Abdulkhaliq Muhammad

Abdulkhaliq Muhammad

Land Surveyor

Followers of Abdulkhaliq Muhammad223 followers
location of Abdulkhaliq MuhammadPakistan

Connect with Abdulkhaliq Muhammad to Send Message

Connect

Connect with Abdulkhaliq Muhammad to Send Message

Connect
  • Timeline

  • About me

    Senior land surveyor at seeking employment oportunities

  • Education

    • PMDC Surveying Institute Khewra

      -
      Surveying certificate Surveying Engineering 80%
    • Government high school haji shah

      -
      Ssc General Studies 76%
    • Surveying certificate

      -
    • Informatics cultural&computer institute shj

      2006 - 2007
      Certificate AUTO CAD EXCELLENT
    • Certificate in Surveying PMDC Surveying Institute Khewra Jhelum.

      1987 - 1988
      Certificate land surveying 80%
    • SSCC High School Completion

      1983 - 1985
      Certificate General Studies 76%
  • Experience

    • Hyundai -hidco j/v

      Nov 1988 - May 1992
      Land Surveyor

      as assistant land surveyor

    • Daewoo Engineering & Construction Co.,Ltd.

      Jul 1992 - Dec 1996
      Land Surveyor

      Project Name : Pakistan motor wayClient : National Highway Authority (NHA) Consultant : National Engineering Services (NES, PAK) Duties and Responsibilities• Topographic survey, road centerline, cross section for check cutting or filling as per profile grade level.• Setting out curves, culverts, retaining walls.• Calculation of levels at super elevation, vertical curves, horizontal and cross slope.

    • Dhabi Contracting L.L.C

      Jan 1997 - Jun 2003
      Land Surveyor

      Project Name : 1= Bada zaid pipe line infrastructure project302 2=Gayathi pipe line line infrastructure project306 Consultant : KEODuties and Responsibilities• Topographic survey, FOR NGL centerline, cross section for check cutting or back filling as per profile grade level.• Setting out for pipe line excavation.pipe line setting out• Construction of pumping station treatment plants and resevrvoir• Calculation of levels , horizontal and cross slope.• Restate of infrastructure Show less

    • Al hamed development&construction llc

      Aug 2003 - Aug 2006
      Land Surveyor

      Project Date : November 2005Project Name: GASCO 3rd NGL Train Project (Abu Dhabi)Client : GASCO Consultant : Snamprogetti Project Description• The Project consisted of four large tanks (two propane & two butane) each with a capacity of 83600 m3 and constructed using steel line with 50 and 80 cm of concrete outer wall and dome roof. Some of the special features incorporate into these tanks include a corrosion monitoring system, heating system, inclinometer system, embedment plates, stair tower, external ladder, 60” flare line, nitrogen line, elevator, ship vapor line 24” main vapor line, main pipe rack line, external monorail wall, plate form and ladder, roof plat form, trumpets in buttress walls, and the post tension tendons in walls.• This project stringently controlled by the Client specification for both quality and safety. Project Name : VIP Terminal Expansion II, Dubai Intl. AirportClient : DCA Dubai Consultant : RMJMProject Name : New Fire Station Dubai Intl. AirportClient : DCA Dubai Consultant : DAR Al HandasahProject Name: Up Town Mirdif Development Package B & D (Dubai)Client : Union Properties Show less

    • Engineering Consultants Group S.A.

      Apr 2007 - Jun 2010
      Senior land surveyor

      Project: CBD29 buildings G+4 IN International cityClient: Limitless Project: mogul3 buildings construction G+4 Discovery Garden

    • Consolidated Contractors International Company

      Apr 2011 - Nov 2013
      Senior land surveyor

      April 2011 – Novemb 2013Consolidated contracting(ccc), Abu Dhabi, UAELand SurveyorProject: Presidential palace wings package Abu dhabiClient: Ministry of presidential Affairs United Arab EmiratesDuties and Responsibilities • Following the shop drawing for civil work.• Attending the progress meeting with consultant.• Controlling the quality of the finishing civil work at site.• Reporting senior engineers P m Show less

    • Khansaheb

      Mar 2014 - Aug 2017
      Senior land surveyor

      March 2014 to Aug2017Land SurveyorProject: Premier inn Hotel construction building works B+G+8STOREY+Gymnasium+roof at plot no 3265612Location Al jadaf dubaiProject Description • Following the shop drawing for civil work.• Attending the progress meeting with consultant.• Controlling the quality of the finishing civil work at site.• Reporting senior engineers

    • Redco International Trading & Contracting w.l.l.

      Jul 2021 - Dec 2022

      consyruction of bus depot

      • Professional Land Surveyor

        Jul 2021 - Dec 2022
      • Senior land surveyor

        Jul 2021 - Oct 2021
    • Werdat al kiram

      May 2022 - now
      Senior land surveyor
  • Licenses & Certifications

    • Engineering And Land Surveying

      Pakistan minral development corporation
    • Autocad 2d/3d

      INFORMATICS CULTURAL&COMPUTER INSTITUTE
      Dec 2007