
Giulio M.
Project Engineer

Connect with Giulio M. to Send Message
Connect
Connect with Giulio M. to Send Message
ConnectTimeline
About me
Chief Operating Officer
Education

University of Naples 'Federico II'
2008 - 2011Ph.D. Civil EngineeringShort-term Visiting Researcher at Mid america Earthquake Center at University of Illinois at Urbana-Champaign,USA

University of Illinois at Urbana-Champaign
2010 - 2010Short-Term Researcher Ingegneria civile
Experience

Astaldi SpA
Mar 2011 - Mar 2012Project Engineer
Astaldi
Mar 2012 - Jan 2014Management of the International Designers and the in House checks and verifications of the entire design: top-down excavation and construction of the stations, ventilation shafts, TBM works (mounting and installation phases, start up and excavation phase), dewatering and consolidation works in order to comply with the agreed Company strategy, defined during the tender phase, and subsequently with the foreseen and expected budget in collaboration with the Project Control Manager and the Planner Manager. Meno dettagli Management of external International Designers and in House verification of the entire design: excavation and construction in top-down of the stations and ventilation shafts, TBM works (mounting and installation phases, start up and excavation phase), dewatering and consolidation works. These activities were also developed focusing on the best strategies and solutions for the project in terms of time, economic and financial costs (budget) and revenues, in collaboration with the Project Control Manager and the Planner Manager. Meno dettagli
Chief Engineer - Metro Line 4 Project (Bucharest, Romania)
Jan 2013 - Jan 2014Deputy Chief Engineer - Metro Line 5 Project (Bucharest, Romania)
Mar 2012 - Jan 2013

Astaldi
Jan 2016 - Jan 2022Since February 2020 I started managing a second project of rehabilitation of the railway line Frontiera- Curtici - Simeria, namely Section 2A, while continuing to manage also Section 2B.The contract related to Section 2A includes the execution of infrastructure/superstructure/architecture/installations and equipment Works (i.e. embankments, bridges, box culvert, viaducts and overpasses, consolidations works, environmental protection works, superstructure, architecture and structural works of the stations, electrical, sanitary and thermo-technical installations, telecommunication, power supply, electrification, etc.) for the railway section between km 611 of the line and Barzava. The works include 4 stations, 12 km of the new line and 29 km of the rehabilitated line, 13 bridges (2 of them overpassing the Mures river). The total length of this segment of the railway line is approximately 41 km. Kindly notice that the works included in Section 2B contract are listed in my previous position of my profile.The cumulated contract value of both projects (FIDIC Red) is approximately 750 million euros. The duration of the works stipulated in the Contracts is 36 months for both Sections. At the moment of my appointment on Section2A the completion rate of the Works was approximately equal to 35%.As Project Manager of both Joint Venture Astaldi – FCC - Salcef – Thales Construct my duties are mainly to ensure the achievement of the cost - quality - time objectives of the Contracts, to govern all the factors of production, to manage the contractual aspects of the Project and the contacts with the Client, the Engineer and the Joint Venture partners, to manage the claiming activities, to represent the Company in the Project. Meno dettagli The contract includes the execution of the infrastructure/superstructure/architecture/installations and equipment Works (i.e. embankments, bridges, box culvert, viaducts and over-passages, consolidations works, environmental protection works, superstructure, architecture and structural works of the stations, electrical, sanitary and thermo-technical installations, telecommunication, power supply, electrification, etc.) for the railway section between Barzava and Ylteu. The works include 3 stations, 27 km of the new line and 9 km of the rehabilitated line, 23 bridges (2 of them overpassing the Mures river). The total length of the railway line is approximately 36 km.The contract value (FIDIC Red) is 379.2 million euros. The duration of the works stipulated in the Contract is 36 months.At the moment of my appointment the completion rate of the Works was approximately equal to 5%.As Project Manager of the Joint Venture Astaldi – FCC - Salcef – Thales Construct my duties are mainly to ensure the achievement of the cost - quality - time objectives of the Contract, to govern all the factors of production, to manage the contractual aspects of the Project and the contacts with the Client, the Engineer and the Joint Venture partners, to manage the claiming activities, to represent the Company in the Project. Meno dettagli The Contract includes the execution of architectural Works/finishing (granite/tiles paving, internal walls, luminium cladding, false ceilings, etc.), electrical, electro-mechanical and hydraulical installations/equipments and railway Works for the new Metro Line 5 of Bucharest. The Works are to be executed in 10 stations, 1 underground maintenance terminal and all the tunnels/galleries connecting them. The total length of the raiway line is approximately 15,5 km.The Value of the Contract (Red FIDIC type) is 164,00 Ml euro + 10% of contingencies. The initial Completion Time for the works was sixteen (16) months, progressively extended due to partial lack of site possession.At the moment of my appointment the completion rate of the Works was approximately equal to 40%.As Project Manager I am the head of the project, my duties being mainly to ensure the achievement of the cost - quality - time objectives of the Contract governing all the factors of production, to manage the contractual aspects of the Project and the contacts with the Client, the Engineer and the Joint Venture partners, to manage the claiming activities, to represent the Company in the Project. Meno dettagli The project (Contract Value: 240 MLN Euro) consists in the execution of the structural works of the first segment of subway Line 5 of Bucharest, including excavation and construction in top-down of 9 stations and 6 ventilation shafts, TBM works (mounting and installation phases, start up and excavation phase of 8 km of tunnel), dewatering and consolidation works, deviation of utilities. At the moment of my appointment the completion rate of the Works was approximately equal to 70%.My duties are mainly to ensure the achievement of the cost - quality - time objectives of the Contract governing all the factors of production, to manage the contractual aspects of the Project and the contacts with the Client, the Engineer and the Joint Venture partners, to manage the claiming activities, to represent the Company in the Project. Meno dettagli
Project Manager - Rehabilitation of the railway line Frontiera- Curtici - Simeria - Section 2A+2B
Feb 2020 - Jan 2022Project Manager - Rehabilitation of the railway line Frontiera- Curtici - Simeria - Section 2B
Jan 2018 - Jan 2022Project Manager - Metro Line 4 Project (Bucharest, Romania)
Jan 2014 - Nov 2021Project Manager - Metro 5 (Bucharest, Romania) - Architectural, intallations and railway Works
Jan 2017 - Jan 2018Project manager - Metro Line 5 (Bucharest, Romania) - Structural Works
Jan 2016 - Jan 2018

