Shervin Ghasemi

Shervin Ghasemi

Associate Civil Engineer

Followers of Shervin Ghasemi320 followers
location of Shervin GhasemiTehran, Tehran Province, Iran

Connect with Shervin Ghasemi to Send Message

Connect

Connect with Shervin Ghasemi to Send Message

Connect
  • Timeline

  • About me

    Strategic Management | Researcher | Civil Engineer

  • Education

    • Tehran Electricity Secondary Education Center

      1996 - 2000
      High School Diploma Theoretical and Mathematical Physics 16.73/20

      The grade of my High School Diploma: was 16.73/20The grade of my Pre-University courses was 14.78/20

    • Islamic Azad University Central Tehran Branch

      2022 - 2024
      Master's degree Business Administration and Management, General Expected GPA: 4/4 (19.29/20 in Iranian scale)

      Activities and Societies: o Teaching Assistant: • For ‘Technical English Language’, by Dr. T. Mirsaldoo (Sp. 2023) • For ‘Financial Management', by Dr. A. Sina (Sp. & F. 2023) • For ‘Economics Principles', by Dr. M. Aligholi (SP. & Fall 2023) • For ‘Business Dynamics’, by Dr. A.R. Keyghobadi (F. 2023 & Sp. 2024) • For ‘Strategic Management’, by Dr. A. Sina (F. 2023 & Sp. 2024) • For ‘Business Research Methods’, by Dr. A. Sina (F. 2023 & Sp. 2024) • For ‘Strategy Implementation’, by Dr. Farideh Hagh Shenas (SP. 2024) The title of my thesis, which I am currently researching and writing, is as follows:"Investigating the Impact of Strategic Factors Influencing the Adoption of Innovative Artificial Intelligence Technologies in the Construction Industry (Case Study: Tehran Construction Engineering Organization)"My research interests include: - Strategic Management,- Innovation,- Entrepreneurship,- Artificial Intelligence,- Optimal Construction.Some of my courses:-… Show more The title of my thesis, which I am currently researching and writing, is as follows:"Investigating the Impact of Strategic Factors Influencing the Adoption of Innovative Artificial Intelligence Technologies in the Construction Industry (Case Study: Tehran Construction Engineering Organization)"My research interests include: - Strategic Management,- Innovation,- Entrepreneurship,- Artificial Intelligence,- Optimal Construction.Some of my courses:- Organizational Behavior Management, (4/4) - Financial Management, (4/4) - Operations Management, (4/4) - Human Resource Management, (4/4) - Marketing Management, (4/4) - Research Methods in Business, (4/4) - Strategic Management, (4/4) I am always open to new topics and areas of research. Show less

    • Islamic Azad University

      2002 - 2005
      Associate's degree Civil Engineering Technologies/Technicians Completed were 86 academic credits

      Activities and Societies: - Concrete Technology Laboratory, - Technical Drawing, - Building Drafting - Construction Workshop, - Surveying, - Heat Physics Laboratory, - Workshop of Concrete Buildings Execution 1, and 2, - Concrete Buildings Drafting and Project, - Cost Estimation and Project, - Soil Mechanics Laboratory, - Repair and Maintenance, - Training 1, and 2. My first academic credential was an Associate's degree earned at Azad University, Borujerd Branch, with a major in Civil, specializing in Reinforced Concrete Structures. I obtained this degree after the successful completion of a comprehensive curriculum consisting of 86 credit units, encompassing both theoretical and practical coursework.Some of my courses:- Concrete Buildings Execution 1, and 2,- Precast and Prestressed Concrete, - Reinforced Concrete Parts Behavior,-… Show more My first academic credential was an Associate's degree earned at Azad University, Borujerd Branch, with a major in Civil, specializing in Reinforced Concrete Structures. I obtained this degree after the successful completion of a comprehensive curriculum consisting of 86 credit units, encompassing both theoretical and practical coursework.Some of my courses:- Concrete Buildings Execution 1, and 2,- Precast and Prestressed Concrete, - Reinforced Concrete Parts Behavior,- Concrete Technology- Cost Estimation- Technical Calculations 1, and 2,- Soil Mechanics,- Labor Rules and Relations,- Geology and Construction Materials,- Mechanics- Construction Elements,- Technical Computations 1, and 2. Show less

    • Islamic Azad University - Roudehen Branch

      2007 - 2009
      Bachelor of Science - BS Civil Engineering Completed were 91 academic credits.

