Mumtaz Khan

Mumtaz Khan

Different positions in the capacity of a Civil & Structural Engineer

Followers of Mumtaz Khan90 followers
location of Mumtaz KhanFujairah Emirate, United Arab Emirates

Connect with Mumtaz Khan to Send Message

Connect

Connect with Mumtaz Khan to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at Aecom middle East Ltd.

  • Education

    • Gautam Buddha University

      2000 - 2004
      Engineer’s Bachelor Degree Civil and Structure Engineering First Class

      Activities and Societies: Performing fields experiments, in KSA Govt. approved organizations. Studied there for theory and practical's for my disciplined subjects.

  • Experience

    • Miscellaneous Companies, in INDIA

      Dec 1987 - Jul 1995
      Different positions in the capacity of a Civil & Structural Engineer

      Worked for different Projects in the capacity of a Civil & Structural Engineer, includes Airport Expansion project in India.It will go too long if I mention all my India experience, hence I cut it short.

    • Fluor Corporation

      Oct 1995 - Jun 1997
      QA/QC Engineer

      PROJECT : RABIGH POWER PLANT EXTENSION – PHASE-1V AT RABIGH , ( SAUDI ARABIA )EPC AND SUPERVISION OF COMBINED CYCLE GAS TURBINES FOR ELECTRICITY GENERATING FACILITY PROJECT with four gas and two steam turbine for Electricity in Western region ( EWR ) utility.RESPONSIBILTIES: Almost same as that of mentioned in above project. (This short-go for reducing time to read text)

    • Fluor Corporation

      Aug 1997 - Feb 2000
      QA/QC Engineer

      PROJECT : YANPET EXPANSION PROJECT, AT YANBU INDUSTRIAL CITY ( SAUDI ARABIA )EPC AND SUPERVISE SU-CONTRACTORS FOR THIS PETROCHEMICAL INDUSTRY’S CONSTRUCTION OF 100% EXPANSION, within the existing live plant producing final product of polyethylene, ethylene and ethylene glycol.RESPONSIBILTIES:• As usual of QA/QC Engineer, moreover verify site instruction, change orders claims produced by contractors in support of project documents, find out discrepancies in drawings and design changes for issue to field. Show less

    • SAUDI ABV GENERAL CONTRACTORS COMPANY LIMITED

      Feb 2000 - Mar 2002
      QUALITY CONTROL ASST. MANAGER

      PROJECT : ABC HOUSING COMPLEX PROJECT AT JEDDAH ( SAUDI ARABIA)EPC & SUPERVISE SUB-CONTRACTORS FOR THIS LUXURIOUS HOUSING COMPOUND PROJECT, Containing 11 nos. Multi Storied Residential Bldgs. For Govt./ARAMCO employees, equipped with all facilities viz. five swimming pools, play grounds and a big recreation building, mini sewage treatment plant, huge underground water storage tank etc.RESPONSIBILTIES:• Worked in the quality control dept. as Q.A./Q.C. Engineer, performing inspections of construction activities to verify the compliance with specs. and drawings, ultimately getting approval from the client.• Due to demobilization of Q.C. manager from the site I became the head of Q.C. department for this project. Show less

    • Fakieh Poultry Farms

      Apr 2002 - Aug 2003
      Site-in-Charge

      PROJECT : AL-SHALLAL AMUSEMENT/THEME PARK PROJECT AT JEDDAH ( SAUDI ARABIA)CLIENT REPRESENTATIVE FOR THIS FANTASTIC THEME PARK PROJECT.Cost 180 million Saudi riyals, comprising a number of entertainment & commercial structures viz. 42mt. high large-range Looping Coaster, 65mt.x32mt ice rink for ice skating, 20mt. high elevated parking building for 500 cars. “Amazon” building for different types of amusing rides and a large double storied main building for miscellaneous purposes. All of these structures are built on total 833 nos. pile foundations.This is the biggest amusement park in GCC countries which has been constructed totally inside the sea with enormous backfilling stone armoring for break water and under water construction involved. RESPONSIBILTIES: Review and remark the project documents for approval and construction supervision. Almost same as that of mentioned in above project. (This short-go for reducing nos. of pages) Show less

    • Weir Canada Inc.

