Asif Mahamood

Asif Mahamood

Project Management Trainee

Followers of Asif Mahamood3000 followers
location of Asif MahamoodDoha, Qatar

Connect with Asif Mahamood to Send Message

Connect

Connect with Asif Mahamood to Send Message

Connect
  • Timeline

  • About me

    Project Controls at QDVC (Q.S.C)

  • Education

    • GEC Thrissur, University of Calicut

      2006 - 2010
      Bachelor of Technology (BTech) Civil Engineering
    • Indian Institute of Technology, Madras

      2010 - 2012
      Master of Technology (MTech) Building Technology & Construction Management
  • Experience

    • JLL

      May 2011 - Jul 2011
      Project Management Trainee
    • Al Ansari Trading Enterprise LLC

      Jul 2012 - Jun 2014
      Planning Engineer

      A) Project Name: Special Task Force Complexes at Salalah, OmanProject Cost: 36.74 Million RO Client: The Royal Oman Police (ROP)• Construction of 34 structures including Command Buildings, Barrack Accommodations, Officers Bedsits, Civilian Barracks, Recreation Buildings, Guard Houses, Armory and Magazine Building, Maintenance & Workshop, Training Schools, Mosques, Police Stations, Officers Club & Accommodations, Sports Complex, Swimming Pool & Gymnasium, Substations, Football Ground, Basket and Volley Ball Courts, Reverse Osmosis Plant & Watch Towers.• Construction of Roads, Landscaping, Sewage Treatments Plants, Obstacles Tracks, Boundary Walls, Storm Water Protection and Helipads.• It covers a built up area of 28,500 Sq. M. in a plot of 410,000 Sq. M. B) Project Name: Construction of Sewerage network for Coastal Darsait, Aynt, Wadi Kabir and Hamriya Sub catchments.Project Cost: 24.29 Million RO Client: HAYA Water Consultant: Energoprojekt Entel LLC.• Supply and Installation of the gravity sewer pipelines • Construction of HDPE & RCC sewage manholes.• Construction of house and property connectionsResponsibilities•Prepare Baseline Program in Primavera P6.•Review and approve subcontractor baseline programs.•Project tracking through Earned Value Management (EVM).•Prepare construction delay analysis and Extension of Time (EOT) claim.•Prepare manpower histogram, equipment histogram & cash flow.•Prepare daily, weekly and monthly progress reports for submission to client and planning department.•Prepare Monthly and Two Week look-ahead program in line with master program for execution of work at site. Show less

    • Shapoorji Pallonji Qatar WLL

      Jul 2014 - Jun 2015
      Planning Engineer

      A) Project Name: Construction of New College of Pharmacy- Qatar UniversityProject Cost: 240 Million QARClient: Qatar UniversityConsultant: Khatib & Alami Responsibilities• Prepare Resource & Cost Loaded Baseline Programs in Primavera P6 Professional R8.3• Project tracking through Earned Value Management (EVM)• Prepare S-Curve, manpower histogram, equipment histogram & cash flow• Prepare construction delay analysis and Extension of Time (EOT) claim• Prepare daily, weekly and monthly progress reports for submission to consultant and planning department• Prepare recovery and revised program in Primavera P6 R8.3 Show less

    • QDVC (P.Q.S.C)

      Jun 2015 - Dec 2019
      Project Controls Engineer

      • Develop and analyse schedules using Primavera P6• Prepare Resource & Cost Loaded Baseline Programs in Primavera P6 Professional 18• Assist Planning Manager/Project Control Manager for all Project Control Reporting• Review/Follow up/Approve Subcontractors execution plan• Subcontractor performance monitoring and reporting to Project Control Department • Prepare monthly Progress Measurement Sheet and follow up for Employer Approval• Assist Forensic Planner for Delay Analysis & EoT preparation • Prepare 3D Progress Layout in Revit/AutoCAD with the help of CAD team for management presentation• Project tracking through Earned Value Management (EVM).• Prepare S-Curve, manpower histogram, equipment histogram & cash flow.• Prepare Reports & PowerPoint presentations for the Monthly Management Meeting.• Prepare Project Summary Dashboards for Monthly Management Meeting• Prepare daily, weekly and monthly progress reports for submission to client and planning department.Project Name: Light Rail Transit (LRT) - DepotClient: Qatar RailProject Cost: 4 Billion QARContract Type - Design and Build – (FIDIC YELLOW BOOK, 1999) Project Scope: The LRT connects the city to the Doha Metro System, providing modern transportation links to Doha and Hamad International Airport. The LRT has 4 main operating lines with a total of 33km trainways, the network has 28 stations across 3 lines, 15 at-grade stations and a 155,000m2 depot facility.Scope of work at Depot consists of Bulk Power Station, Underground Water Storage Facility, Central Chilled Water Plant, Substations, Tram Service Station (Steel Structure), Tramway Maintenance Building (Steel Structure), AOCC (Operation control center), Tram Stabling Building, Equipment storage facility, Security buildings, Utility Corridors (Storm, Fire, Foul, Potable, Chilled Water, MV, LV Networks), Internal Roads, Hard and Soft Landscaping. Show less