      Activities and Societies: - Construction Elements and Site, - Reinforced Concrete Project, - Steel Structures Project, - Final Project, - Training. My educational journey continued at the Islamic Azad University, Roudehen Branch, where I pursued a Bachelor's degree in Civil Engineering with a specialization in Civil Engineering. I completed this program after passing 91 credit units, comprising both theoretical and practical courses.Some of my courses:- Structures Analysis 1, and 2,- Reinforced Concrete Structures 1, and 2,- Steel Structures 1, and 2,- Execution of Reinforced Concrete Structures,- Execution of… Show more My educational journey continued at the Islamic Azad University, Roudehen Branch, where I pursued a Bachelor's degree in Civil Engineering with a specialization in Civil Engineering. I completed this program after passing 91 credit units, comprising both theoretical and practical courses.Some of my courses:- Structures Analysis 1, and 2,- Reinforced Concrete Structures 1, and 2,- Steel Structures 1, and 2,- Execution of Reinforced Concrete Structures,- Execution of Steel Structures,- Highway Engineering,- Foundation Engineering,- Principles of Earthquake Engineering,- Loading,- Systems Engineering,- Geotechnical Engineering,- Water and Wastewater Engineering,- Transportation Engineering,- Principles of Traffic Engineering,- Fundamentals of Architecture and Urban Planning,- Engineering Statistics and Probability,- Engineering Economics,- Structural Mechanics,- Road Pavement- Dynamics. Show less

  • Experience

    • Pazhuhesh - Zaman - Abniyeh Company

      Apr 2005 - Dec 2006
      Associate Civil Engineer

      ▢ Project name: 3rd phase of Ati Saz■ Daily reports were prepared through collaboration with the technical office operator■ A materials list was prepared and procurement was followed up by the support unit■ Measurements and estimates were done with the technical office personnel■ Typing letters was assisted by the technical office operator■ On-site visits to monitor construction activities were conductedProject Description: The final phase of this complex spans 140,497 square meters and includes five towers with 29 to 31 floors, totaling 781 units. It also provides 824 parking spaces and 819 storage units. My internship as a civil engineering intern began two months after obtaining my associate's degree in civil engineering with a focus on reinforced concrete structures. One-third of my 20-month internship as a technical office assistant was unpaid. Due to my eagerness to learn technical and engineering matters, I received encouragement and was compensated at the minimum wage set by the Ministry of Labor for the remaining period. Show less

    • Arta Sang Shekan Azar

      Dec 2006 - Jun 2008
      Civil Engineering Student

      ▢ Project Name: Construction of Stone Crusher Factory■ All construction activities were coordinated and supervised■ The physical progress of the work was monitored and reported to the project owner■ A list of required materials was prepared daily and monitored for procurementThe project included:◉ Industrial Shed◉ Administrative Building◉ Guard Room◉ Green SpacesDuring the 19-month duration of my involvement in this project, I was registered as a civil engineering student with a specialization in civil engineering at Azad University, Roodhen. My work schedule was restricted to three days per week. Significant achievement is attained through work experience by a civil engineering student, as the majority of my classmates were solely focused on their studies during that period. Show less

    • Omran va Tolidi Niroo (OMTN)

