Vamsi Gopala Krishna Doddipatla

Vamsi Gopala Krishna Doddipatla

Mechanical Engineer - Fabrication

Followers of Vamsi Gopala Krishna Doddipatla419 followers
location of Vamsi Gopala Krishna DoddipatlaNoida, Uttar Pradesh, India

Connect with Vamsi Gopala Krishna Doddipatla to Send Message

Connect

Connect with Vamsi Gopala Krishna Doddipatla to Send Message

Connect
  • Timeline

  • About me

    Project Engineering Manager at GE POWER INDIA Ltd

  • Education

    • VT Junior college, Rajahmundry

      1993 - 1995
      Intermediate MPC
    • S K V T EM HIGH SCHOOL, RAJAHMUNDRY

      1992 - 1995
      8TH TO 10TH CLASS
    • University of Madras

      2001 - 2003
      Engineer - Centrifugal Fan Fabrication Turbovent Industries Pvt Ltd
  • Experience

    • TURBOVENT INDUSTRIES PRIVATE LIMITED

      May 2001 - Jun 2003
      Mechanical Engineer - Fabrication

      Key responsibility areas with M/s. Turbovent Industries Pvt. Ltd.  Supported the team for Manufacturing of Blowers & Centrifugal fans for Power, Steel, Cement, Oil & Gas customers for different applications. Planning the sequence & schedule, Study the drawings & Assigning the job to workers Stage Wise Inspection -Of Semi-Finished & Finished Jobs Maintaining the Route Card & Machining Time Charts. Inspection of Welded Joints - Die Penetrate Test Assembling of blowers & centrifugal fans. Show less

    • Rotodyne Engineering Services pvt Ltd

      Jun 2003 - Jul 2005
      Sr.Engineer - Turbine Overhauling

      Key responsibility areas with M/s. Rotodyne Engineering Services Pvt. Ltd.  Handled several projects for Overhauling of Steam Turbine-Generator (STG), Gear Boxes, Screw Compressors for Oil & Gas, Thermal Power Plants. Site preparation - manpower planning, Cost estimation for execution of site.Drawing the bar chart - sequence of operations & time schedule. Tools & tackles requirement. Assigning job to individuals. Taking alignment & flow path readings. Preparing site report. Customer interactions. Reporting directly to head office. Overhauling Projects handled:1. Wet gas compressor at Indian oil ltd. Mathura refinery.2. WGC at Indian oil ltd Gujarat refinery.3. 24.5MW TG set trouble shooting at NALCO, Damanjodi.4. 18MW TG set at CPCL, Chennai.5. 67.5MW TG set at BALCO, Korba Show less

    • Cethar vessels Pvt ltd

      Jul 2005 - Aug 2008
      Sr.Executive-Boiler Erection

      Key responsibility areas with M/s. Cethar Vessels Ltd. Handled several projects as Site Manager from erection till project completion Study the drawings, planning the sequence of erection & making schedules Managing the contractor and manpower Stage wise inspection & making protocals Customer interaction Reporting to HO about the site activities IBR documentation Contractor billing & ensuring all the site requirements are in placeProjects handled:-1. M/s Usha martin ltd, Jamshedpur - 42tph FBC single drum boiler2. M/s Vasavadatta cements ltd, sedam - 80tph FBC single drum boiler3. M/s Cleancities biodiesel india ltd, vizag - 20tph FBC bi-drum boiler4. M/s Hetero labs ltd,nakkapalli - 20tph FBC bi-drum boiler5. M/s The Andhra pradesh paper millsRajahmundry -105tph FBC single drum boiler Show less

    • GE Power India Limited

      Sept 2008 - now

      Project Engineering Manager: Engineering Schedule preparation Conducting the Kick-off meetings internal groups, with customer & suppliers. Monitoring the project costing, schedule and providing the optimized solution. Supporting Quality team for Root cause Analysis (RCA) for site reported technical issues. Manage & Coordinate Multidiscipline Engineering activities to ensure projects are executed in a safe, efficient, cost effective & Timely manner. Technical coordination with Customer & Suppliers (externally). Conducting lesson learnt & Technical risk review meetings. Engineering Team Management Supporting tendering team as a proposal Engineer - Review tender document and preparing Pre-Bid clarifications, Preparation of Technical offer and submitting the technical proposal to Customer, Tendering BOQ preparation. Presently handling NTPC Rihand Mill R&M (2X210MW) and JSW BF#3 Mill R&M project as Project Engineering Manager Lead Engineer Mechanical component: Releasing the technical specification for all the auxiliaries, technical bid evaluation of vendor offers, engineering drawing reviews, Inspection & performance testing of critical equipment, tendering support, standardization of specifications, Cost -out exercises etc.  Vendor drawings and document review, Checking the layout feasibility for the vendor supplied equipment, reviewing with the Vendor equipment with all the cross functional teams including Civil & Structural teams and providing necessary inputs to them, Review vendor PIDs and preparation of final PIDs to Customers, Vendor QAP review and attending equipment test/ trail runs Initiating the Technical risk assessment meetings at tendering stage and kick off meetings during post order stage. Interaction with Project management, Supply chain management & tendering team during pre & Post order stage Supporting Sourcing team in evaluating new and local vendors conducting Product Qualification Audits. Show less

      • Project Engineering Manager / Lead Engineer-Mechanical Component (Dual Role)

        Sept 2008 - now
      • Project Engineering Manager

        Sept 2008 - now
  • Licenses & Certifications

    • What to Do When There's Too Much to Do (getAbstract Summary)

      LinkedIn
      Sept 2022
      View certificate certificate