
Keith Searcy
Carpenter

Connect with Keith Searcy to Send Message
Connect
Connect with Keith Searcy to Send Message
ConnectTimeline
About me
Assistant Project Manager at Story Construction
Education

Pine Ridge Job Corps
2010 - 2011Union Carpentry Pre Apprenticeship Carpentry/Carpenter N/AActivities and Societies: President of the Student Government, Dorm Leader, Honor House Leader I was the General Foreman of the Carpentry Trade from July 2010 until I graduated in April 2011. I was a platinum card holder. I received the honor of Vocational Student of the Year for the year 2010. In November of 2010 and February of 2011 I and 10 other students in the carpentry trade, along with our Instructor, wen to Taos, NM for a total of 7 weeks on the Camino Real National Forest's Ranger Station where we installed roof trusses (including hip and valley jacks), sheathed the roof… Show more I was the General Foreman of the Carpentry Trade from July 2010 until I graduated in April 2011. I was a platinum card holder. I received the honor of Vocational Student of the Year for the year 2010. In November of 2010 and February of 2011 I and 10 other students in the carpentry trade, along with our Instructor, wen to Taos, NM for a total of 7 weeks on the Camino Real National Forest's Ranger Station where we installed roof trusses (including hip and valley jacks), sheathed the roof, installed sub-fascia and soffit, hung drywall, installed windows and doors, insulated, and installed sub flooring. Show less

Muscatine High School
2005 - 20093.0Activities and Societies: I started for the football team all 4 years, including 2 years of starting for the varsity my Junior and Senior year both. I also bowled on our men's bowling team. I recieved my Academic Letter for sustaining a 3.0 or higher for 4 semesters straight.

Kirkwood Community College
2011 - 2013Associate of Applied Science Construction Management 3.9Activities and Societies: USGBC
Experience

Wolfe Contratcting Inc.
Apr 2011 - Jan 2012CarpenterMy job consisted of basic carpentry tasks including steel stud framing (layout, measure/cut, assemble), forming for concrete, pouring concrete (help with pour, screed, and float). I was also very involved with various kinds of demolition, mostly interior walls, CMU wall's and concrete. I completed window, door, and casework installation. I placed a lot of insulation (faced fiberglass bats). Drywall installation was something that was required of me depending on the job specifications (measure/cut, install, and some finishing but was not normally required of me).Equipment operation - Skid Loader, fork truck, scissor lift, truck and trailer, various power tools, 60 lbs. jack hammer, concrete saw, MIG welder. Show less

Frew Development Group
Feb 2012 - Jul 2016My responsibilities while in Salina Kansas included, but were not limited to, the following: - Coordination of construction activities through meetings and correspondence with the owner, design teams, and general contractor or at risk construction manager. - Field supervision of construction activities including delivery and installation of FF&E items. - Schedule and facilitate OAC meetings, budget review meetings, FF&E procurement meetings, and any other miscellaneous meetings required throughout the course of the projects. - Dispute resolution related to discrepancies in the construction documents. - Review project submittals, including shop drawings, for compliance with the project specifications and the Owner's expectations. - Review and processing of RFIs, as well as the subsequently produced ASIs/ITCs. - Produce and distribute change order documentation. - First level review and approval of contractor, architect, engineer, and supplier applications for payments. - Produce RFP and RFQ documents for procurement of equipment and professional services. - Review and tabulation of SOQs and pricing/proposals received through the RFP and RFQ process.Schedule and conduct short list interviews based on the SOQs/proposals that were received. - Create and issue response documents such as notices of award, notices to proceed, notices of negotiation, and notices of non-award to those who were not selected. - Produce monthly construction progress reports. - Weekly photo documentation of construction progress. - Document control in correlation to contracts (bonding and insurance), pay applications, RFIs, ASIs, change orders, work change directives, and submittals. - Coordinate project closeout requirements including review of O&M manuals. - Review and sign off on completed punch-list items. Show less My responsibilities on our project in the Oakwood Beach area of Staten Island was oversight and coordination of all field-work including but not limited to hazardous materials testing and abatement, installation and maintenance of the site specific and property specific storm water pollution prevention plan, securing and boarding up of all acquired properties, installation of pest control measures, utility disconnects, all demolition and debris load-out activities, and all post demolition site work such as rough and final grading. In addition to my in-field supervision responsibilities, I was responsible for documenting all field work via hourly logs and progress photos. I also assisted our team in producing daily and monthly reports outlining the work that had been completed in correlation to the amount of time that had passed. In conjunction with the aforementioned responsibilities, I also played a role in tracking and documenting each property's progress through the permit process. Show less I worked with the Senior and Assistant Project Managers on the Cedar Rapids Convention Center, U.S. Cellular Arena, and Double Tree by Hilton Hotel project helping with communications between us, the contractors, architects, and engineers. I updated the construction documents by implementing supplemental drawings associated with RFI's and ITC's. I also helped document the construction process by performing site walks and capturing photos of various aspects of the work such as demolition, masonry, site work, MEP, steel erection, building envelope, interior finishes, and other various building elements. I organized project specific documentation, such as submittals, which I filed according to the numerous CSI divisions. Another facet of the process that I was responsible for was creating transmittals for material samples (masonry, tile, exterior finish, paint samples, glass, carpet, grout, metal cladding, etc.) and delivering the samples to the necessary parties. Show less
Construction Project Manager/Superintendent
Jun 2014 - Jul 2016Project Coordinator/Superintendent
Nov 2013 - Jul 2014Project Management Assistant
Feb 2012 - Nov 2013