      Jul 2008 - Aug 2010

      ▢ Project name: Residential Complex "Sevom Khordad"■ Daily field visits and supervision, including one visit per work shift, were conducted■ Assistance was given in preparing daily, monthly, and physical progress reports■ Collaboration was conducted in the preparation of plans and execution details■ Accurate measurements and estimations were conducted■ The final status reports of contractors were reviewed▢ This complex comprised the following components:◉ A multi-story parking facility◉ A marketplace◉ A mosque◉ Landscaping and green spaces◉ Traffic areas for both vehicles and pedestrians◉ Entrance and exit gates for the complex◉ 640 residential units, distributed across 8 residential blocks, with each block having 8 floors and 10 units per floorThis experience exposed me to the exceptional speed and efficiency of major construction operations, which significantly enhanced my ability to work quickly and efficiently. The "Sowm Khordad" project has been instrumental in shaping my approach to project management and engineering, and the skills and knowledge gained continue to benefit my work today. Show less ▢ Project name: Roz e Mirdamad Commercial Office Tower■ Progress reports for all subcontractors were prepared and organized■ Construction operations on floors 7, 8, and 9 were coordinated and overseen■ Progress was reported daily■ Quantity surveys and cost estimation were conducted■ Central staircase and fire escape staircases were supervised■ A list of required materials was prepared daily and monitored for procurement■ The transportation of materials was coordinated with the tower crane and the Alimak elevatorThe Razz Mir Damad Commercial Office Tower was a high-rise commercial office building that included:◉ 5 basement levels (used for parking and storage, totaling 235 spaces)◉ Ground, first, and second floors (comprising 102 commercial shops)◉ Floors 3 to 12 (housing an average of 94 office units)◉ Floors 13 and 14, which included a restaurantThe project initially had the name "La'ah" but underwent a name change after its inauguration to Razz Mir Damad. Concurrently with my assignment, project management issued a directive for full-time work (three shifts). A significant portion of my work on the Roz e Mirdamad Tower coincided with the final semester of my bachelor's degree program at Azad Roudehen University. This project served as a practical university for me due to its intense pace. My work on the Roz e Mirdamad Commercial Office Tower not only enhanced my engineering skills but also exposed me to the rigorous demands of high-rise construction projects. It was an invaluable learning experience that contributed significantly to my professional growth. Show less

      • Technical Office Engineer

        May 2009 - Aug 2010
      • Site Civil Engineer

        Jul 2008 - May 2009
    • Tose Maskan Kavir Company

      Sept 2010 - Oct 2012
      Technical Office Manager

      ▢ Project name: 582-Unit Residential Complex■ Daily, monthly, and progress reports were prepared.■ Elevation codes were controlled using a Theodolite camera.■ Contractors' status reports were reviewed.■ Quantity surveys and estimates were conducted.■ Status reports for Tose Maskan Kavir Company were prepared and coordinated.■ Daily site visits were conducted.■ Work orders with accompanying drawings and execution details were prepared and coordinated.■ All concrete pouring operations for foundations, columns, and slabs in 49 residential blocks were supervised. Show less

    • Pey Koob saze

      Oct 2012 - Jul 2013
      Technical Office Manager

      ▢ Project name: 440-Unit Residential Complex■ Project documents were methodically organized and archived■ Accurate measurements and estimations were conducted■ The measured quantities were documented in a meeting with the client's representative

    • Different Companies

      Jun 2013 - Jul 2016
      Quantity Surveyor and Estimator:

      ◙ The names of the projects: Various Names■ Precise measurements and estimations were meticulously performed.■ The measured quantities were documented in a meeting with the client's representative■ Comprehensive reviews of contractors' final status reports were carried out.■ The initial and accurate budget forecast was adhered to during budget execution.◩ Employer's Names:1. Mr. Ahad Azim Zadeh 2. Ista Peyvand Company3. Islamic Republic of Iran Airlines (Homa)4. Taraz Boom Company5. Qadrkar Design, Equipment And Construction Company6. Wirtgen Company7. Imam Khomeini Relief Committee Organization8. Shar Sanat Energy Company9. Pardis Kooh Paye Company10. Iran University of Science And Technology◙ The Locations of the projects:1. Motel Ghoo, Mazandaran, Iran2. Parkway, Tehran, Iran3. Imam Khomeini Airport, Tehran, Iran 4. Azimiyeh, Alborz, Iran5. Sheikh Baha'i, Tehran, Iran6. Fath Highway, Tehran, Iran7. Tehran Pars, Tehran, Iran8. Golestan City, Tehran, Iran9. Shahriar, Alborz, Iran10. Narmak, Tehran, Iran▢ The names of the projects:1- Ghoo Almas Khavare Miane Towers (B)2- Hamshahri Newspaper Building3- Catering4- Karaj and Suburban Metro Railway5- Baqiyatallah School of Medical Sciences6- The Central Office of Wirtgen Company7- Relief Committee Building8- Berlian Residential Complex (Tower D1)9- Parnian Residential Complex (Blocks A6, B8-05)10- Central Library of the University of Science and Technology Show less