    • Worley

      Jan 2020 - Dec 2020
      Planning Engineer

      • Reviewing Contractor’s work program submissions including all narratives and supporting information, and provides analysis and findings• Reviewing Contractor’s daily/ weekly/monthly reports and provides analysis and findings• Verifying actual progress and comparing actual performances to original plans• Prepare weekly lookahead plans for Client• Produce the Project Monthly and Weekly Progress Reports. The reports will consist of progress related to design, construction, planning & documentation• Ensure to maintain Master Deliverable Register throughout the project.• Evaluating Contractor’s Extension of Time requests and preparing recommendations to the Engineer.• Assist Resident Engineer to prepare the letters related to Planning issues• Coordinate Progress & Planning Meetings and manage MOMs.• Weekly Site walks with Contractor to monitor the progress and compare the weekly lookahead plans• Point of contact for Change Management (FCRs), different monitoring trackers, procurement logs, outstanding issues & Snag ListProject Name: Hamad Port - Container Terminal 2 (CT2)- Phase 1 and 2o Client: Qatar Terminalo Contractor: QBCo Supervision Consultant: WorleyParsons WLL Qataro PMC: ARCADISContract Type - Design and Supervision Consultancy. Project scope consists of piled concrete beam for the Rear Rail of the STS Crane, Supply and installation of the front and rear crane rails for the STS Cranes, underground duct banks including conduits and manholes for MV and LV Electrical and all Communications networks, Underground utilities (storm, foul, fire and potable water systems, construction of heavy-duty concrete block container pavements, internal roads and reinforced concrete RTG Beams, street lights and highmasts, Diesel Generator House, Yard and Quayside substations and Reefer Stack Gantries. Show less

    • QDVC (P.Q.S.C)

      Feb 2021 - now
      Project Controls

      • Preparing & Managing Baseline/ Updated & Revised Programmes in Primavera P6 • Managing Project Control Procedures for Subcontractors• Managing Progress Monitoring Trackers for all the External Works including Roads/ Landscape/ Dry & Wet Utilities.• Managing Progress Trackers for Buildings including Substations/ Functional Buildings• Managing Subcontractors & Own Progress Monitoring Sheets & Volumetric• Compile and prepare the presentations for Monthly Management & Client Meetings• Preparation of detailed progress measurement templates and prepare dashboards, charts & curves for management meetings• Prepare and manage progress trackers for infrastructure works including utilities and road works• Reviewing subcontractor’s work program submissions including all narratives and supporting information, and provides analysis and findings• Reviewing subcontractor’s daily/ weekly/monthly reports and provides analysis and findings• Verifying actual progress and comparing actual performances to original plans• Prepare weekly lookahead plans for Client• Prepare/ Review forensic delay analysis and Extension of Time (EOT) reports.• Prepare project execution plan for client submissionProject Name: Development of Doha Airbase (DDAB)o Client: Qatar Armed Force (QAF)o Engineer/ Consultant: QECEo Project Value: 2.7 Billion QARContract Type - Design and Build – (FIDIC YELLOW BOOK, 1999). The project consists of 62 main facilities with 163,000 m2 built up area. Project Scope includes aircraft parking and maintenance hangars, accommodation facilities for officers, maintenance/ services / support / operations facilities/ gym/ mosque/ substations, external works consisting of underground utilities (Storm, Foul, Fire, Potable, TSE, Irrigation, MV, LV, ELV and Telecom Networks), road works, aprons and AGL, boundary walls, gates, fencing, hard and soft-scaping. Show less

  • Licenses & Certifications

    • Advanced Primavera P6 Professional

      CMCS - Collaboration Management & Control Solutions
      Jun 2016
    • Engineer-A Department of Urban Affairs India

      Government of Kerala
      Mar 2021
    • Analyzing and Visualizing Data with Microsoft Power BI

      Leaders Training Centre, Doha, Qatar
      Oct 2022
    • MMUP UPDA Grade A

      Ministry of Municipality and Environment, Qatar
      Oct 2016