Story Construction
Sept 2016 - nowNew Cedar Falls High School Iowa State University - Gerdin Business Building ExpansionThis project won the MBI Masters Award Project of the Year for the $10 million - $25 million category. Des Moines WRA - Eastside Interceptor Water Treatment Facility Expansion East Penn - Deka Batteries Production and Distribution Facility
Construction Project Engineer
Dec 2020 - nowConstruction Project Engineer
Jun 2019 - Dec 2020Construction Project Engineer
Apr 2018 - Jun 2019Construction Project Engineer
Sept 2016 - Apr 2018
Licenses & Certifications
- View certificate

Procore Certified: Associate
Procore TechnologiesOct 2015 - View certificate

Procore Certified: Associate
Procore TechnologiesOct 2015
Recommendations

Marie halley
Professeure de Physique-Chimie & Formatrice BIABellême, Normandy, France
Ahsan khanani
Paid Ads Specialist | I Help Businesses Get More Clients & Sales Using Meta Ads | Founder @ FOG-19 |...Los Angeles, California, United States
Pallavi sajjanshetty
Learning & Development Executive | Josh SoftwarePune, Maharashtra, India
Deepika sobti
Consultant | Strategist | Storyteller | Culture NerdNew York, New York, United States
Mahmoud abbas
SENIOR ACCOUNTANTالاسكندرية مصر
Dr. tukaram gunale
Process Technologist- Process development and Technology transferBengaluru, Karnataka, India
Regan chong
Hi!Singapore, Singapore
Henning dahl
Project Manager at Consegna Consult, General Manager at Gravstellerne AS and Partner at PerussiViken, Norway
Tiisetso matiwane
O&M Site ManagerDouglas, Northern Cape, South Africa
Mohamed khaled
Civil EngineerDubai, United Arab Emirates
Md mijannur rahman
Wordpress | Ecommerce | Photo EditingBangladesh
Chris patterson
Software Engineer. Last Updated 23 September 2024.Widnes, England, United Kingdom
Gerrit coetzee
Network Engineer at OPS IT Infrastructure LLCدبي الإمارات العربية المتحدة
Hariprasad nair kesavadas ceng micheme
Process Engineer - Blue HydrogenAmsterdam, North Holland, Netherlands
尚书勇
成都师范学院 - 科研与学科建设处副处长Chengdu, Sichuan, China
Himansu tiwari
Fault management engineer in automated operations || 24*7 working support || Charging-IN nodes || Li...Noida, Uttar Pradesh, India
Steven bell
Sole trader Commercial/domestic installation engineerCornhill On Tweed, England, United Kingdom
David toledano revenga
Director Regional para OVB Allfinanz España S.A. DTR 2020 Consulting - Sociedad colaboradora con OVB...Spain
Lucas miné
Embedded software engineerToulouse, Occitanie, France
Kavita dahiya, pmp, csm®️
Senior Project Manager at NagarroGurgaon, Haryana, India
...