    • Kerman Motor

      Jul 2013 - Nov 2013
      Construction Contractor

      ▢ Project name: Reconstruction, and Inauguration of Kerman Motor Company's Branch No. 1708■ The execution of reinforced concrete flooring in the branch was carried out■ The execution of ceramic flooring in the management hall and waiting hall was undertaken■ The implementation of sanitary facilities was executedThe satisfaction and encouragement of the client were earned through meticulous supervision, budget management, problem-solving, and the proper execution of certain operational items. Show less

    • Valiasr Mosque

      Jul 2014 - Feb 2015
      Construction Contractor

      ▢ Project name: Reconstruction of Meeting Halls■ Project documents were methodically organized and archived■ The budget and schedule management led to the satisfaction of the esteemed client■ Reconstruction was promptly finished, and precise measurements were made.■ Excellent collaboration and interaction with the Kani Savaran Company, which was responsible for the architectural design of the projectI had a bitter experience from this work and unfortunately, despite working non-stop for more than 8 months, the person who worked in my father's shop for years and I trusted him, did not pay me my fee and share of my partnership!!! Show less

    • Namad Saze Jonoub

      Aug 2016 - Jun 2018
      Technical Office Manager

      ▢ Project name: Building No. 2 of Tehran Municipality Project■ My responsibilities encompassed a wide range of tasks, resulting in valuable and extensive experiences.■ Construction activities were ensured to be in line with the project schedule and budget■ The technical office for the construction of a large-scale municipal building was managed■ All required correspondence was prepared and coordinated■ A strong working relationship with contractors and other stakeholders was developed■ 982 technical letters were authoredAs a Technical Office Manager with Namaad Sazeh Janoob, I held a strategic role in a prominent project located in the heart of Tehran for approximately two years. Show less

    • Tehran Construction Engineering Organization (TCEO)

      Sept 2016 - now
      Structural Supervisor and Coordinator Engineer

      ▢ Ongoing: Two residential buildings with 18 and 30 units respectively in Tehran.▢ Completed: Four residential buildings with 8, 10, 8, and 15 units in Tehran, plus an 8-unit in Bumehen.■ Launching construction operations flawlessly with approved plans.■ Conducting regular site visits and attention to detail.■ Supervising demolition and renovation work with high accuracy.■ Ensuring compliance with safety standards during the implementation.■ Controlling the quality of materials and equipment with constant monitoring and feedback■ Holding periodic meetings to coordinate with other project supervisors.■ Preparing, adjusting, and presenting phase-by-phase reports on due dates.■ Reflecting discrepancies to the relevant authorities.Engineering Work Permit:On September 4, 2016, by the following laws and regulations, I successfully obtained a license to work in the field of civil engineering, including execution and construction supervision qualifications from the Ministry of Roads and Urban Development of Tehran Province. I have progressively increased their credibility by participating in relevant classes and exams:◆ Having at least 5 years of relevant work experience in the field of civil engineering after obtaining a degree in the said field◆ Passing the exams to enter the engineering profession is organized by the Organization of Construction Engineering System◆ Success in training courses related to civil engineering (supervision and implementation) considered by the organization of construction engineering system Show less

