsible for: Designing the main revamping structure.  Resolution of numerous technical challenges, including pipe rack extensions, integration of existing and new structures.  Development of tender documentation, invitations to bid and specifications.  Trouble shooting all interface work with all other packages. Saudi Arabia Yansab FEED POW Project Structural Design Engineer responsible for: Collecting information on petrochemical plant soil and existing structural profiles, and preparing rack drawings.  Preparing 3D models to ensure all designs had no interface conflict.  Developing the feasibility study report and identifying the best pipeline routes. Show less

      • Civil Engineer

        Apr 2014 - Dec 2018
      • Structural Engineer

        Apr 2014 - Dec 2018
    • GE Renewable Energy

      Apr 2019 - Oct 2019
      • Site Engineer

        Dec 2018 - Oct 2019
      • Site Manager

        Apr 2019 - Jul 2019
    • C&C solution.,Ltd

      Oct 2019 - now
      General Manager & Civil PE
    • Formosa 2 海能風力發電

      Oct 2019 - Sept 2021
      F2 OWF Onshore Lead Civil Engineer

      Onshore Package Lead Civil Engineer:  Developing the Investigation Report for analysis of the impact of 161kV Cable Duct Route cross through all Miaoli Agriculture Association (MAA) ditches.  Managing the engineering consultant (Sinotech), to ensure the suitability of the substation design of all civil, mechanical and electrical interfaces.  Leading the Civil and Structural Design of the Onshore 161kV/69kV Substation.  Supporting quality team on quality inspection, design change and NCR tracing. Show less

    • Formosa 2 海能風力發電

      Jun 2022 - Dec 2024
      F2 OWF WTG Deputy Site Manager/ Quality Lead / Civil PE

      WTG Deputy Site Manager:  Managing the supervision of the preassembly site activities, encompassing progress reporting, quality, HSE and interface work to ensure that the progress of the preassembly site progress does not delay the installation vessel load-out activities.  Planning and coordinating the installation and commissioning of offshore wind turbines in close cooperation with the Transportation & Installation Package.  Conducting site visits to oversee and support the installation activities, ensuring adherence to safety regulations and project timelines.  Troubleshooting and resolving any issues that arose during the commissioning phase, working closely with cross-functional teams and contractors. WTG Quality Lead:  Managing five quality team members based at the preassembly and offshore sites.  Overseeing the WTG pre-assembly process, including quality control and adherence to design specifications.  Ensuring SGRE adhered to approved quality procedures and checklists during installation.  Identifying non-conformities during the final walkdowns and ensuring thorough inspection, monitoring, and documentation undertaken. WTG Interface Engineer:  Managing the interface between TIPC, the WTG supplier (SGRE) and the Foundation Supplier (JDN), including acquisition of the road permit for WTG component transportation between quaysides.  Managing the provision of the offshore genset commissioning with Genset Company (MRE), including planning CTV operations.  Managing the Offshore Interface Trouble shooting activities for 8VM1 switchgear, davit crane commissioning, tower ladder gaps, foghorn, and AIS systems, including planning CTV operations.  Coordinating the interfaces associated with the EBL permit acquisition, and delivering the final O&M handover documentation. Show less

    • Formosa3

      Jul 2023 - Jun 2024
      WTG Interface/Project Engineer

       Preparing contract requirements and reviewing technical specifications for offshore wind turbine systems. Managing and coordinating the Iterative Load Assessment (ILA) design process in collaboration with the WTG Foundation Team and the WTG Foundation Designer. Collaborating with interdisciplinary package teams, including electrical, foundations, subsea cables, and control systems, to ensure comprehensive design integration. Evaluating appropriate materials, components, and systems for offshore wind turbines with respect to cost, performance, and environmental factors. Managing the interfaces with other works packages to ensure the adoption of fully integrated support systems with high reliability throughout the operational life of the wind turbine generators. Prioritizing and ensuring that “Safety by Design” considerations are met throughout the design process. Show less

    • Greater Changhua Offshore Wind Farms

      Dec 2024 - now
      FDN Client Representative
  • Licenses & Certifications

    • ISPS Port Facility Security Officer

      中國驗船中心
      Nov 2022
    • Licensed Professional Civil Engineer (Taiwan 土木技師)

      Public Construction Commission, Executive Yuan 行政院公共工程委員會
      Apr 2016
      View certificate certificate
    • PMP - Project Management Professional

      Project Management Institute
      Nov 2020
      View certificate certificate