      Aug 2003 - Aug 2006
      Project Civil Structural Engineer

      PROJECT : DESALINATION SEA WATER R.O. PLANT, CAPACITY 50,000 CUBIC METER PER DAY AT JEDDAH SEA PORT, SUDI ARABIA.EPC AND SUPERVISION OF SUB-CONTRACTORS FOR THIS TECHNICALLY COMPLEX PROJECT.A marvelously designed Project in order to accommodate all of the structures and facilities in a limited area with the existing live plant. Project cost 250 million Saudi riyals.The project contains three storied Admin.& control room bldg. a range of heavy industrial structures i.e. big R.O. plant, sub-stations bldg, workshops and amenities, service roads, land and hard scaping etc. Reconstruction/refurbishment of sea water intake old Marine structure inside Jeddah Sea-Port was a big quantum of work in this project. Long U/G water pipe lines were involved for distribution and intake purpose.RESPONSIBILTIES:• Co-ordination between client, consultant and the contactors for all construction matters.• Liaising with Port authorities to follow their regulations and procedures for project execution.• Close control on the construction of each & every structure, facilities of the whole project, drawing review/ comments and approvals. Observe & approvals all contractor’s documents, works and materials.• Maintain quality & standards per the project documents with or w/o some acceptable variation in the design as per the site requirement. Coordinating with Project Manager and ultimate to contractors’ for any issue for timely completion within the set project schedule and cost. Show less

    • Vopak

      Sept 2006 - Dec 2007
      Project Engineer

      PROJECT : VOPAK HORIZON FUJAIRAH Ltd. PHASE-V (OIL TANKAGE FORM CONSTRUCTION FOR BUNKERING IN FUJAIRA, UAE)PROJECT MANAGEMENT CONTROL/CONSULTANCY (PMC) FOR THIS MAGNIFICENT TERMINAL.This consist of Nine numbers of 55 & 39 mt. dia. above ground oil storage tanks (total capacity being 350 000 cub mt., its related bund wall, manifold and other accessories / utilities. Jetty expansion also was included for OTB Birth number 5 & 6 in this project for bunkering purposes.RESPONSIBILTIES: Same as mentioned above in ENOC project, in addition to that some are as follows.• Review/Remarks and approvals of monthly progress and QA/QC report, prequalification’s, documents of Sub-contractors/suppliers, ITP’s and As-built documentation. Prepare and attain the punch list items etc. Show less