    • Abzar Sang Mihan

      Jul 2018 - Dec 2018
      Technical Manager

      ▢ Projects: Strategically managing technical offices for 4 projects in Iran simultaneously.■ A unity of action among four active projects was successfully created■ Documents in the company's head office were organized■ The required raw forms were prepared, adjusted, and coded■ Contracts, including nailing and jet injection, were drafted■ Projects were actively delivered to Caspian Sea Shipping Company in Gilan province▢ The names of the projects: I. The project of strengthening the bed of the pit floor and walls by jet grouting method at the construction site of the 33-story Odima tower in Noor citII. The project of bed consolidation by jet grouting method at the construction site of crude edible oil tanks in Bandar Nazli Free ZoneIII. The project of bed consolidation by jet grouting method, to the construction site of 12 silos of 45,000 tons of grain in the free zone of Band Anzali.IV. The project of implementing the foundations of 45,000 tons of grain silos in Bandar Anzali Free Zone. Show less

    • Caspian Sea Shipping

      Oct 2018 - Nov 2019
      Construction Contractor

      ▢ Project name: The landscaping project of the 45,000-ton grain silos complex■ Construction plans were revised and executed, utilizing expertise■ The initial and accurate budget forecast was adhered to during the budget execution■ The construction finished on time, ahead of the project's opening■ Project documents were methodically organized and archivedMy teamwork, effective presence, and professional performance as the technical officer of Abzar Sang Mihan Company in the Anzali Free Trade Zone were recognized and approved by the esteemed management of Caspian Sea Shipping Company, resulting in the initiation of my collaboration with the company from October 2018. Show less

    • Pars Dezh

      Nov 2019 - Apr 2020
      Technical Office Manager

      ▢ Project name: Imam Baqir Cultural and Educational Complex■ Conducted precise measurements and estimations.■ Scrutinized the final status reports submitted by contractors■ A draft of two contracts related to the Pazhouhesh Building, titled 'Building Facade' and 'Execution of Light Metal Works,' has been prepared

    • Toufandeh Road and Building Company

      May 2020 - Oct 2020
      Technical Office Manager

      ▢ Project name: Imam Baqir Cultural and Educational Complex■ Implemented overtime strategies to mitigate delays and align with project scheduling.■ Conducted productive negotiations with engineers and enhanced collaboration.■ Negotiated 6 contracts, applying general terms to secure favorable terms for the company.■ Delivered outstanding results through highly efficient teamwork, encompassing: - Orchestrated and systematized 256 construction commencement permits. - Compiled and organized 256 records of meeting minutes for executed work. - Analyzed the prices of 95 items related to work beyond the contract scope. - Formulated 87 work order directives for tasks falling outside the contract scope. Show less

    • Partshahr

      Oct 2020 - Oct 2021
      Technical Manager

      ▢ Projects: Strategically managing technical offices for 7 projects in Iran simultaneously:■ Led and strengthened cohesion and unity across all projects■ Negotiated effectively with clients in multiple meetings■ Periodically traveled to Qom, Qazvin, and Mashhad for site visits■ Helped win the "Ramsar Hotel Cinema" tender by collecting documents with colleagues.▢ The names of the projects: I. Execution of foundations and structures for projects in Boukan and Sirvan in TehranII. Construction of the East Bahar Sports Hall in the city of QazvinIII. Construction of a sports hall located in the Municipality of District 5 in QomIV. Execution of structures for the Entrance and Event Hall in the Mashhad Mall projectV. Design and execution of mirror work in the Event Hall of the Mashhad Mall projectVI. Execution of cladding with stone for the Entrance Hall of the Mashhad Mall projectVII. Design and execution of building operations, mechanical, and electrical installations for the Mashhad Mall Mosque project Show less

    • MIM Company

      May 2022 - Aug 2023
      Technical Manager

      ▢ Project name: Baran Office-Commercial Tower Project■ Managed strategically the execution of the project by schedule.■ Negotiated and executed strong and comprehensive contracts with contractors■ Resolved project challenges through innovative technical and engineering solutions■ Established interactions with representatives of the employer, contractors, and workers■ Detailed financial reviews were conducted on all invoices at the end of the project

