Ardie Yap

Ardie Yap

Electrical and Instrumentation Engineer

Followers of Ardie Yap235 followers
location of Ardie YapTabuk Region

Connect with Ardie Yap to Send Message

Connect

Connect with Ardie Yap to Send Message

Connect
  • Timeline

  • About me

    MEP- Electrical Engineer at Nesma Water and Energy

  • Education

    • Eastern Visayas State University

      1999 - 2004
      Bachelor’s Degree Electrical Engineer

      Activities and Societies: Campus Band Member

    • Jose Navarro Polytechnic College

      1992 - 1994
      Associate’s Degree Nursing Assistant/Aide and Patient Care Assistant/Aide Very Good
    • Eastern Visayas State University

      1999 - 2004
      Bachelor of Science in Electrical Engineer Electrical Engineer 1.5
  • Experience

    • Inter Conglomerates Inc.

      Apr 2004 - Feb 2006
      Electrical and Instrumentation Engineer

      Responsible for the Supervision of Electrical site Works and Instrumentation site works.a. Installing Electrical and Instrument cable trays, race ways and conduitsb. Cable Routingc. Cable Pullingd. Cable Glandinge. Insttalling Electrical Panels and Instrument devicesf. Cable Termination Responsible for Supervision Pre‐Commissioning Testinga. Meggering of Power cables and Control cablesb. Trip test of circuit breakers and functional testc. Solo run test motors d. Relay testing and relay settingsResponsible for Data review and visual inspection on all semi‐ conductors.Coordinating with the Electrical Foreman, Electrical Technician and Instrument Technician to ensure the accuracy of works. Show less

    • Saudi Arbian Kentz

      Dec 2007 - Dec 2009
      Electrical Supervisor

      Responsible for Supervision of Electrical and Instrument Field works.a. Installing Electrical equipments and Instrumentb. Installing Electrical and Instrument Cable Trays and Conduitsc. Cable Routingd. Cable Pullinge. Cable Glandingf. Cable TerminationResponsible for Supervision Pre‐Commissioning Testing.a. Meggering of Power cables and Control cablesb. Trip test of circuit breakers and functional testc. Solo run test motorsd. Relay testing and relay settingsResponsible for Data review and visual inspection on all semi‐ conductors.Coordinating with the Electrical Foreman, Electrical Technician and instrument technicians to insure the accuracy of work. Show less

    • BT Applied Technology

      Jun 2010 - Sept 2016
      Engineer II

      DUTIES AND RESPONSIBILITIES :• Responsible for supervising electrical and low current system site field works from first fix to third fixes untill commissioning and project final handing over. First Fix• Installation of cable trays, race ways and electrical metalic tubing (EMT)pipes and boxes.Second Fix• Cable Routing• Cable PullingThird Fix• Installation of electrical panels MDP, MCP, ELP, EDP and UPS power panels.• Installation of all devices and low current panels.• TerminationsCommissioning• Responsible for the supervision of all system in preparation for configurations.- Structured Cabling System - Fire Alarm System- Bollard- Public Address System - Audio Visual System - Access Control System - IP Telephone System- Close Circuit Television (cctv’s) - Emergency Blue Stations- Master Clock System- Indoor and Outdoor Wireless Access Points- Time Attendance and Scheduling System• Do preliminary inspection on finished work on site and make recommendation as per required standards.• Make a reports on the actual progress and problems encountered on the work site.• Coordinate with other construction trades working at the same site for problems conflicting work issues that needs clarification.• Study and analyze quality standards as a requirement for any system regarding low current system from they should be followed quality standard to actual work existing in construction site. From first fix to final fix up to testing and commissioning.• Make As-built for all System• Monitor comments from the consultant will be followed and completed at its due deadline. Show less

    • Nesma Water and Energy

      Aug 2017 - now
      MEP- Electrical Engineer, Maintenance Engineer

      Waste Water Treatment Plant Operation and Maintenance :•To provide leadership to the Electromechanical maintenance team in day to day maintenance activities.•To develop and coordinate plant maintenance activities.•To plan and inspect completed work on plant equipment.•To maintain records, prepare technical reports and compose correspondence relative to work.•To acquire considerable knowledge of the process and relevant electrical, mechanical and instrument.•To train the subordinates on preventive, corrective maintenance or other trainings required by the company.•To asses plant needs for spare parts and supplies and generate material requisition.•Report any repaired that requires material or design change or any engineering evaluations.•To assign preventive and corrective maintenance jobs to maintain technicians as per direction of Maintenance Project manager.WATER TREATMENT PLANT ( Reverse Osmosis ) MEP- MODON Project Site Construction:•Performs complex engineering task particularly important Electrical and Mechanical engineering works efficiently and accurately.•Prepares engineering computations, material quantity take-offs, estimates, surveys, and design.•Prepares detailed requisition for Tools, equipment's and materials.•Performs other responsibilities associated with my position as appropriate.•Ensure all drawings, materials to be used in construction site is submitted and approved by the consultant.•Responsible for coordination of the sub-contractors.•Do initial inspection with the sub-contractors on site before submission for the field inspection request to the consultant.•Monitor status of inspections and follow up on actions for re-submission, ensuring all the required completed prior to re submission.•Safety Awareness and follow safety procedures as implemented in the site.•Responsible for handling over the project and for all site work activities until final Testing and commissioning. Show less

  • Licenses & Certifications

    • Certificate of Employment