Autostrade per l'Italia - Persone
Jan 2022 - Jan 2024Responsabile Grandi Opere
CoMcreta
Jan 2024 - nowGroup Chief Operating Officer
Licenses & Certifications
- View certificate

International English Language Testing System (IELTS). Global Score: 8/9
International English Language Testing System
Languages
- inInglese
- spSpagnolo
- ruRumeno
Recommendations

Oliver staudt
| 🧭 Agile Coach • 🧢 Scrum Master • 💻 Software-Developer || @DB • @Freiberuflich |Frankfurt Rhine-Main Metropolitan Area
Ajetunmobi tobi victor
Chief Executive Officer at Vacationeer || Direct Sales Executive at UBADerbyshire, England, United Kingdom
Jordi bigorra puente
Solution and Bid Manager for Airport Solutions en AmadeusMadrid, Community of Madrid, Spain
Emilia lopes
ESL Teacher / English Teacher for Elementary Schools / Portuguese<->English translator.Recife, Pernambuco, Brazil
Munim ahmed
'Global Champion' NASA Space Apps Challenge 2022 | Business Analyst | UX Designer | Frontend Enginee...Dhaka, Bangladesh
Vidhanshu singh
Software EngineerPune, Maharashtra, India
Chethan u
Associate Analyst - Operations || Post Graduate - Business AnalystBengaluru, Karnataka, India
Adam s. monteforte, cpa, msa
President at ASM, PCDenver Metropolitan Area
Jacqueline grimard
Driving profitable growth using a customer-centric approach | B.A.Sc. Mechanical EngineeringOttawa, Ontario, Canada
Jesus martin
Sr Customer Project Manager at QADBarcelona y alrededores
Fayaz hannan
PMP® Certified | Project Manager at BBSPPenang, Malaysia
Mazin albadri
Business AffairsMuscat, Masqaţ, Oman
Silvia oggero
Test Engineer presso ReerTurin, Piedmont, Italy
Nuraina h.
NOC EngineerBandar Baru Bangi, Selangor, Malaysia
T. alex beres
Executive Director of the Clinton County Port Authority and Wilmington Air ParkWilmington, Ohio, United States
Alen grižonič lesar
Senior Project Engineer at TTTech AutoVienna, Vienna, Austria
Yoseph addisu
Senior Software Developer | Founder | Salesforce Certified AssociateAddis Ababa, Ethiopia
Matthew konrad
Scheduling Manager at VestasCollege Place, Washington, United States
Filippo d'antoni
Film and Media creative and executiveBerlin, Berlin, Germany
Art miller, cic, cpia
Commercial Insurance Agent at Miller's Insurance Agency, Inc.Downingtown, Pennsylvania, United States
...