    • Islamic Azad University Central Tehran Branch

      Oct 2022 - Sept 2024
      Teaching Assistant

      The roles of Teaching Assistants are carried out in collaboration with esteemed professors and as voluntary charity work.𝗖𝗼𝘂𝗿𝘀𝗲𝘀:▢ Teaching Assistant, IAU Central Tehran Branch, Iran■ For ‘Technical English Language’, by Dr. T. Mirsaldoo (Sp. 2023)■ For ‘Financial Management', by Dr. A. Sina (Sp. & F. 2023)■ For ‘Economics Principles', by Dr. M. Aligholi (SP. & Fall 2023)■ For ‘Business Dynamics’, by Dr. A.R. Keyghobadi (F. 2023 & Sp. 2024)■ For ‘Strategic Management’, by Dr. A. Sina (F. 2023 & Sp. 2024)■ For ‘Business Research Methods’, by Dr. A. Sina (F. 2023 & Sp. 2024)■ For ‘Strategy Implementation’, by Dr. Farideh Hagh Shenas (SP. 2024) Show less

  • Licenses & Certifications

    • Occupational Safety and Health for Workers Covered by Contractors

      Ministry of Labor, Cooperation and Social WelfareMinistry of Labor, Cooperation and Social Welfare
      Sept 2021
      View certificate certificate
    • Digital Networking Strategies

      LinkedIn
      Jan 2024
      View certificate certificate
    • Licenced to engage in engineering work - Rank: 3

      Tehran Construction Engineering Organization (TCEO)
      Sept 2016
      View certificate certificate
    • Top Essay Certificate

      Iranian Electronic Commerce Scientific Association
      Nov 2023
      View certificate certificate
    • English for Career Development

      Coursera
      Oct 2023
      View certificate certificate
    • Certificate of Completion AI Course

      Irancellacademy | آکادمی ایرانسل
      Jun 2023
    • Writing a Cover Letter

      LinkedIn
      Jan 2022
      View certificate certificate
    • A Career Strategist's Guide to Getting a Job

      LinkedIn
      Dec 2021
      View certificate certificate
    • Licenced to engage in engineering work - Rank: 2

      Tehran Construction Engineering Organization (TCEO)
      Sept 2020
      View certificate certificate
  • Honors & Awards

    • Awarded to Shervin Ghasemi
      Best Paper Award at the "A World Without Oil" Conference First National Conference on 'A World Without Oil' Dec 2023 The role of artificial intelligence in business management has received more attention today than in the past. In recent decades, significant advances in artificial intelligence (AI) have led old strategies to give way to innovative approaches. The present research aims to identify and determine the influential factors affecting the adoption of artificial intelligence in knowledge-based companies. The research method is based on purpose, applied, and, in terms of execution method, it is a… Show more The role of artificial intelligence in business management has received more attention today than in the past. In recent decades, significant advances in artificial intelligence (AI) have led old strategies to give way to innovative approaches. The present research aims to identify and determine the influential factors affecting the adoption of artificial intelligence in knowledge-based companies. The research method is based on purpose, applied, and, in terms of execution method, it is a descriptive survey. The statistical population of this research includes employees of knowledge-based companies, and the sample size, considering the lack of accurate statistics on the employees of knowledge-based companies and to increase the accuracy of calculations, was calculated to be 386 individuals using Cochran's formula. Simple random sampling was also used. To collect the necessary data, a standard questionnaire was employed, and for hypothesis testing, structural equation modeling was utilized. The research results indicate that competitive pressure, external support, commitment of senior managers, employee adaptability, and organizational readiness have an impact on the acceptance of artificial intelligence in knowledge-based companies. Show less
    • Awarded to Shervin Ghasemi
      The First Rank With a Perfect GPA of 4/4 (20/20 in Iranian scale) Islamic Azad University Central Tehran Branch Jul 2023 Attained the first rank with a perfect GPA of 4/4 (20/20 in Iranian scale.