    • ENOC

      Dec 2007 - Nov 2012

      PROJECT : VOPAK HORIZON FUJAIRAH LTD. PHASE-VI PROJECT (OIL STORAGE TANKAGE FORM CONSTRUCTION IN FUJAIRA, UAE) PROJECT MANAGEMENT CONSULTANCY FOR THIS MAGNIFICENT TERMINAL.Consist of 21 numbers oil storage tanks total capacity 6,50,000 cub mtrs. All related facilities, tank foundations, Soil improvement, Containment bund walls, big manifold w/ huge pump foundations, Huge MCC/Switch Gear bldg. and Transformer Rooms, Fire pump house, hot oil & huge elevated Pipe Rack structure (1700 mtrs. long) on concrete Piled Foundations and associated Pipe Sleepers, massive & long network of product & fire pip line, service roads, interfaces with existing live plant and other utilities. Marine Oil Tanker Birth Loading arms and Jetty lines expansion.RESPONSIBILTIES:• Review, remark and approvals of Project submittals thru contractors with reference to Tender project documents. Drawing review and comments for approvals. Monitor/control the contractors/suppliers construction activities for timely finish and within the project cost. Hence try to avoid any positive cost variation. Coordinate with HSE, Client’s live plant operation team and multidiscipline departments and manage for smoothly running all works conforming to the project requirements.• Manage to attain the quality and standards as per the project docs. Contemplation and approval in coordination with client of any site variations thru contractor, if required depending upon the site condition. Review/release the contractor’s monthly bill for payment against acceptable works. Sort any ambiguity using the FIDIC regulations.• Coordination with Project manager/ director and H.O. designing dept, client and ultimate with the contractor for technically helping and encouraging the contractor in all respects to achieve the set target.• Work out useful developments in weekly meetings with our PMC team and contractor’s project command personnel. Sort any ambiguity using the FIDIC regulations. Show less PROJECT : A BIG LUBRICANTS & GREASE MANUFACTURING PLANT INSIDE PORT OF FUJAIRA, UAE.PROJECT MANAGEMENT CONTROL/CONSULTANCY (PMC) FOR THIS MAGNIFICENT TERMINAL.This consist of all facilities for manufacturing lubricant products Viz. base oil tank farm, marine loading arm on the existing port dock-wall, big network of product and fire pipe lines, grease plant, Blending & homogeneous plant, additive plant, ware house, utility area with chimney, Laboratory & control room, Admin bldg., workers facility, switch gear plus transformer rooms and all other U/G utilities. (Per annum production capacity is 30,000 tons lubricating oil, 25,000 tons Marine grade lubricants and 3,000 tons grease)RESPONSIBILTIES: Same as mentioned above, in ENOC / VOPAK HORIZON FUJAIRAH LTD. PHASE-VI. (Note-In order to save reading time, I made it cut for short go) Show less PROJECT : HORIZON TENGIERS TERMINAL Ltd { OIL TANKAGE FORM CONSTRUCTION IN STRAIGHT OF GIBRALTER ( SPAIN / MOROCCO) TERRITORIES }PROJECT MANAGEMENT CONTROL/CONSULTANCY (PMC) FOR THIS MAGNIFICENT TERMINAL.This Project was built totally from the grass root with all infrastructures, facilities, capacity was approximate same as of above Vopak Horizon Phase VI in Fujairah, UAE. Construction of dock wall was included in my assignment. RESPONSIBILTIES: Same as mentioned in above ENOC projects, in addition to that I was handling independently our QA/QC department on-site and off-site too. (This short-go is just for reducing nos. of pages to read) Show less

      • Project Coordinator, Civil & Structure

        Oct 2010 - Nov 2012
      • Civil & Structural wroks manager

        Jan 2009 - Oct 2010
      • Senior Project Engineer

        Dec 2007 - Dec 2008
    • Asian Company LLC

      May 2013 - Jan 2014
      Project Coordinator

      RESPONSIBILITIES:Supervising from the top all the projects running in different locations of this company and coordinating between the client and contractor.

    • ILF Consulting Engineers (Germany)

      Feb 2014 - Mar 2016
      Sr. Project Engineer

      PROJECT : FUJAIRAH WATER DISTRIBUTION PROJECT FOR CLIENT TRANSCO ABU-DHABI (UAE).PROJECT SUPERVISION& MANAGEMENT CONSULTANCY (PMC) FOR THIS CHALANGING PHASE.This Project consists of Huge Pumping Station 72,00,00,00 gal. water per day capacity comprising all associated subordinate structures viz. Transformer rooms, huge U/G cable room, surge vessels foundations, pumps shelter, cable & control room and several others structure.Other part, 120 Km long of 120-600 mm dia. inter-city U/G pipe line. Several road cross NDRCs, many Tap-Off Stations and all kinds of necessary associated valves chambers and shelters involved.RESPONSIBILTIES:• Close control/monitoring/manage the contractors and construction related activities in this project, for timely finish and within the project cost. Method Statement review and comment for approval, Material approvals, try to avoid positive cost variation. Coordinate and manage with multidiscipline departments for smoothly running all works conforming to the project requirements. Attend various meetings.• Strive to attain the quality and standards as per the project specifications and Project documents.• Reporting/coordinating time to time our Project Construction management H.O. and site office too, for any issues to sort and to drive Contractor in right direction.• Promote and push contractor to maintaining all Construction Safety environments. Show less

    • Project Construction Supervision Consultancy

      Jan 2015 - now
      Project Engineer
    • Aecom middle East Ltd.

      Feb 2017 - now
      Sr.Project Engineer
  • Licenses & Certifications

    • Bechalor Of Engineering (Civil & Structural)

      Education Depatrtment of India Government