Muhammad Ejaz

Muhammad Ejaz

Chief Technician

Followers of Muhammad Ejaz388 followers
location of Muhammad EjazPakistan

Connect with Muhammad Ejaz to Send Message

Connect

Connect with Muhammad Ejaz to Send Message

Connect
  • Timeline

  • About me

    Maintenance Engineer (Power Gen.)

  • Education

    • School of Aeronautics Pakistan Air Force Karachi

      1983 - 1984
      Faculty of Science Technical Group C

      Activities and Societies: Playing football, reading and traveling. I have completed faculty of science from Pakistan Air Force Academy (School of Aeronautics - Technical Group).

  • Experience

    • Pakistan Air Force

      Jan 1985 - Nov 1999
      Chief Technician

      1, Managing and supervision of technical staff for repairing and maintenance of 135 KVA 50 Hz F.G Willsion, 68/79 KVA 50/60Hz M/Benz, 62.5 KVA 50 Hz Caterpillar, 20 KVA Siemens gen-sets & batteries charging room.2, Supervision of technical staff for repairing & maintenance of 100 KVA 50 Hz, 100 KVA 400 Hz Caterpillar gen-set, MUPS/UPS system, ATPs, air conditioners (Three/Single Phase), air conditioning plant & batteries charging room.3, Repair and maintenance center supervision of 62.5 KVA 50 Hz Caterpillar, 20 KVA 50 Hz Siemens gen-sets, UPS system, ATPs, special vehicles, common user vehicles auto electric system and batteries charging room.4, To repair and maintaining of special vehicles, common user vehicles auto electric system and batteries charging room.5, Gen-sets troubleshooting, rectifications and operation of 62.5 KVA 50 Hz Caterpillar, 20 KVA 50 Hz Siemens, 20 KVA 50 Hz Newman, MUPS/UPS system, ATPs, air conditioners (Single/Three Phase), special and common user vehicles auto electric system. Show less

    • Dewan Textile Mill # 2, S.I.T.E Kotri.

      May 2001 - Sept 2002
      Shift Engineer

      Erection, commissioning, synchronization, and maintenance of 5.8 Megawatt Power Generation Plant (Waukesha gas operated units) equipped with heat exchangers & cooling towers system and entitled as a "Shift Engineer".

    • Olayan General Contracting Co. (KSA)

      Oct 2002 - Sept 2006
      Electrical Service Engineer

      Start-up/commissioning, troubleshooting & rectification of 11 KVA to 2500 KVA 60 Hz Cummins Power Generation System equipped with PCC-3100, PCC-3200, PCC-1300, PCC-1301, PCC-1302, PCC-2100, CS-1001, CS-1002, PCL-001, PCL-002, Detector- 7 &12 controllers and addresses issues that impact completion of the repair plan in time as an “Electrical Service Engineer”.

    • General Electric International Inc. (Qatar)

      Nov 2006 - Dec 2006
      In-charge Power Supply Management

      Power Supply Management of Cummins Power Generation Systems including testing/commissioning, operation, maintenance, troubleshooting & rectification in 15th Asian Games Doha (Qatar) 2006 at different localities.

    • Cummins S&S Pakistan Ltd.

      Mar 2007 - May 2008
      Electrical Service Engineer

      Start-up/commissioning, troubleshooting, rectification of 20 KVA to 2500 KVA 50 Hz Cummins Power Gen-sets equipped with different Power Command Control Systems and designated as an "Electrical Service Engineer".

    • Sawary Trading & Contracting Co. Ltd. (KSA)

      Jul 2008 - May 2015
      Service Manager

      To manage and organize 15Megawatt Power Project (Kohler Power Systems) at Arabian Pipe Coating Co. Ltd. commissioning, synchronization, troubleshooting, rectification, operation and PM activities. My responsibilities included to develop a strong relationship with key customers through frequent and professional communication. I supervise and interact with technical staff regarding installations troubleshooting, related software’s handling, top-end, major overhauling aligned with customer enquiries. I oversee the GSM with STC and Power Rent operational activities (Cummins, Kohler & MTU Onsite Energy units) at Service Centre Riyadh as a “Service Manager” Show less

    • Abdulaziz Al-Binali Trading Co. Ltd. (KSA)

      Jun 2015 - now
      Power Projects Team Leader

      Commissioning of 14 Megawatts Power Project and manage variety of generators with different series of engines (Cummins KTA50-G3, KTA38-G4, MTU12V2000G85, MTU16V4000G85 & Volvo Penta) in synchronized sequence at West Avenue Mall Dammam. The arising issues are prioritized by execution of qualified technicians to maintain a total quality service standard by ensuring and implementation of safety working practices. My responsibilities included to provide technical and analytical support to achieve the optimum level of operation by applying a lay down standard service methods with higher productivity as a “Power Projects Team Leader”. Show less

    • Sadiq Poultry Pvt. Ltd.

      Oct 2020 - now
      Maintenance Engineer
  • Licenses & Certifications

    • DAE Electrical (Duration of completion three years)

      School of Aeronautics Pakistan Air Force Academy Karachi
      Nov 1981
    • Apprenticeship (Electrical Technology)

      School of Aeronautics Pakistan Air Force Korangi Creek
      Nov 1981
  • Volunteer Experience

    • 15th Asian Games Doha (Qatar) 2006 at different localities.

      Issued by General Electric International Inc. on Nov 2006
      General Electric International Inc.Associated with Muhammad Ejaz